|
ID |
Date |
Author |
Subject |
Text |
 |
|
134
|
Tue Nov 8 02:49:19 2016 |
PV, Liu | Specification of the dE silicon detector | The specification and picture of the dE silicon
detector is shown in the attached photos.
The detector has an effective area of 134 |
  |
|
133
|
Mon Nov 7 14:17:23 2016 |
BRIKEN collaboration | Picture of shift schedule | |
|
|
131
|
Mon Nov 7 13:44:26 2016 |
Alvaro, Ale, Jorge, Jose | Running Gasific and run protocol | Preliminary |
|
|
130
|
Mon Nov 7 13:15:07 2016 |
Alvaro, Ale, Jorge, Jose | Background | Background measurement overnight.
Start: 23:27 (07/11/2016)
|
|
|
129
|
Mon Nov 7 13:11:42 2016 |
Alvaro, Ale, Jose, Jorge | New directory and Config file | For second part of Takechi's run:
Directory: /data/1611Commissioning/161107Parasitic
|
|
|
128
|
Mon Nov 7 09:05:09 2016 |
Iris | Draft for Run sheet | Attached is the draft for the paper run sheet
(version 2). If something is missing, please
let me know. |
 |
|
127
|
Mon Nov 7 09:04:10 2016 |
Phong,Liu,Ale,Jose | New AIDA plastic calibration | To have a range of about 200 MeV
Ortec671 Gain from x20 to x5 (fine gain : |
|
|
126
|
Mon Nov 7 06:55:01 2016 |
NTB, SG | HPGe Fill line to D4 replaced | HPGe fill line to D4 replaced only small
leak (overflow) once Ge is full.
Solenoid was also wrapped to no |
|
|
125
|
Mon Nov 7 05:36:20 2016 |
Ale | new calibration for F11 | new calibration for F11
Using a value of 70 MeV energy loss and the |
|
|
124
|
Mon Nov 7 04:49:57 2016 |
Tain, Ale | AIDA plastic (veto) and Si de calibration | AIDA plastic (veto) and Si de calibration
For the calibration the Compton edge of the |
|
|
123
|
Mon Nov 7 04:37:33 2016 |
Phong,Liu,... | Si de and AIDA plastic calibration | 60Co source placed close to the detectors:
ROOT files:
|
|
|
122
|
Mon Nov 7 02:39:55 2016 |
Ale | Photo of the white board with the details on the cards and preamps at B1F | Photo of the white board with the details
on the cards and preamps at B1F |
|
|
121
|
Sun Nov 6 23:35:42 2016 |
Tain et al. | Overnight measurement: Ca isotopes | First 50,49,48Ca beam and then 47,46,45Ca
beam
C-6mm IN and OUT
|
  |
|
120
|
Sun Nov 6 07:16:59 2016 |
Tain et al. | 58Ni on F7 CH2 F11 empty/C6mm | CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
|
 |
|
119
|
Sun Nov 6 06:39:23 2016 |
Tain et al. | 58Ni on F11 C-6mm | 58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to |
|
|
118
|
Sun Nov 6 06:27:49 2016 |
Tain et al. | 58Ni on F11 C-6mm in | New calibration in V_PL_T and V_PL_R (Energyx1/2)
Start: 15:15
|
|
|
117
|
Sun Nov 6 03:12:55 2016 |
Alvaro,Jorge | Overnight measurement | Measurement during beam production
and measurement with F7 CH2 out,
F11 C-tar in/out, F7 CH2 in C-target out/in
|
|
|
116
|
Sat Nov 5 17:07:27 2016 |
Tain, Alvaro, Jorge | 62Ni in F7 | 62Ni beam in F7 ON CH2 target
Strat with C target ladder in F11 in empty |
    |
|
115
|
Sat Nov 5 16:27:13 2016 |
Tain,Ale,Jorge,Alvaro | 62Ni beam in F11 empty target | Empty position of the target ladder at F11
(hole is smaller than beam size)
|
|
|
114
|
Sat Nov 5 15:07:11 2016 |
Tain, Ale | 62Ni beam on F11 C-6mm | 62Ni on 6 mm C target between MUSICs
The background before was 0.36 neutrons/s
|
    |