AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 43 of 46  ELOG logo
Entry  Wed Jun 8 05:00:53 2016, TD, Analysis of R1229 10.png11.png12.png13.png

Files R1229_0 ... R1229_3 (written by TapeServer without data compression)
Entry  Wed Jun 8 03:57:59 2016, TD, Analysis of R1222 1.png2.png3.png4.png
Timestamp data per FEE per 10s (i.e. 1 ch = 10s)

s3501-s3524 ADC data
Entry  Sat May 13 03:16:16 2017, TD, Analysis of May2017/R1_0 to May2017/ R1_79 11x

See https://elog.ph.ed.ac.uk/AIDA/555
Entry  Wed Mar 29 00:23:12 2017, TD, Analysis of Mar2017/R3 8x
Analysis of Mar2017/R3_0 ... R3_9 by MIDASsort

*** ENTRY finish
Entry  Sun Jul 31 09:38:07 2016, TD, Analysis of AIDA75_1 AIDA75_1.txtUntitled.png200.png400.png
Attachment 2 - analysis from *end* of file AIDA75_1

2D spectrum - FEE # versus timestamp (100us/channel)
Entry  Fri Jul 8 18:54:47 2016, TD, Analysis July2016/R1 data R1_0.outR1_114.outanalyser2.fUntitled.png

See https://elog.ph.ed.ac.uk/AIDA/324
Entry  Fri May 13 13:24:42 2016, Patrick Coleman-Smith, An idea that might help when everything grinds to a halt 
When using the T9 system and running with too much rate in one FEE64 so the system is unbalanced.
I found a good way to understand this and to be able to operate the controls of the FEE64s was to place the Merger in "Pause" mode.
Then the data is extracted from the busy FEE64 but it can still be controlled.
Entry  Mon Nov 6 17:30:44 2023, NH, Aida Alpha Analysis alpha_hit.pngalpha_energy.pngalpha_energy_xy.pngalpha_strip_v_energy.png
Analysis of tape folder /TapeData/BG18OCT23

Using Go4 https://github.com/cej25/DESPEC_NOV23
Entry  Mon Mar 9 09:02:03 2015, Patrick Coleman-Smith, Adding Filters to the AIDA PSU.  Assembly_of_the_AIDA_PSU_filter_and_installation_guide.pdf
 This guide is to help with the filter pcb assembly and installation into the AIDA power supply.
Entry  Mon Mar 14 11:27:47 2016, PJCS, ASIC_clock synchronisation across the system R44_0.zip.zip
During 'SETUP' the ASIC readout clock ( 500KHz ) is synchronised to the SYNC pulse in V8.10 and later versions of the VHDL.
Attached is a short run for verification.
 
Entry  Wed Apr 12 12:32:13 2023, PJCS, ASIC power short problem Mezzanine_Under_test_Wider_view_resized.jpgMezzanine_Under_test_resized.jpg
I have taken videos with an Infrared camera of the power being supplied to one isolated ASIC on a mezzanine.

The power supply is a bench supply with current limit set to 3A.

The centre of the ASIC glowed white hot for a short time and then the whole ASIC shows as hot. Ths the short is on the ASIC and not the bond
Entry  Tue Aug 21 12:29:44 2018, OH, TD, AIDA@DESPEC dhcpd.conf, dhcpd startup and log messages dhcpd.confdhcdConfStartup.txtmessagesLog.txt

Attachment 1 - DHCP configuration file /etc/dhcpd.conf
    Reply  Wed Aug 22 09:10:28 2018, OH, TD, AIDA@DESPEC dhcpd.conf, dhcpd startup and log messages 

> Attachment 1 - DHCP configuration file /etc/dhcpd.conf
Entry  Fri May 17 08:10:05 2019, TD, AIDA+DTAS @ BigRIPS F11 10x
 
Entry  Mon May 13 10:13:26 2019, TD, AIDA with 25MHz external clock does not work ... ! 2.png

OH setup AIDA external clock using  Tektronix AFG3102 - settings as follows
Entry  Wed Jul 20 18:41:55 2016, DK, AIDA topped up on water 
 I actually topped off the chiller with water tonight as I am returning to Scotland (and then off to CERN) within hours.
I added 4 liters on around July 5th, to move the marker from a little under the halfway mark to over the halfway mark.  After 2.x weeks, it
was still sitting a bit shy of under the halfway mark.  This means that in a humid and hot Japanese month like July, AIDA doesn't evaporate more than
Entry  Thu Nov 23 01:12:33 2017, TD, CB, AIDA to safe shutdown state 
10.11 Detector bias OFF
      FEE64 power OFF
      BNC PB-4 OFF
Entry  Thu Nov 16 09:09:58 2023, TD, JB, CC, VP, AIDA tests 16/11/2023 48x
Viewing AIDA status on Thursday morning 16/11/2023. 

Rates and histograms are observed with bPlast HV connected but not powered. The LIMO cables to the booster cards of bPlast are connected and the TAMEX
Entry  Fri Nov 17 09:19:41 2023, TD, CC, VP, AIDA test 17/11/2023 46x
We restarted AIDA (a10277ttachment 6) this morning and checked rates (attachments 3/4) and waveforms (attachments 1/2). Temperatures are shown in attachment
5.
It seems consistent with what was observed yesterday.
Entry  Thu Nov 16 17:43:25 2023, TD, JB, CC, VP, AIDA test 16/11/2023 cont. Screenshot_from_2023-11-16_16-37-22.pngScreenshot_from_2023-11-16_16-36-25.pngScreenshot_from_2023-11-16_16-35-51.pngScreenshot_from_2023-11-16_16-35-30.png
Screenshot uploads as I hit the 50 image upload limit.
ELOG V3.1.3-7933898