ID |
Date |
Author |
Subject |
127
|
Mon Nov 7 09:04:10 2016 |
Phong,Liu,Ale,Jose | New AIDA plastic calibration |
To have a range of about 200 MeV
Ortec671 Gain from x20 to x5 (fine gain : x0.5)
HV from 1500V to 1300V
60Co-> 10 mV
Root file: 161107_1800_AIDAplasticCalib.root
calibration a1= 0.001 MeV/units |
Attachment 1: 161107_1800_AIDAplasticCalib.pdf
|
|
123
|
Mon Nov 7 04:37:33 2016 |
Phong,Liu,... | Si de and AIDA plastic calibration |
60Co source placed close to the detectors:
ROOT files:
161107_1221_SiDetCalibration.root
161107_1237_AIDAPlasticCalibration.root |
92
|
Mon Oct 17 05:21:46 2016 |
Phong, Liu J J | dE detector position and output signal from preamplifier |
dE detector is mounted onto the back side of the shielding (attached photo: dE_position.JPG)
The detector consists of 26 strips. In this setup, the detector is devided into 2 parts corresponding to 2 readout channels. Each part consists of 13 strips joint together.
Output signal from a high gain channel of preamplifier with 137Cs source is shown in attachment 137CsTest_ac.JPG.;
The white noise is about 2 mV for high gain mode.
We will switch to low gain mode during the experiment.
* note:there is a 200 mV offset due to the characteristic of the preamplifier (see attachment dc.JPG) |
Attachment 1: 137CsTest_ac.JPG
|
|
Attachment 2: dE_position.JPG
|
|
Attachment 3: dc.JPG
|
|
181
|
Sun Nov 27 10:47:20 2016 |
PV,TD,GK | 40Mg. Run 32 |
======= START =======
Date 2016/11/27
Start time : 16:20
BRIKEN run : 032
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1620
AIDA run : R21_0
AIDA start : 16:19
BigRIPS run : 40Mg-1032
BigRIPS start : 16:20
---------------------------
Shifters: PV, TD, GK
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
~16:10: Beam Off for a while, we entered F11 area and attached 1mm Al degrader to the beam hole in BRIKEN PE
shielding, then start the new run
~17:00: AIDA merger stopped
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 032
BRIKEN stop : 17:15
ROOT online :
AIDA run : R21_8
AIDA stop : 17:04
BigRIPS RUN : 1032 |
190
|
Tue Nov 29 00:30:42 2016 |
PV,SN | Sillicon dE bias voltage increased |
We increase the bias voltage of the dE detector from 20 V to 100 V
Leakage current:
Before: ~0.590 uA
After 0.695 uA |
277
|
Sat Apr 1 11:13:42 2017 |
PV,OH,JLT | 37Na run 62 |
Date: 1/04/2017
Start:19:09
BRIKEN run: 62
AIDA Run: R20_272
BigRIPS run: 218
DLT:170401_1913_Na37_062.dlt
BRIKEN Rate: 1.6 cps
F11 Rate: 8. cps
Date: 1/04/2017
Stop: 20:13
BRIKEN run: 62
AIDA Run: R20_287
BigRIPS run: 218
Root file: 170401_1909_2013_B062_Na37.root
OBSERVATIONS: Degrader thickness was reduced by 1mm |
203
|
Mon Mar 27 11:53:15 2017 |
PV,Liu | Turn on dE detector |
We applied a bias voltage of 100 V to the dE detector
Current read = 0.660 uA
compare with https://elog.ph.ed.ac.uk/BRIKEN/190. it is slighly lower.
Attachment 1-2: signal and noise level from Co60 source for the dE top
Attachment 3-4: signal and noise level from Co60 source for the dE bottom
|
Attachment 1: 1_top_60co.png
|
|
Attachment 2: 2_top_noiselvl.png
|
|
Attachment 3: 3_bottom_60co.png
|
|
Attachment 4: 4_bottom_noiselvl.png
|
|
278
|
Sat Apr 1 12:15:21 2017 |
PV, OH, JLT, ID, JA | 37Na run 63 |
Date: 1/04/2017
Start:20:15
BRIKEN run: 63
AIDA Run: R20_287
BigRIPS run: 219
DLT:170401_2015_Na37_063.dlt
BRIKEN Rate: 1.6 cps
F11 Rate: 8. cps
Date: 1/04/2017
Stop: 21:13
BRIKEN run: 63
AIDA Run: R20_302
BigRIPS run: 219
Root file: 170401_1909_2113_B063_Na37.root
OBSERVATIONS: |
204
|
Tue Mar 28 06:56:15 2017 |
PV, Liu, JA, JLT | F11 Plastic |
Calibration of new F11 plastic
(see photo)
The new plastic is 1mm thick instead of 0.2mm used last year.
Dimensions:120mm x 100mm x 1mm
HV applied: -1800V
Anode signal connected to Ortec 474 TFA
Gain: 20 x minimum; Int: 200ns; Diff: 100ns; Invert
60 Co source
THIS WAS WRONG! POLARITY OF SIGNALS WAS REVERSED.
***************************************************************
*File: 170328_1507_F11PL_60Co.root
*See attached wrong picture 170328_1507_F11_PL_RandL.pdf (R:Red, L:Black)
*
*Calibration (Gain=20):
*V1C7C3_EFIR (R): Peak(<E>=1.25MeV):2077.1 -> a1=0.0006028 MeV/u
*V1C7C4_EFIR (R): Peak(<E>=1.25MeV):1924.0 -> a1=0.0006507 MeV/u
***************************************************************
CORRECT SPECTRUM:
File: 170328_1838_F11PLCal.root
Picture: 170328_1838_F11PLCal.pdf
*************************************************************
Stopping power calculation (SRIM):
50 MeV/A 40Mg: S=102*1.184=120.8 MeV/mm
100 MeV/A 40Mg: S=102*0.7129= 72.7 MeV/mm
(Later: according LISE simulations energy loss of 40Mg is 88MeV)
What is the energy loss of the "light" particles? |
Attachment 1: 170328_1507_F11_PL_RandL.pdf
|
|
Attachment 2: 170328_1838_F11PLCal.pdf
|
|
Attachment 3: NewF11Plastic.jpg
|
|
209
|
Wed Mar 29 11:02:40 2017 |
PV, Liu, JA, JLT | F11 plastic |
New calibration of F11 plastic
We decided to have both a low gain and a high gain
for F11 plastic dividing the signal from the TFA
with a "T" and using in one branch a 20db attenuator (reduction by 10)
and sending to two different DACQ channels.
The gain of the TFA was also reduced to x2
V1A7C3: F11_PL_R (Low gain: ~60MeV)
V1A7C4: F11_PL_L
V1A7C5: F11_PL_R_HG (High gain: ~600MeV)
V1A7C5: F11_PL_L_HG |
134
|
Tue Nov 8 02:49:19 2016 |
PV, Liu | Specification of the dE silicon detector |
The specification and picture of the dE silicon detector is shown in the attached photos.
The detector has an effective area of 134 x 123 mm and 320 micrometer thick
There are 26 vertical strips. They are combined into 2 readout channels (top and bottom which respect to the orientation of the detector in BRIKEN) |
Attachment 1: spec_de_1.jpg
|
|
Attachment 2: spec_de_2.jpg
|
|
Attachment 3: IMG_1340.JPG
|
|
156
|
Tue Nov 22 10:22:07 2016 |
PV, Liu | No current observed when turning on the HV for the D4 Clover |
19:00
We've turned on the High Voltage for the D4 Clover up to ~ 1.5 kV.
There is no current (0.0 uA) observed in all the channels (crystals) of this clover while the High Voltage is
turning up.
We have turned down the HV after that.
We've checked that the NIM crate power supply for the preamp is On and the HV and peamplifier connections for
this Clover are Ok. |
183
|
Sun Nov 27 11:15:42 2016 |
PV, GK, AE, TD | 40Mg. Run 34 |
======= START =======
Date 2016/11/27
Start time : 17:29
BRIKEN run : 034
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1729
AIDA run : R22_2
AIDA start : 17:29
BigRIPS run : 40Mg-1033
BigRIPS start : 17:24
---------------------------
Shifters: PV, AE, GK, TD
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 034
BRIKEN stop : 18:28
ROOT online :
AIDA run : R22_14
AIDA stop :
BigRIPS RUN : 1033 |
182
|
Sun Nov 27 11:07:02 2016 |
PV, GK, AE, TD | 40Mg. Run 33 - junk |
======= START =======
Date 2016/11/27
Start time : 17:17
BRIKEN run : 033
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1717
AIDA run : R22_0
AIDA start : 17:17
BigRIPS run : 40Mg-1033 (and part of 40Mg-1032)
BigRIPS start : 17:24
---------------------------
Shifters: PV, AE, GK, TD
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 032
BRIKEN stop : 17:15
ROOT online :
AIDA run : R22_1
AIDA stop :
BigRIPS RUN : 1033 |
280
|
Sat Apr 1 14:21:31 2017 |
PV OH Liu JLT | 37Na run 65 |
Date: 1/04/2017
Start:22:12
BRIKEN run: 65
AIDA Run: R20_317
BigRIPS run: 221
DLT:170401_2220_Na37_065.dlt
BRIKEN Rate: 1.6 cps
F11 Rate: 8. cps
Date: 1/04/2017
Stop: 23:13
BRIKEN run: 65
AIDA Run: R20_330
BigRIPS run: 221
Root file:170401_2212_2312_B065_Na37.root
OBSERVATIONS: online cleared |
252
|
Fri Mar 31 10:35:22 2017 |
PV CG JA | Run 40 |
Date: 31/03/2017
Start:
BRIKEN run: 40
AIDA Run: R16_630
BigRIPS run: 184
DLT: 170331_1837_Mg40_040.dlt
BRIKEN Rate: 40/ 10= 4 cps
F11 Rate: 12 cps
Date: 31/03/2017
Stop: 19:43
BRIKEN run: 040
AIDA Run: R16_647
BigRIPS run: 185
Root file: 170331_1222_1943_B040_Mg40.root
OBSERVATIONS: BigRIPS team changed to run185 after about 11min (at 18:38) |
191
|
Thu Dec 8 04:17:49 2016 |
PV | Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer |
All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:
https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing
To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro)
- Extract the downloaded file:
tar -xvzf elogBRIKEN2016.tar.gz
- Go to the extracted directory and execute make
cd elogBRIKEN2016
make
- Run elogd service:
./elogd start
then it will display:
elogd 3.1.2 built Dec 8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ...
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
- Go to your web browser, enter
http://localhost:3333
- It will ask you to register a new elog account, fill in your prefered information
Login name: |
|
(name may not contain blanks) |
Full name: |
|
Email: |
|
Password: |
|
Retype password: |
and press Save button
- Next, it will ask you to choose which logbook you want to subcribe, in this case we should choose: RIBF123, then press Save buttom at the top left connner (see attached photo)
- The experimental log should be displayed then. Select RIBF123.
Ubuntu 16
Please, update/install the following packages:
sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev
|
Attachment 1: Screenshot_from_2016-12-08_13-30-16.png
|
|
192
|
Fri Dec 9 05:25:26 2016 |
PV | Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment |
This Pb shielding structure is right behind the variable degrader |
Attachment 1: Schematic_PbShielding_FallonRun.pdf
|
|
Attachment 2: IMG_1414.JPG
|
|
323
|
Tue Jun 13 05:18:07 2017 |
PV | How to install ELOG for BRIKEN campaign 2017a |
Get ELOG software including entries for BRIKEN campaign 2017a from mars computer:
briken@mars:/data01/2017data/briken/ur17a/elogBRIKEN2017a.tar.gz
To run and view the Elog website in your local computer
For Ubuntu 16
Please, update/install the following packages:
sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev
- Extract the file:
tar -xvzf elogBRIKEN2017a.tar.gz
- Go to the extracted directory and execute make
cd elogBRIKEN2017a
make
- Run elogd service from that directory:
./elogd start
then it will display:
elogd 3.1.2 built Dec 8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ...
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
- Go to your web browser, enter
http://localhost:3333
- It will ask you to register a new elog account, fill in your preferred information
Login name: (name without space)
Full name:
Email:
Password:
Retype password:
and press Save button
- Next, it will ask you to choose which logbook you want to subscribe. Choose "BRIKEN2017-June" if you like, then press Save button at the top left corner
- The experimental log should be displayed then. Select BRIKEN > BRIKEN2017-June. |
322
|
Mon Jun 12 22:28:02 2017 |
Oscar | The SUSHIRO app guide |
It's here...it's rough...but it hopefully gets the job done |
Attachment 1: SUSHIRO_For_Dummies_V001.pdf
|
|