AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 44 of 46  ELOG logo
Entry  Mon Oct 23 10:52:06 2023, NH, CC, AIDA test Screenshot_from_2023-10-23_11-53-28.pngScreenshot_from_2023-10-23_11-53-59.pngScreenshot_from_2023-10-23_11-54-43.pngScreenshot_from_2023-10-23_11-54-54.png
Started AIDA at 11:50, writing to disk: file BG18OCT2/R3, stopped around 3 pm

pict1: HV supply
Entry  Mon Oct 23 14:08:06 2023, NH, CC, AIDA test Screenshot_from_2023-10-23_15-08-59.pngScreenshot_from_2023-10-23_15-09-16.pngScreenshot_from_2023-10-23_15-10-01.pngScreenshot_from_2023-10-23_15-09-36.pngScreenshot_from_2023-10-23_18-20-13.png
Started AIDA at 3:05pm, writing to disk: file BG18OCT2/R4, stopped 18.30

pict1: HV supply
Entry  Tue Oct 24 10:54:14 2023, at 19:14NH, CC, AIDA test Screenshot_from_2023-10-24_11-54-48.pngScreenshot_from_2023-10-24_11-55-08.pngScreenshot_from_2023-10-24_11-55-46.pngScreenshot_from_2023-10-24_11-55-33.png
Started AIDA at 11:54am, writing to disk: file BG18OCT2/R5, stopped at 19:14

pict1: HV supply
Entry  Wed Oct 25 12:42:18 2023, CC, AIDA test Screenshot_from_2023-10-25_13-42-54.pngScreenshot_from_2023-10-25_13-43-10.pngScreenshot_from_2023-10-25_13-44-00.pngScreenshot_from_2023-10-25_13-43-46.png
Started AIDA at 1:41 pm, writing to disk: file BG18OCT2/R6, stopped at  17:26
pict1: HV supply
pict2: temperature
Entry  Thu Jun 20 07:42:54 2019, CA, TD, AIDA shutdown checklist 
stop the daq

pause merger
Entry  Mon Jun 6 08:57:34 2016, GL,PW, YS, TD, ML, AIDA run 1112 - Sync problem 
After starting run 1112, we noticed that the merge program was waiting for a first sync. It then turned out that all syncs had disappeared. This required
an entire reboot of the AIDA DAQ. Consequently, AIDA run 1112 should not be used. 
Entry  Tue Jul 5 10:26:11 2016, DK, AIDA relocation pictures 6x
Here are some pictures after AIDA's relocation.
In principle, it can stay here, but probably after the tests we will push it further against the wall.  However, power and ethernet cabling
cannot reach that far.
Entry  Mon May 27 08:29:02 2019, TD, AIDA position within DTAS 

AA informs me that the *centre* of the DTAS detector system is 26.7cm downstream
of the upstream edge of the upstream DTAS NaI(Tl) detectors.
Entry  Thu Jun 16 08:18:50 2016, TD, AIDA photographs - May 2016  IMG_5751.JPGIMG_5721.JPG
 
Entry  Sat Jun 18 14:35:31 2016, TD, AIDA photographs - June 2016 - 4 IMG_5854.JPGIMG_5855.JPGIMG_5856.JPGIMG_5857.JPGIMG_5863.JPG
 
Entry  Thu Jun 16 08:12:51 2016, TD, AIDA photographs - June 2016 - 3 IMG_5849.JPGIMG_5850.JPGIMG_5851.JPG
 
Entry  Thu Jun 16 08:07:37 2016, TD, AIDA photographs - June 2016 - 2 IMG_5842.JPGIMG_5843.JPGIMG_5846.JPGIMG_5847.JPG
 
Entry  Thu Jun 16 08:00:10 2016, TD, AIDA photographs - June 2016 - 1 IMG_5838.JPGIMG_5839.JPGIMG_5840.JPGIMG_5841.JPG
 
Entry  Sat Jun 4 08:46:20 2016, TD, AIDA noise - state of play 2 27x

Attachments  1-23 AIDA FEE64s nnaida1-nnaida23 ASIC #1 waveforms
Entry  Thu Nov 14 07:57:46 2019, TD, AIDA moved from in-beam position at F11 

To make room for the installation of an MR-TOF device at F11, AIDA and DTAS have been removed 
from their in-beam position at F11.
Entry  Wed Apr 10 16:45:59 2024, TD, AIDA interlock cynergy3-fsvplc-v3.pdf

Honeywell HSS DPS sensor information https://elog.ph.ed.ac.uk/AIDA/932
Entry  Thu Oct 27 10:57:49 2016, TD, AIDA data readout 100.png101.png102.png

Developing real-time AIDA data synchronisation test using MIDASsort
Entry  Mon Mar 9 16:51:26 2015, TD, AIDA adaptor PCB configuration - RIKEN - Feb 2015 6x
 
Entry  Mon Dec 4 10:34:48 2023, NH, AIDA Todo for 11.12.23 
This is a short list of things todo or check before the test beam time on 11.12.23 
Updated after 15:00 CET meeting
Entry  Thu Sep 11 17:29:59 2014, Tom Davinson, AIDA Tests at STFC DL - To Do list 

In no particular order of priority:
ELOG V3.1.3-7933898