Entry  Mon Nov 7 09:04:10 2016, Phong,Liu,Ale,Jose, New AIDA plastic calibration 161107_1800_AIDAplasticCalib.pdf
To have a range of about 200 MeV

Ortec671 Gain from x20 to x5 (fine gain : x0.5)
HV from 1500V to 1300V
60Co-> 10 mV

Root file: 161107_1800_AIDAplasticCalib.root

calibration a1= 0.001 MeV/units
Entry  Mon Nov 7 04:37:33 2016, Phong,Liu,..., Si de and AIDA plastic calibration 
60Co source placed close to the detectors:

ROOT files: 
161107_1221_SiDetCalibration.root
161107_1237_AIDAPlasticCalibration.root
Entry  Mon Oct 17 05:21:46 2016, Phong, Liu J J, dE detector position and output signal from preamplifier 137CsTest_ac.JPGdE_position.JPGdc.JPG
dE detector is mounted onto the back side of the shielding (attached photo: dE_position.JPG)

The detector consists of 26 strips. In this setup, the detector is devided into 2 parts corresponding to 2 readout channels. Each part consists of 13 strips joint together.

Output signal from a high gain channel of preamplifier with 137Cs source is shown in attachment 137CsTest_ac.JPG.;

The white noise is about 2 mV for high gain mode.

We will switch to low gain mode during the experiment.

* note:there is a 200 mV offset due to the characteristic of the preamplifier (see attachment dc.JPG)
Entry  Sun Nov 27 10:47:20 2016, PV,TD,GK, 40Mg. Run 32 
=======    START    =======
Date 2016/11/27
Start time	: 16:20
BRIKEN run	: 032
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1620
AIDA run	: R21_0
AIDA start	: 16:19
BigRIPS run	: 40Mg-1032
BigRIPS start	: 16:20
 
---------------------------
Shifters:  PV, TD, GK
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27
~16:10: Beam Off for a while, we entered F11 area and attached 1mm Al degrader to the beam hole in BRIKEN PE
shielding, then start the new run
~17:00: AIDA merger stopped

------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 032
BRIKEN stop	: 17:15
ROOT online	: 
AIDA run	: R21_8
AIDA stop	: 17:04
BigRIPS RUN	: 1032
Entry  Tue Nov 29 00:30:42 2016, PV,SN, Sillicon dE bias voltage increased 

We increase the bias voltage of the dE detector from 20 V to 100 V

Leakage current:

Before: ~0.590 uA

After 0.695 uA

Entry  Sat Apr 1 11:13:42 2017, PV,OH,JLT, 37Na run 62 
Date: 1/04/2017 
Start:19:09
BRIKEN run: 62 
AIDA Run: R20_272 
BigRIPS run: 218 

DLT:170401_1913_Na37_062.dlt

BRIKEN Rate: 1.6 cps 
F11 Rate: 8. cps 

Date: 1/04/2017 
Stop: 20:13
BRIKEN run: 62 
AIDA Run: R20_287
BigRIPS run: 218

Root file: 170401_1909_2013_B062_Na37.root
OBSERVATIONS: Degrader thickness was reduced by 1mm
Entry  Mon Mar 27 11:53:15 2017, PV,Liu, Turn on dE detector 1_top_60co.png2_top_noiselvl.png3_bottom_60co.png4_bottom_noiselvl.png

We applied a bias voltage of 100 V to the dE detector

Current read = 0.660 uA

compare with https://elog.ph.ed.ac.uk/BRIKEN/190.  it is slighly lower.

Attachment 1-2:  signal and noise level from Co60 source for the dE top

Attachment 3-4: signal and noise level from Co60 source for the dE bottom

 

Entry  Sat Apr 1 12:15:21 2017, PV, OH, JLT, ID, JA, 37Na run 63 
Date: 1/04/2017 
Start:20:15
BRIKEN run: 63 
AIDA Run: R20_287 
BigRIPS run: 219 

DLT:170401_2015_Na37_063.dlt

BRIKEN Rate: 1.6 cps 
F11 Rate: 8. cps 

Date: 1/04/2017 
Stop: 21:13
BRIKEN run: 63 
AIDA Run: R20_302
BigRIPS run: 219

Root file: 170401_1909_2113_B063_Na37.root
OBSERVATIONS: 
Entry  Tue Mar 28 06:56:15 2017, PV, Liu, JA, JLT, F11 Plastic 170328_1507_F11_PL_RandL.pdf170328_1838_F11PLCal.pdfNewF11Plastic.jpg
Calibration of new F11 plastic
(see photo)

The new plastic is 1mm thick instead of 0.2mm used last year.
Dimensions:120mm x 100mm x 1mm
HV applied: -1800V
Anode signal connected to Ortec 474 TFA
Gain: 20 x minimum; Int: 200ns; Diff: 100ns; Invert
60 Co source

THIS WAS WRONG! POLARITY OF SIGNALS WAS REVERSED.
***************************************************************
*File: 170328_1507_F11PL_60Co.root
*See attached wrong picture 170328_1507_F11_PL_RandL.pdf (R:Red, L:Black)
*
*Calibration (Gain=20):
*V1C7C3_EFIR (R): Peak(<E>=1.25MeV):2077.1 -> a1=0.0006028 MeV/u
*V1C7C4_EFIR (R): Peak(<E>=1.25MeV):1924.0 -> a1=0.0006507 MeV/u
***************************************************************

CORRECT SPECTRUM:
File: 170328_1838_F11PLCal.root
Picture: 170328_1838_F11PLCal.pdf

*************************************************************

Stopping power calculation (SRIM):
50 MeV/A 40Mg: S=102*1.184=120.8 MeV/mm 
100 MeV/A 40Mg: S=102*0.7129= 72.7 MeV/mm 
(Later: according LISE simulations energy loss of 40Mg  is 88MeV)

What is the energy loss of the "light" particles?
Entry  Wed Mar 29 11:02:40 2017, PV, Liu, JA, JLT, F11 plastic 
New calibration of F11 plastic

We decided to have both a low gain and a high gain 
for F11 plastic dividing the signal from the TFA 
with a "T" and using in one branch a 20db attenuator (reduction by 10)
and sending to two different DACQ channels.
The gain of the TFA was also reduced to x2

V1A7C3: F11_PL_R (Low gain: ~60MeV)
V1A7C4: F11_PL_L
V1A7C5: F11_PL_R_HG (High gain: ~600MeV)
V1A7C5: F11_PL_L_HG
Entry  Tue Nov 8 02:49:19 2016, PV, Liu, Specification of the dE silicon detector spec_de_1.jpgspec_de_2.jpgIMG_1340.JPG
The specification and picture of the dE silicon detector is shown in the attached photos.
The detector  has an effective area of 134 x 123 mm and  320 micrometer  thick
There are 26 vertical strips. They are combined into 2 readout channels (top and bottom which respect to the orientation of the detector in BRIKEN)
Entry  Tue Nov 22 10:22:07 2016, PV, Liu, No current observed when turning on the HV for the D4 Clover 
19:00
We've turned on the High Voltage for the D4 Clover up to ~ 1.5 kV. 
There is no current (0.0 uA) observed in all the channels (crystals) of this clover while the High Voltage is
turning up.
We have turned down the HV after that.
We've checked that the NIM crate power supply for the preamp is On and the HV and peamplifier connections for
this Clover are Ok.
Entry  Sun Nov 27 11:15:42 2016, PV, GK, AE, TD , 40Mg. Run 34 
=======    START    =======
Date 2016/11/27
Start time	: 17:29
BRIKEN run	: 034
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1729
AIDA run	: R22_2
AIDA start	: 17:29
BigRIPS run	: 40Mg-1033
BigRIPS start	: 17:24
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27


------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 034
BRIKEN stop	: 18:28
ROOT online	: 
AIDA run	: R22_14
AIDA stop	: 
BigRIPS RUN	: 1033
Entry  Sun Nov 27 11:07:02 2016, PV, GK, AE, TD, 40Mg. Run 33 - junk 
=======    START    =======
Date 2016/11/27
Start time	: 17:17
BRIKEN run	: 033
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1717
AIDA run	: R22_0
AIDA start	: 17:17
BigRIPS run	: 40Mg-1033 (and part of 40Mg-1032)
BigRIPS start	: 17:24
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27


------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 032
BRIKEN stop	: 17:15
ROOT online	: 
AIDA run	: R22_1
AIDA stop	: 
BigRIPS RUN	: 1033
Entry  Sat Apr 1 14:21:31 2017, PV OH Liu JLT, 37Na run 65 
Date: 1/04/2017 
Start:22:12
BRIKEN run: 65 
AIDA Run: R20_317 
BigRIPS run: 221

DLT:170401_2220_Na37_065.dlt

BRIKEN Rate: 1.6 cps 
F11 Rate: 8. cps 

Date: 1/04/2017 
Stop: 23:13
BRIKEN run: 65 
AIDA Run: R20_330
BigRIPS run: 221

Root file:170401_2212_2312_B065_Na37.root 
OBSERVATIONS: online cleared
Entry  Fri Mar 31 10:35:22 2017, PV CG JA, Run 40 
Date: 31/03/2017
Start: 
BRIKEN run: 40
AIDA Run: R16_630
BigRIPS run: 184
DLT: 170331_1837_Mg40_040.dlt

BRIKEN Rate: 40/ 10= 4  cps
F11 Rate:  12 cps

Date: 31/03/2017
Stop: 19:43
BRIKEN run: 040
AIDA Run: R16_647
BigRIPS run: 185

Root file: 170331_1222_1943_B040_Mg40.root

OBSERVATIONS: BigRIPS team changed to run185 after about 11min (at 18:38)
Entry  Thu Dec 8 04:17:49 2016, PV, Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer Screenshot_from_2016-12-08_13-30-16.png

All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:

https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing

To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro)

- Extract the downloaded file:

tar -xvzf elogBRIKEN2016.tar.gz

- Go to the extracted directory and execute make

cd elogBRIKEN2016

make

- Run elogd service:

./elogd start

then it will display:

elogd 3.1.2 built Dec  8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ... 
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
 

- Go to your web browser, enter 

http://localhost:3333

-  It will ask you to register a new elog account, fill in your prefered information

Login name:   (name may not contain blanks)
Full name:  
Email:  
Password:  
Retype password:

and press Save button

- Next, it will ask you to choose which logbook you want to subcribe, in this case we should choose: RIBF123, then press Save buttom at the top left connner (see attached photo)

- The experimental log should be displayed then. Select RIBF123.

 


 

Ubuntu 16

Please, update/install the following packages:

sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev

 

Entry  Fri Dec 9 05:25:26 2016, PV, Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment Schematic_PbShielding_FallonRun.pdfIMG_1414.JPG

This Pb shielding structure is right behind the variable degrader

Entry  Tue Jun 13 05:18:07 2017, PV, How to install ELOG for BRIKEN campaign 2017a  
Get ELOG software including entries for BRIKEN campaign 2017a from mars computer:

briken@mars:/data01/2017data/briken/ur17a/elogBRIKEN2017a.tar.gz

To run and view the Elog website in your local computer 


For Ubuntu 16

Please, update/install the following packages:

sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev


- Extract the file:

tar -xvzf elogBRIKEN2017a.tar.gz

- Go to the extracted directory and execute make

cd elogBRIKEN2017a

make

- Run elogd service from that directory:

./elogd start

then it will display:

elogd 3.1.2 built Dec  8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ... 
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
 

- Go to your web browser, enter 

http://localhost:3333

-  It will ask you to register a new elog account, fill in your preferred information

Login name:	 	(name without space)
Full name:	 
Email:	 
Password:	 
Retype password:
and press Save button

- Next, it will ask you to choose which logbook you want to subscribe. Choose "BRIKEN2017-June" if you like, then press Save button at the top left corner 
- The experimental log should be displayed then. Select BRIKEN > BRIKEN2017-June.
Entry  Mon Jun 12 22:28:02 2017, Oscar, The SUSHIRO app guide SUSHIRO_For_Dummies_V001.pdf
It's here...it's rough...but it hopefully gets the job done