AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 14 of 21  ELOG logo
Entry  Tue Nov 22 08:28:36 2016, A. Tarifeno-Saldivia et al, New directory and Config File 
A new directory in the IFICdaq computer has been created for the parasitic measurements during the Fallon Beam Time.

The path of the folder is:
Entry  Sun Nov 20 13:02:06 2016, Jorge, Alavaro, Jose, DACQ Gasific70Manual.pdf
Gasific-7.0 Short Manual (Preliminary)
Entry  Sun Nov 20 12:28:27 2016, Jorge, Alvaro, Jose, DACQ GasificShort.pdf
Updated run protocol
Entry  Fri Nov 11 08:07:18 2016, BCR SG NTB, BRIKEN Hit Visualization HybridBRIKENPhysicalHistogram.cppHybridBRIKENPhysicalHistogram.hppHybridBRIKEN_Tube_Info_1.txt
These are the files used to create and visualize the hit patterns of the BRIKEN detector.

There are three files needed plus one input data file. The three files are "HybridBRIKENPhysicalHistogram.hpp", "HybridBRIKENPhysicalHistogram.cpp",
and "HybryidBRIKEN_Tube_Info_1.txt". These files are attached to this eLog entry.
Entry  Thu Nov 10 05:05:54 2016, KM, How to convert ridf-file to root-file 
1. Login to briken@ribfana03.riken.jp

2. Check if the ridf-file you want to convert is in the directory; /home/briken16/rawdata/bigrips/

3. Login to anaroot; type "anarootlogin"
Entry  Wed Nov 9 02:02:22 2016, Iris, Boron rubber from India BPE2_Clr.jpgquotation_220213.pdfflex_boron_2871.pdf
The boron rubber from India is BR-2871, price US-$ 2700 for 2pc 1m x 2m x 3.3mm.
52% B content, density 1.61 g/cm3
Entry  Tue Nov 8 06:13:11 2016, Tain et al, New plastic detector in F11 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg
There is a new plastic scintillator
after the MUSIC chambers
    Reply  Tue Nov 8 06:39:25 2016, Tain. Iris, Drawing of present setup Full_BRIKEN_Setup-includingTakechi.pdf


Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup.
Entry  Wed Nov 9 01:02:53 2016, Iris, Elog 
From Nov. 9th on we use the Takechi ELOG for the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ 
Entry  Tue Nov 8 17:00:27 2016, NTB, CG, AT, Si Delta E 
At least during the timeframe in between ~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root) we see that the silicon dE have a very low counting
rate. ~1Hz when the first AIDA detector sees ~600 Hz and a cumulative ~2kHz. The energy range in the dE stops at ~10MeV.

Edit: It appears the Si dE were removed. Some signals are still in the spectra.
Entry  Tue Nov 8 15:10:24 2016, Many, 717273Ni Run 
F7 OUT F11 C-6mm

Start: 00:09
Entry  Tue Nov 8 14:28:54 2016, Many, 717273Ni run 
F7 CH2 F11 C-6mm
Total degrader thickness 6mm
Entry  Tue Nov 8 13:49:58 2016, Many, 71,72,73Ni 
F7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN infront of AIDA
Entry  Tue Nov 8 12:51:08 2016, Many, 717273Ni  
After removing the lead wall.

Start: 21:45
Entry  Tue Nov 8 12:30:33 2016, Tain, Ale (who are not on shift), 71,72,73Ni run 
71,72,73Ni  run

We started at approximately 21:00, only online, not writing on tape. 
Entry  Tue Nov 8 11:51:28 2016, Ale, spikes on some spectra 
Some spectra show spikes or do not look normal. This should be checked.

Look at BRIKEN, Ring4, Ring5, Ring6, Ring7, D4, G7, Clovers, 
Entry  Tue Nov 8 08:49:51 2016, Tain et al, Move ELOG 
We will start to use the internal RIKEN ELOG
It is not clear that we can keep the present ELOG also updated
Entry  Tue Nov 8 08:31:52 2016, Tain et al, 424344Ca run 
Sequence of settings:
1) No target at F7 and Empty target at F11 (up to t=1E6ms)
2) No target at F7 and C-6mm target at F11 (up to t=5.1E6ms)
Entry  Tue Nov 8 02:49:19 2016, PV, Liu, Specification of the dE silicon detector spec_de_1.jpgspec_de_2.jpgIMG_1340.JPG
The specification and picture of the dE silicon detector is shown in the attached photos.
The detector  has an effective area of 134 x 123 mm and  320 micrometer  thick
There are 26 vertical strips. They are combined into 2 readout channels (top and bottom which respect to the orientation of the detector in BRIKEN)
Entry  Mon Nov 7 14:17:23 2016, BRIKEN collaboration, Picture of shift schedule IMG_20161107_183105.jpg
 
Entry  Mon Nov 7 13:44:26 2016, Alvaro, Ale, Jorge, Jose, Running Gasific and run protocol GasificShort.pdf
Preliminary
ELOG V3.1.4-unknown