Wed Jan 20 12:00:19 2016, CG, TD, Wednesday 20 January 2016 6x
|
11.58 Repeat yesterday's test - no significant change observed
nnaida11 - input -, shaping time 2us - attachment 1
|
Wed Jan 20 17:02:47 2016, CG, TD, Ribbon cable + coupler tests at DL 17x
|
18/01/16
Set up as last week but with 8us shaping time.
With detector connected, still seeing rail-to-rail noise on waveforms in nnaida13 and double peaking in all nnaida. |
Thu Jan 28 13:53:29 2016, CG, TD, Ribbon cable + coupler tests at DL - 25-26th Jan 15x
|
25/01/16
On start up, received error when trying to access spectrum browser (attachment 1) => required restart of 'Http for AIDA'
At 2us shaping time, and all other setting as last week, the situation remains the same |
Tue Feb 2 14:08:44 2016, CG, TD, Report: Low - No SYNCs from FEEs
|
Currently running with a source, and everything seems to be running fine in terms of histograms doing what we expect, no error messages etc.
Tried to start the merger and tape server, but the merger reports as waiting for the first SYNC.
Checked the stats page and sure enough, no SYCs are being produced. |
Tue Feb 2 17:32:46 2016, CG, TD, Tuesday 2 February 2016 9x
|
Bias +200V, I_L +6.955uA, ambient temp +20.2 deg C
MSL type BB18(DS)-1000 2998-20
|
Wed Feb 3 15:34:30 2016, CG, TD, Ribbon cable + coupler tests at DL 1st-2nd Feb
|
01/02/16
Started up system. Biased det to +200V |
Tue Feb 9 17:27:12 2016, CG, TD, Ribbon cable + coupler tests at DL 8-9th Feb    
|
08/02/16
Spoke to PJC-S -> Ethernet cables from FEEs to switch are all 4m Cat6.
System powered on with bias to detector of +200V and leakage current of 6.4uA at room temp 19.0oC. |
Wed Feb 10 10:56:02 2016, CG, TD, 9-10 February 2016 7x
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature +19.9 deg C
|
Tue Feb 16 17:32:21 2016, CG, TD, 16 February 2016
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature +20.1 deg C
|
Wed Feb 17 11:54:50 2016, CG, TD, 17 February 2016 6x
|
File R17 -> pulser walkthrough.
- Started ~10.00
- Pulser peak amplitude taken from 9.0V to 1.0 V in 1.0V steps
|
Mon May 30 06:03:51 2016, CG, TD, MACB settings
|
14.00 MACB settings (from left -> right)
MACB#
1
2
3
4
5
6
7
|
Sun Oct 2 15:03:11 2016, CG, TD, Problems compiling AIDAsort program on aidas1  
|
I have been trying to compile the sort program I have been working on in Edinburgh so I can work on it locally
while at RIKEN.
|
Sun Oct 9 11:47:34 2016, CG, TD, Sunday 9th October 9x
|
12.30 Following scheduled power outages of October 8
|
Tue Apr 26 10:06:59 2016, CG, PV & TD, Tuesday 26 April
|
2 (of 3) WD 3Tb ATA disk drives are not currently mounted on aidas1.
Attempted to mount them but found device names changed at each boot.
|
Thu Dec 1 16:01:10 2016, CG, PV, Friday 2 December 14x
|
00.07 BigRIPS data file 1135
01.07 BigRIPS data file 1136.
|
Thu Jan 7 16:04:44 2016, CG, PJCS, PCS Reply to RIKEN progress - 15/12/15 (late)
|
Quote:
Tues 15/12/15 |
Mon Nov 7 02:13:05 2016, CG, OH, TD, DK, Monday 7 November 10x
|
11.10 DAQ found stopped. No storage mode so can't tell when, but presumably at 06.30 during LN2 fill cycle.
Unable to regain control of (see errors after merger restart in attachment 1) system so power cycling FEEs.
|
Fri Mar 31 17:21:56 2017, CG, OH, DK, Saturday 1 April - Run status 9x
|
00.46 34Ne stopped for 36Ne setting (R19_37).
DAQ kept running as I was upstairs getting some food.
Stopped at R19_45.
|
Tue Mar 21 08:04:43 2017, CG, OH, Tuesday 21 March - AIDA checks    
|
10.00 Powered system on and biased.
Bias voltages and leakage currents ok (see att. 1). Ambient temp @23.1oC.
|
Thu Mar 23 10:56:29 2017, CG, OH, Thursday 23rd March - DSSD replacement + move 7x
|
10.00 Investigating DSSD2 (MSL BB18-1000 3058-9) missing channels, found broken bond wires on rear side (~1/4).
Replaced with 3058-3.
|