ID |
Date |
Author |
Subject |
Text |
|
82
|
Wed Apr 29 18:12:02 2015 |
AE | online analysis code | A first online analysis code is running now
in Desktop 4 aidas1
|
8x |
92
|
Sat May 2 19:17:25 2015 |
AE | time-stamp for event reconstruction | Some first analysis of building events to
look for implants and decays
|
|
93
|
Sat May 2 19:20:59 2015 |
AE | run R51 online spectra | Online spectra to monitor condition during
run R51.
|
|
99
|
Mon May 4 12:10:35 2015 |
AE | online monitor and data transfer | Online monitor program for AIDA is in
/homes/npg/AIDAonline
|
|
115
|
Fri Jul 17 17:28:35 2015 |
AE | [Data Analysis] Correlation Scaler 100Kr data (go4_30**.root) | Plots of corr-scaler vs event number in Root
files for 100Kr(?) setting: go4_40XX.root.
|
|
217
|
Wed May 11 05:49:51 2016 |
AE | VHDL update to FEE_GF_Feb16_16 | The firmware of all FEEs was updated to the
version in FEE_GF_Feb16_16.bin (https://elog.ph.ed.ac.uk/AIDA/215).
This provides a 25 MHz clock output from |
|
260
|
Mon May 30 18:29:54 2016 |
AE | Co/Bi source run (R7) | Some comments regarding source run for beta-gamma
calibration, to complement EURICA16 elog
entry:
|
|
261
|
Mon May 30 22:57:58 2016 |
AE | Co/Bi source run (R7) | > Some comments regarding source run for beta-gamma
calibration, to complement EURICA16 elog
entry:
|
|
475
|
Sat Nov 26 12:18:25 2016 |
AE | Saturday 26 November, Part III | 19:30 Power cycled of AIDA reuired after Ge
filling
|
6x |
723
|
Sun Jun 24 09:08:03 2018 |
3OH, TD | June 2018 New Stack Configuration | Stack has been changed in configuration from
a 6 DSSD stack to 8 DSSD stack.
What was detectors 1-6 are now 3-8 with 2 |
|
285
|
Mon Jun 6 15:06:22 2016 |
1TD, ML & YS | R1119 | R1118 ended OK
R1119 DAQ GO, check AIDA SYNCs OK, toggle |
|
913
|
Tue Oct 24 10:54:14 2023 |
at 19:14NH, CC | AIDA test | Started AIDA at 11:54am, writing to disk:
file BG18OCT2/R5, stopped at 19:14
|
|
54
|
Mon Mar 9 16:45:35 2015 |
TD | Julabo FL11006 Recirculating Chiller: connection to 3ph ac mains |
3ph 100VAC/50Hz to Julabo FL11006 3ph 230VAC/50Hz
via local transformer |
7x |
96
|
Mon May 4 01:27:56 2015 |
JA, TD, AE, CG & JLT | Monday 4 May 2015 |
09.18 SN changed degrader to 5.7mm Al (4mm
+ all variable degraders + additional 1mm)
|
16x |
83
|
Thu Apr 30 01:06:44 2015 |
JA, LHB, TD, AE, CG & VP | Thursday 30 April 2015 | Overnight
Degrader OUT
DAQ ran OK - data file R22
|
16x |
547
|
Thu Mar 30 16:12:21 2017 |
DK, OH, CG | Friday, March 31 run status | 00:11 BigRIPS has started a new run at 00:10:42
run 0165.
AIDA subrun R16_357 was about halfway |
14x |
370
|
Wed Oct 5 07:29:29 2016 |
CG & TD | Wednesday 5 October (inc AIDA+BRIKEN photos) | 14.30 Adjusted and checked insertion of AIDA
snout into BRIKEN (CH2)n moderator.
up-down AIDA snout appears centred |
11x |
224
|
Fri May 13 06:18:53 2016 |
AE, VP, BM | Friday May 13th | 11 am: Changed configuration of power source
for AIDA PSU (see paper logbook). Now both
cables with power for
|
9x |