Mon Apr 27 04:54:02 2015, VFEP & TD, [How To] Remote control of CAEN N1419 Programmable HV Power Supply 
|
@ CAEN N1419
|
Mon Apr 27 01:48:59 2015, JA, LHB, TD, VP, AE & CG, Monday 27 April 2015 8x
|
DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
|
Sun Apr 26 02:28:59 2015, JA, LHB, TD, AE & CG, Sunday 26 April 2015 33x
|
Upstream, 207Bi source
|
Sat Apr 25 03:56:44 2015, JA, LHB, TD, AE & CG, Saturday 25 April 2015   
|
1130: Rotated forward water inlet connection to point towards rear of AIDA stand to remedy mechanical
conflict with EURICA support frame - see attachments. During drain and re-fill of Julabo FL1106
|
Fri Apr 24 08:11:04 2015, CG, AE & TD, Thursday 23 April 2015 contd
|
Image of interior of closed EURICA array with AIDA inserted. |
Thu Apr 23 10:27:59 2015, CG, AE, TD, Thursday 23rd April progress   
|
23/04/15
1800: Spent majority of the day moving AIDA forward and into EURICA.
So far everything seems to fit very well, we have just noticed a few points of possible |
Wed Apr 22 03:33:01 2015, TD, FEE64 Fast Discriminator OR o/p via MACB 
|
Illustration of the trigger timing of the AIDA FEE64 fast discriminator OR output via the
MACB front panel Trigger outputs.
|
Thu Apr 23 09:02:57 2015, TD, Patrick, FEE64 Fast Discriminator OR o/p via MACB
|
> Illustration of the trigger timing of the AIDA FEE64 fast discriminator OR output via the
> MACB front panel Trigger outputs.
>
|
Thu Apr 23 03:21:48 2015, TD, MSL type BB18(DS)-1000
|
MSL type BB18
Serial Thickness Depletion Date Note Location
|
Wed Apr 22 08:50:59 2015, CG, AE, TD, Wednesday 22nd April progress   
|
22/04/15
1230: Solved problem (empty spectra despite changing modules) with nnaida5 noted in previous progress update.
During Feb tests, nnaida5 was very noisy compared to other nnaida => switched it to medium |
Wed Apr 22 07:28:25 2015, AE (PM), Mechanical setup instructions: AIDA+EURICA at F11
|
Attached are Paul Morrall's instructions on how to move new AIDA support table into place, for a setup with
EURICA at F11 (March 2015). |
Tue Apr 21 09:39:00 2015, AE, LISE estimates for implantation setup [updated] 
|
[UPDATED 22/4: initial LISE file had incorrect thickness for MACi plastic]
Calculations for Al degrader thickness required to implant ions in AIDA DSSD stack.
|
Tue Apr 21 06:01:50 2015, CG, TD, Tuesday 21 April 2015 8x
|
21/04/15
1325: Recabled the MACB distribution tree as per PC-S instruction yesterday.
Now have nnaida5+6, 13+14 in MACB3 (nnaida5 in output 1) and nnaida3+4, 11+12 in MACB10 |
Mon Apr 20 06:53:24 2015, CG, TD, Progress 20th April + RPi procedure 7x
|
20/04/15
1200: Complete all points on first part of check list, except checking the PSU voltages.
System now in powered and has all network/HDMI cables attached. |
Mon Apr 20 09:07:59 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply
|
Quote:
20/04/15 |
Mon Apr 20 09:38:15 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply
|
Quote:
|
Mon Apr 20 09:45:38 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply ++
|
Quote:
|
Mon Apr 20 07:39:49 2015, CG, TD, Rasberry Pi : USB ac mains switch + USB serial link to FEE64 console
|
It would appear that you cannot reliably startup the Raspberry Pi (nnrpi1)
connected to both the USB ac mains switch *and* the USB-serial link to FEE64
|
Sat Apr 18 09:30:11 2015, CG, To do list 19/04/15 - 21/04/15
|
To do (roughly in order):
Move shipped boxes down from Gabor's office to the experimental area. Check contents. Should include:
3x
3Tb HDD
NIM floating HV supply
2x Si detector boxes, containing MSL type BB18 detectors 3131-9 + 3131-11 and 3058-9 |
Mon Mar 9 16:51:26 2015, TD, AIDA adaptor PCB configuration - RIKEN - Feb 2015 6x
|
|
Mon Mar 9 16:45:35 2015, TD, Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains 7x
|
3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz via local transformer |
Mon Mar 9 13:59:32 2015, TD, New AIDA support frame for F11/F12 @ RIKEN
|
|
Mon Mar 9 09:02:03 2015, Patrick Coleman-Smith, Adding Filters to the AIDA PSU.
|
This guide is to help with the filter pcb assembly and installation into the AIDA power supply. |
Thu Mar 5 12:11:44 2015, TD, To Do list - March 2015
|
A draft 'to do' list in preparation for further AIDA tests at RIKEN from mid-April.
Please feel free to add your comments, suggestions, other items etc.
|