Entry  Wed Jan 20 12:00:19 2016, CG, TD, Wednesday 20 January 2016 6x
11.58 Repeat yesterday's test - no significant change observed

nnaida11 - input -, shaping time 2us - attachment 1
Entry  Wed Jan 20 17:02:47 2016, CG, TD, Ribbon cable + coupler tests at DL 17x
 18/01/16
Set up as last week but with 8us shaping time.
With detector connected, still seeing rail-to-rail noise on waveforms in nnaida13 and double peaking in all nnaida.
Entry  Thu Jan 28 13:53:29 2016, CG, TD, Ribbon cable + coupler tests at DL - 25-26th Jan 15x
 25/01/16
On start up, received error when trying to access spectrum browser (attachment 1)   => required restart of 'Http for AIDA'
At 2us shaping time, and all other setting as last week, the situation remains the same
Entry  Tue Feb 2 14:08:44 2016, CG, TD, Report: Low - No SYNCs from FEEs noSYNCs.png
Currently running with a source, and everything seems to be running fine in terms of histograms doing what we expect, no error messages etc.
Tried to start the merger and tape server, but the merger reports as waiting for the first SYNC.
Checked the stats page and sure enough, no SYCs are being produced.
Entry  Tue Feb 2 17:32:46 2016, CG, TD, Tuesday 2 February 2016 9x
Bias +200V, I_L +6.955uA, ambient temp +20.2 deg C

MSL type BB18(DS)-1000 2998-20
Entry  Wed Feb 3 15:34:30 2016, CG, TD, Ribbon cable + coupler tests at DL 1st-2nd Feb 
01/02/16
Started up system. Biased det to +200V 
Entry  Tue Feb 9 17:27:12 2016, CG, TD, Ribbon cable + coupler tests at DL 8-9th Feb allnnaida_inSafe_cablesIsolated_0.5us.pngallnnaida_inSafe_cablesIsolated_1us.pngallnnaida_inSafe_cablesIsolated_2us.pngallnnaida_inSafe_cablesIsolated_4us.pngallnnaida_inSafe_cablesIsolated_8us.png
08/02/16
Spoke to PJC-S -> Ethernet cables from FEEs to switch are all 4m Cat6.
System powered on with bias to detector of +200V and leakage current of 6.4uA at room temp 19.0oC.
Entry  Wed Feb 10 10:56:02 2016, CG, TD, 9-10 February 2016 7x
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature +19.9 deg C
 
Entry  Tue Feb 16 17:32:21 2016, CG, TD, 16 February 2016 
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature +20.1 deg C
 
Entry  Wed Feb 17 11:54:50 2016, CG, TD, 17 February 2016 6x
File R17 -> pulser walkthrough.
     - Started ~10.00
     - Pulser peak amplitude taken from 9.0V to 1.0 V in 1.0V steps
Entry  Mon May 30 06:03:51 2016, CG, TD, MACB settings 
14.00 MACB settings (from left -> right)

    
        
            MACB#
            1

           2
            3
            4
            5
            6
            7
       
Entry  Sun Oct 2 15:03:11 2016, CG, TD, Problems compiling AIDAsort program on aidas1 make.logmake.logEditransfer.h

I have been trying to compile the sort program I have been working on in Edinburgh so I can work on it locally
while at RIKEN.
Entry  Sun Oct 9 11:47:34 2016, CG, TD, Sunday 9th October 9x

12.30 Following scheduled power outages of October 8
Entry  Tue Apr 26 10:06:59 2016, CG, PV & TD, Tuesday 26 April 

2 (of 3) WD 3Tb ATA disk drives are not currently mounted on aidas1.
Attempted to mount them but found device names changed at each boot.
Entry  Thu Dec 1 16:01:10 2016, CG, PV, Friday 2 December 14x
00.07 BigRIPS data file 1135

01.07 BigRIPS data file 1136.
    Reply  Thu Jan 7 16:04:44 2016, CG, PJCS, PCS Reply to RIKEN progress - 15/12/15 (late) 


    
        
            Quote:
        
        
            

            Tues 15/12/15
Entry  Mon Nov 7 02:13:05 2016, CG, OH, TD, DK, Monday 7 November 10x
11.10 DAQ found stopped. No storage mode so can't tell when, but presumably at 06.30 during LN2 fill cycle.
      Unable to regain control of (see errors after merger restart in attachment 1) system so power cycling FEEs.
Entry  Fri Mar 31 17:21:56 2017, CG, OH, DK, Saturday 1 April - Run status 9x
00.46 34Ne stopped for 36Ne setting (R19_37).
      DAQ kept running as I was upstairs getting some food.
      Stopped at R19_45.
Entry  Tue Mar 21 08:04:43 2017, CG, OH, Tuesday 21 March - AIDA checks bias1.pnglayout4.pngnnaida19.pnglayout3.pngnnaida13.png
10.00 Powered system on and biased.
      Bias voltages and leakage currents ok (see att. 1). Ambient temp @23.1oC.
      
Entry  Thu Mar 23 10:56:29 2017, CG, OH, Thursday 23rd March - DSSD replacement + move 7x

10.00 Investigating DSSD2 (MSL BB18-1000 3058-9) missing channels, found broken bond wires on rear side (~1/4).
      Replaced with 3058-3.