  241   Fri May 27 06:38:27 2016 TD, AE & CGFriday 27 May 201614.30 DSSSD stack moved upstream to position
DSSSD#3 at centre of EURICA.
 13x 
  750   Fri Oct 26 03:28:10 2018 OH, CAFriday 26 OctoberOctober 25th:
In anticipation of losing access in the evening
on arrival at RIKEN the following was done:
 181026_1150_bias.png181026_1151_FEETemp.png181026_1334_Bias.png181026_1335_FEETemp.png181026_1400_Stats.png 
  601   Fri May 26 02:20:42 2017 CB, OH, NNFriday 26 May10.20 DAQ continues OK 
      Current file May2017/R27_22
 15x 
  349   Fri Aug 26 02:10:31 2016 TDFriday 26 August10.11 R9 continues

      ASIC settings 2016Aug20-15.34.53
 28x 
  467   Fri Nov 25 07:33:44 2016 TDFriday 25 November16.35 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      note - the significant increase observed
 9x 
  930   Fri Nov 24 10:36:06 2023 NHFriday 24 NovemberPulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and
aida04 
 Screenshot_from_2023-11-24_11-47-29.pngScreenshot_from_2023-11-24_11-47-39.pngScreenshot_from_2023-11-24_11-48-14.pngScreenshot_from_2023-11-24_12-00-33.png 
  810   Fri May 24 03:04:26 2019 TDFriday 24 May11.04 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 15x 
  719   Fri Jun 22 02:50:37 2018 OH, TDFriday 22 June 201810:50 Yesterday 4 FEE modules installed for
FEE64s 25-32
      dhcpd.conf updated to reflect MAC addresses
 60.png70.png71.pngstartup.tcldhcpd.conf 
  397   Fri Oct 21 01:41:54 2016 TDFriday 21 October
09.38 DAQ (R66) continues OK
 14x 
  859   Fri Jun 21 01:08:35 2019 CA, CBFriday 21 June09.08 all system wide checks okay *except*
naida7 fails adc calibration
      mismatch between sync pulses received
 21junSync.png20june_2319_temps.png21jun_bias.png 
  677   Fri Oct 20 01:43:40 2017 OHFriday 20th October09:43 DAQ continues ok
      System wide checks all ok
      Detector bias and leakage ok - Attachment
 6x 
  354   Fri Sep 2 06:22:26 2016 TDFriday 2 September14.20 R11 continues

      DSSSD bias/leakage current OK - see
 17x 
  757   Fri Nov 2 00:57:24 2018 CA, CB, TD, OHFriday 2 November09.58 DAQ continues OK - current file Oct18/R15_6
      alpha background run
 14x 
  623   Fri Jun 2 00:01:48 2017 OH, PW, CBFriday 2 June 08:00-16:0008:05 Briken and BigRIPS stopping daqs
      AIDA on file R1_1099
 9x 
  622   Thu Jun 1 16:06:03 2017 NNFriday 2 June 00:00-08:00 00:35   Beam is on
        current AIDA file R1_996
 14x 
  514   Thu Dec 1 16:01:10 2016 CG, PVFriday 2 December00.07 BigRIPS data file 1135

01.07 BigRIPS data file 1136.
 14x 
  576   Fri May 19 02:44:14 2017 TD, CB, OHFriday 19th May10:44 System wide checks all ok
      Leakages and biases all ok (see attachment
1)
 190517_bias1045.png190517_feetemp1045.png190517_goodevents1056.png 
  337   Fri Aug 19 07:42:22 2016 TD, PVFriday 19 August
14.00 Both AIDA NIM bins U/S 
      Upper NIM bin - BNC PB-4, Ortec 433,
 6x 
  338   Fri Aug 19 09:43:27 2016 TD, VP, reply PJCSFriday 19 August
> 14.00 Both AIDA NIM bins U/S 
>       Upper NIM bin - BNC PB-4, Ortec 433,
  
  339   Fri Aug 19 11:07:44 2016 TD, VP, reply PJCSFriday 19 August> > 
> > 14.00 Both AIDA NIM bins U/S 
> >       Upper NIM bin - BNC PB-4, Ortec
 7.png 