ID |
Date |
Author |
Subject |
Text |
|
28
|
Fri Jan 30 15:27:35 2015 |
Alfredo Estrade | [Analysis] 207Bi source (R61): check of monitor spectra |
A first look at the data from the 207Bi source
(run described in previous elog entry, ID |
7x |
133
|
Sat Dec 12 03:30:50 2015 |
Alfred, Chris, Phong | change configuration of NNAIDA modules in setup | We want to reduce the configuration of
the setup to 4 FEE cards (8 NNAIDA modules),
so we only have to isolate 4 of them from |
|
263
|
Tue May 31 16:03:24 2016 |
AE. VP | Co/Bi source run (R17) | Set discriminator mask for DSSD2 through DSSD6
(see attachments). Fast comparator threshold
set to 9 for all DSSDs.
|
8x |
218
|
Wed May 11 06:00:56 2016 |
AE, VP, BM (Byul Moon) | FEE64 <-> MACB trigger mapping | Here is the mapping of the trigger output
of MAC-B modules to FEE64 modules
|
|
219
|
Wed May 11 06:01:16 2016 |
AE, VP, BM | Beta trigger | Please find attached the best diagram of the
beta trigger logic circuit for EURICA campaign
2016 |
|
220
|
Wed May 11 06:37:32 2016 |
AE, VP, BM | Wednesday 11 May | *2:30 pm*: changed power source of USB-controlled
power supply for FEEs. Now one of the power
cables is connected
|
|
223
|
Thu May 12 16:55:37 2016 |
AE, VP, BM | Thursday May 12 | Continued work on beta-trigger for EURICA.
However the system seems to have different
noise condition than before, which
|
7x |
227
|
Sat May 14 11:27:09 2016 |
AE, VP | [How To] DAQ correlation monitor (June16 campaign) | The program for online monitoring the correlation
of the DAQ systems (AIDA-EURICA-BigRIPS)
through a common scaler is SyncCheck (J. |
|
306
|
Sat Jun 11 10:29:16 2016 |
AE, TD, LHB | synchronization between different FEEs | file AIDA10_20: stopped on June 10, 14:59
file AIDA10_40: stopped on June 10, 16:16
|
|
474
|
Sat Nov 26 09:17:42 2016 |
AE, TD, DK | Offline analysis of R9_24 |
R9_24 3mm Pb + 0.3mm W (+1mm Al) +
1.0mm W (+1mm Al)
*** data items: 261088000 |
|
652
|
Sat Jun 10 09:24:45 2017 |
AE, TD | Saturday 19 June 16.00-24.00 | 17.25 Detector biases & leakage currents OK
- see attachments 1 & 2
FEE64 Temperatures OK - see attachment |
24x |
484
|
Sun Nov 27 12:30:41 2016 |
AE, PV | Energy loss in Degraders and Implantation for runs 1028 and 1033 | Implantation profile in AIDA
BigRIPS file 1028
(Attachment run1028.png): Degrader |
6x |
305
|
Fri Jun 10 21:07:52 2016 |
AE, DK, TD, ML, MA | Saturday 11 June 2016 | 04.51 Start run AIDA18. Beam is back
from the operators.
Scalers are shown as attachment 1
|
8x |
499
|
Tue Nov 29 19:07:35 2016 |
AE, CG, ATS, AT | F11 conditions after change to C target in F8 [light particles?] | The main experiment changed to a carbon
reaction target at F8 (similar thickness
of CH2 previously used), and retuned the |
|
135
|
Mon Dec 14 19:25:35 2015 |
AE, CG ,Phong | Merger/TapeServer trouble report | Sat. 12/12/15
Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133). |
|
112
|
Tue Jul 14 18:06:54 2015 |
AE, CG | [Data Analysis] Correlation Scaler timestamp in PID data (go4_30**.root) | The attached plots show the time-stamp data
in the EURICA files with PID information
(EventInfo.timestamp). The
|
10x |
493
|
Mon Nov 28 15:53:39 2016 |
AE, AT, RG, CG | DAQ synchronization | We noticed a peculiar feature in the time-stamp
synchronization monitor. The spectra of timestamp
difference between pairs of DAQ systems show, |
7x |
65
|
Wed Apr 22 07:28:25 2015 |
AE (PM) | Mechanical setup instructions: AIDA+EURICA at F11 | Attached are Paul Morrall's instructions on
how to move new AIDA support table into place,
for a setup with
|
|
63
|
Tue Apr 21 09:39:00 2015 |
AE | LISE estimates for implantation setup [updated] | [UPDATED 22/4: initial LISE file had incorrect
thickness for MACi plastic]
|
|
75
|
Tue Apr 28 05:59:48 2015 |
AE | "beta" trigger from MACB Trigger outputs | We've constructed a beta trigger with the
signals from the p-side of the three DSSDs
(OR of all fast
|
6x |