AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 14 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Nov 22 08:28:36 2016, A. Tarifeno-Saldivia et al, New directory and Config File 
A new directory in the IFICdaq computer has been created for the parasitic measurements during the Fallon Beam Time.

The path of the folder is:
/home/dacq/Desktop/Data/2211Fallon/

All the work during this campaign will be stored in folders inside here.

For the period before the parasitic experiments, the test and check of the detector will be stored in 
/home/dacq/Desktop/Data/2211Fallon/2211FallonPreparation

The Config file for the test is:

161107Conf_BrikenFull.xlsx
Entry  Sun Nov 20 13:02:06 2016, Jorge, Alavaro, Jose, DACQ Gasific70Manual.pdf
Gasific-7.0 Short Manual (Preliminary)
Entry  Sun Nov 20 12:28:27 2016, Jorge, Alvaro, Jose, DACQ GasificShort.pdf
Updated run protocol
Entry  Fri Nov 11 08:07:18 2016, BCR SG NTB, BRIKEN Hit Visualization HybridBRIKENPhysicalHistogram.cppHybridBRIKENPhysicalHistogram.hppHybridBRIKEN_Tube_Info_1.txt

These are the files used to create and visualize the hit patterns of the BRIKEN detector.

There are three files needed plus one input data file. The three files are "HybridBRIKENPhysicalHistogram.hpp", "HybridBRIKENPhysicalHistogram.cpp", and "HybryidBRIKEN_Tube_Info_1.txt". These files are attached to this eLog entry.

In order to run this type in a terminal

root -l HybidBRIKENPhysicalHistogram.cpp+

The plus is important, it tells ROOT to compile this with the gcc compiler and then run that compiled version of the code. It runs slow, if at all, in the ROOT C++ interpreter CINT.

The code has been tested with ROOT v5.32 and v5.34, not version 6.

At the bottom of the HybidBRIKENPhysicalHistogram.cpp file is the "main program". In it you can set the input data file, which should be a BRIKEN online root output file, and the 3He energy cuts. It is easiest if all the files are in the same folder. If there are any questions please feel free to email B. Charles (Charlie) Rasco.

Entry  Thu Nov 10 05:05:54 2016, KM, How to convert ridf-file to root-file 

1. Login to briken@ribfana03.riken.jp

2. Check if the ridf-file you want to convert is in the directory; /home/briken16/rawdata/bigrips/

3. Login to anaroot; type "anarootlogin"

4. Make your account as your name, and create your directory.

5. login to root; "root -l"

6.  root[ ] .L MakeFullBigRIPSTree_BRIKEN.C+

7.  root[ ]  MakeFullBigRIPSTree_BRIKEN("    full name of ridf-file    ",  Brho34 ,  Brho56 ,"  full name of output file  ")

You can check Brho34 and Brho56 in  --->  http://bripscnt01.rarfadv.riken.jp/runsum/index.php

 Find the link to the summary page in the "file" column. 

 For example: MakeFullBigRIPSTree_BRIKEN("radiioff0371.ridf",  7.176,   6.905, "test.root")

 

 

Entry  Wed Nov 9 02:02:22 2016, Iris, Boron rubber from India BPE2_Clr.jpgquotation_220213.pdfflex_boron_2871.pdf
The boron rubber from India is BR-2871, price US-$ 2700 for 2pc 1m x 2m x 3.3mm.
52% B content, density 1.61 g/cm3
Entry  Tue Nov 8 06:13:11 2016, Tain et al, New plastic detector in F11 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg
There is a new plastic scintillator
after the MUSIC chambers

The detector has a central hole of 108mm (with) x 38mm (height)
and is 3mm thick and is placed behind the existing plastic 
scintillator which is 5mm thick.
(see photo)
    Reply  Tue Nov 8 06:39:25 2016, Tain. Iris, Drawing of present setup Full_BRIKEN_Setup-includingTakechi.pdf

Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup.
The lead wall will be removed for measurements (of course...).
Not to scale! Some sizes and distances included. Pictures see Jose's entry ID 110.

Note the shape of the active area of the DeltaE Silicon detector, see previous entry.
Entry  Wed Nov 9 01:02:53 2016, Iris, Elog 
From Nov. 9th on we use the Takechi ELOG for the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ 
Entry  Tue Nov 8 17:00:27 2016, NTB, CG, AT, Si Delta E 

At least during the timeframe in between ~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root) we see that the silicon dE have a very low counting rate. ~1Hz when the first AIDA detector sees ~600 Hz and a cumulative ~2kHz. The energy range in the dE stops at ~10MeV.

Edit: It appears the Si dE were removed. Some signals are still in the spectra.

Entry  Tue Nov 8 15:10:24 2016, Many, 717273Ni Run 
F7 OUT F11 C-6mm

Start: 00:09
Run: 006
DLT: 161108_2251_717273Ni_006.dlt

Rates:
F11R: 1200 cps
BRIKEN: 270 cps (22.5%)

They  were tuning during this run.

Stop: 0042

Root file: 161109_0042_717273Ni.root
Entry  Tue Nov 8 14:28:54 2016, Many, 717273Ni run 
F7 CH2 F11 C-6mm
Total degrader thickness 6mm

Start:
RUN: 005
File: 161108_2251_717273Ni_005.dlt
Stop: 23:59
Run: 005

Rates:
F11R: 2600 cps
BRIKEN: 740 cps

Root file: 161109_0005_717273Ni.root


Counts: 
F11R: 5.36294e+06
BRIKEN: 1.42823e+06
Corr_BR_F11R: 1.41452e+06
Entry  Tue Nov 8 13:49:58 2016, Many, 71,72,73Ni 
F7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN infront of AIDA
Move AIDA to the central position. We put a 5mm Al plate in front
of the degrader.

Degrader 5.4mm + 5mm

Start: 22:51
DLT: 161108_2251_717273Ni_03.dlt

We remove some degrader:2.2mm off
Then we start a new run: 004

Stop:23:26
To put the C-6mm target in F11

ROOT file: 161108_2323_717273Ni.root
Entry  Tue Nov 8 12:51:08 2016, Many, 717273Ni  
After removing the lead wall.

Start: 21:45
DLT: 161108_2145_717273Ni_001.dlt

During the first part we were changing the degrader.
Now they remove the C-6mm target.

So we increase the adjustable degrader to 5.4mm 
keeping the 8mm thick plate for implantation.

We stop and start a new DLT file at 22:02
DLT: 161108_2145_717273Ni_002.dlt
Stop: 22:48


NO ROOT FILE!
Entry  Tue Nov 8 12:30:33 2016, Tain, Ale (who are not on shift), 71,72,73Ni run 
71,72,73Ni  run

We started at approximately 21:00, only online, not writing on tape. 

The lead is still in the way. We removed the degrader (fully) and the effect is a 5 % reduction of the neutron flux 
(determined using the rate of the rateF11/rateBRIKEN  before and after the change).
Entry  Tue Nov 8 11:51:28 2016, Ale, spikes on some spectra 
Some spectra show spikes or do not look normal. This should be checked.

Look at BRIKEN, Ring4, Ring5, Ring6, Ring7, D4, G7, Clovers, 
Rate1, Rate2, Rate3, etc.

Reset time stamp: 21.00, 8th-nov.

Probably there was a problem with the clock from AIDA related to the LN2 filling.
So to recover, we need to stop acq (only stop acquisition in DACQ control), 
send to hard (send parameters again) and once all the parameters were sent, 
Send Sync pulse.
Entry  Tue Nov 8 08:49:51 2016, Tain et al, Move ELOG 
We will start to use the internal RIKEN ELOG
It is not clear that we can keep the present ELOG also updated
Entry  Tue Nov 8 08:31:52 2016, Tain et al, 424344Ca run 
Sequence of settings:
1) No target at F7 and Empty target at F11 (up to t=1E6ms)
2) No target at F7 and C-6mm target at F11 (up to t=5.1E6ms)
3) CH2 (10mm) target at F7 and C-6mm target at F11 (from t=5.3E6ms up to 6.8E6)
4) CH2 (10mm) target at F7 and Empty target at F11 (from t=6.8ms up to crash 7.1ms)

DAQ chash because start of Clover LN2 filling!
Counts accumulated in the the  same time channel at the end.

Start: 16:29 Run: 000
Stop: 18:28 Run: 000

DLT filename: 161108_1629_424344Ca_000.dlt
ROOT filename: 161108_1828_424344Ca.root
Entry  Tue Nov 8 02:49:19 2016, PV, Liu, Specification of the dE silicon detector spec_de_1.jpgspec_de_2.jpgIMG_1340.JPG
The specification and picture of the dE silicon detector is shown in the attached photos.
The detector  has an effective area of 134 x 123 mm and  320 micrometer  thick
There are 26 vertical strips. They are combined into 2 readout channels (top and bottom which respect to the orientation of the detector in BRIKEN)
Entry  Mon Nov 7 14:17:23 2016, BRIKEN collaboration, Picture of shift schedule IMG_20161107_183105.jpg
 
Entry  Mon Nov 7 13:44:26 2016, Alvaro, Ale, Jorge, Jose, Running Gasific and run protocol GasificShort.pdf
Preliminary
ELOG V3.1.4-unknown