  142   Wed Jan 20 12:00:19 2016 CG, TDWednesday 20 January 201611.58 Repeat yesterday's test - no significant
change observed
 6x 
  144   Wed Jan 20 17:02:47 2016 CG, TDRibbon cable + coupler tests at DL 18/01/16
Set up as last week but with 8us
shaping time.
 17x 
  146   Thu Jan 28 13:53:29 2016 CG, TDRibbon cable + coupler tests at DL - 25-26th Jan 25/01/16
On start up, received error when
trying to access spectrum browser (attachment
 15x 
  147   Tue Feb 2 14:08:44 2016 CG, TDReport: Low - No SYNCs from FEEsCurrently running with a source, and everything
seems to be running fine in terms of histograms
doing what we expect, no error messages etc.
 noSYNCs.png 
  148   Tue Feb 2 17:32:46 2016 CG, TDTuesday 2 February 2016Bias +200V, I_L +6.955uA, ambient temp +20.2
deg C
 9x 
  149   Wed Feb 3 15:34:30 2016 CG, TDRibbon cable + coupler tests at DL 1st-2nd Feb01/02/16
Started up system. Biased det to
+200V 
  
  150   Tue Feb 9 17:27:12 2016 CG, TDRibbon cable + coupler tests at DL 8-9th Feb08/02/16
Spoke to PJC-S -> Ethernet cables
from FEEs to switch are all 4m Cat6.
 allnnaida_inSafe_cablesIsolated_0.5us.pngallnnaida_inSafe_cablesIsolated_1us.pngallnnaida_inSafe_cablesIsolated_2us.pngallnnaida_inSafe_cablesIsolated_4us.pngallnnaida_inSafe_cablesIsolated_8us.png 
  151   Wed Feb 10 10:56:02 2016 CG, TD9-10 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature
+19.9 deg C
 7x 
  152   Tue Feb 16 17:32:21 2016 CG, TD16 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature
+20.1 deg C
  
  153   Wed Feb 17 11:54:50 2016 CG, TD17 February 2016File R17 -> pulser walkthrough.
     - Started ~10.00
     - Pulser peak amplitude taken from 9.0V
 6x 
  256   Mon May 30 06:03:51 2016 CG, TDMACB settings14.00 MACB settings (from left -> right)

    
  
  
  369   Sun Oct 2 15:03:11 2016 CG, TDProblems compiling AIDAsort program on aidas1
I have been trying to compile the sort program
I have been working on in Edinburgh so I
 make.logmake.logEditransfer.h 
  380   Sun Oct 9 11:47:34 2016 CG, TDSunday 9th October
12.30 Following scheduled power outages of
October 8
 9x 
  188   Tue Apr 26 10:06:59 2016 CG, PV & TDTuesday 26 April
2 (of 3) WD 3Tb ATA disk drives are not currently
mounted on aidas1.
  
  514   Thu Dec 1 16:01:10 2016 CG, PVFriday 2 December00.07 BigRIPS data file 1135

01.07 BigRIPS data file 1136.
 14x 
  139   Thu Jan 7 16:04:44 2016 CG, PJCSPCS Reply to RIKEN progress - 15/12/15 (late)


   
        
            
  
  428   Mon Nov 7 02:13:05 2016 CG, OH, TD, DKMonday 7 November11.10 DAQ found stopped. No storage mode so
can't tell when, but presumably at 06.30
during LN2 fill cycle.
 10x 
  548   Fri Mar 31 17:21:56 2017 CG, OH, DKSaturday 1 April - Run status00.46 34Ne stopped for 36Ne setting (R19_37).
      DAQ kept running as I was upstairs
getting some food.
 9x 
  533   Tue Mar 21 08:04:43 2017 CG, OHTuesday 21 March - AIDA checks10.00 Powered system on and biased.
      Bias voltages and leakage currents
ok (see att. 1). Ambient temp @23.1oC.
 bias1.pnglayout4.pngnnaida19.pnglayout3.pngnnaida13.png 
  534   Thu Mar 23 10:56:29 2017 CG, OHThursday 23rd March - DSSD replacement + move
10.00 Investigating DSSD2 (MSL BB18-1000
3058-9) missing channels, found broken bond
 7x 