AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 4 of 21  ELOG logo
  ID Date Authordown Subject
  127   Mon Nov 7 09:04:10 2016 Phong,Liu,Ale,JoseNew AIDA plastic calibration
To have a range of about 200 MeV

Ortec671 Gain from x20 to x5 (fine gain : x0.5)
HV from 1500V to 1300V
60Co-> 10 mV

Root file: 161107_1800_AIDAplasticCalib.root

calibration a1= 0.001 MeV/units
Attachment 1: 161107_1800_AIDAplasticCalib.pdf
161107_1800_AIDAplasticCalib.pdf
  123   Mon Nov 7 04:37:33 2016 Phong,Liu,...Si de and AIDA plastic calibration
60Co source placed close to the detectors:

ROOT files: 
161107_1221_SiDetCalibration.root
161107_1237_AIDAPlasticCalibration.root
  92   Mon Oct 17 05:21:46 2016 Phong, Liu J JdE detector position and output signal from preamplifier
dE detector is mounted onto the back side of the shielding (attached photo: dE_position.JPG)

The detector consists of 26 strips. In this setup, the detector is devided into 2 parts corresponding to 2 readout channels. Each part consists of 13 strips joint together.

Output signal from a high gain channel of preamplifier with 137Cs source is shown in attachment 137CsTest_ac.JPG.;

The white noise is about 2 mV for high gain mode.

We will switch to low gain mode during the experiment.

* note:there is a 200 mV offset due to the characteristic of the preamplifier (see attachment dc.JPG)
Attachment 1: 137CsTest_ac.JPG
137CsTest_ac.JPG
Attachment 2: dE_position.JPG
dE_position.JPG
Attachment 3: dc.JPG
dc.JPG
  181   Sun Nov 27 10:47:20 2016 PV,TD,GK40Mg. Run 32
=======    START    =======
Date 2016/11/27
Start time	: 16:20
BRIKEN run	: 032
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1620
AIDA run	: R21_0
AIDA start	: 16:19
BigRIPS run	: 40Mg-1032
BigRIPS start	: 16:20
 
---------------------------
Shifters:  PV, TD, GK
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27
~16:10: Beam Off for a while, we entered F11 area and attached 1mm Al degrader to the beam hole in BRIKEN PE
shielding, then start the new run
~17:00: AIDA merger stopped

------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 032
BRIKEN stop	: 17:15
ROOT online	: 
AIDA run	: R21_8
AIDA stop	: 17:04
BigRIPS RUN	: 1032
  190   Tue Nov 29 00:30:42 2016 PV,SNSillicon dE bias voltage increased

We increase the bias voltage of the dE detector from 20 V to 100 V

Leakage current:

Before: ~0.590 uA

After 0.695 uA

  277   Sat Apr 1 11:13:42 2017 PV,OH,JLT37Na run 62
Date: 1/04/2017 
Start:19:09
BRIKEN run: 62 
AIDA Run: R20_272 
BigRIPS run: 218 

DLT:170401_1913_Na37_062.dlt

BRIKEN Rate: 1.6 cps 
F11 Rate: 8. cps 

Date: 1/04/2017 
Stop: 20:13
BRIKEN run: 62 
AIDA Run: R20_287
BigRIPS run: 218

Root file: 170401_1909_2013_B062_Na37.root
OBSERVATIONS: Degrader thickness was reduced by 1mm
  203   Mon Mar 27 11:53:15 2017 PV,LiuTurn on dE detector

We applied a bias voltage of 100 V to the dE detector

Current read = 0.660 uA

compare with https://elog.ph.ed.ac.uk/BRIKEN/190.  it is slighly lower.

Attachment 1-2:  signal and noise level from Co60 source for the dE top

Attachment 3-4: signal and noise level from Co60 source for the dE bottom

 

Attachment 1: 1_top_60co.png
1_top_60co.png
Attachment 2: 2_top_noiselvl.png
2_top_noiselvl.png
Attachment 3: 3_bottom_60co.png
3_bottom_60co.png
Attachment 4: 4_bottom_noiselvl.png
4_bottom_noiselvl.png
  278   Sat Apr 1 12:15:21 2017 PV, OH, JLT, ID, JA37Na run 63
Date: 1/04/2017 
Start:20:15
BRIKEN run: 63 
AIDA Run: R20_287 
BigRIPS run: 219 

DLT:170401_2015_Na37_063.dlt

BRIKEN Rate: 1.6 cps 
F11 Rate: 8. cps 

Date: 1/04/2017 
Stop: 21:13
BRIKEN run: 63 
AIDA Run: R20_302
BigRIPS run: 219

Root file: 170401_1909_2113_B063_Na37.root
OBSERVATIONS: 
  204   Tue Mar 28 06:56:15 2017 PV, Liu, JA, JLTF11 Plastic
Calibration of new F11 plastic
(see photo)

The new plastic is 1mm thick instead of 0.2mm used last year.
Dimensions:120mm x 100mm x 1mm
HV applied: -1800V
Anode signal connected to Ortec 474 TFA
Gain: 20 x minimum; Int: 200ns; Diff: 100ns; Invert
60 Co source

THIS WAS WRONG! POLARITY OF SIGNALS WAS REVERSED.
***************************************************************
*File: 170328_1507_F11PL_60Co.root
*See attached wrong picture 170328_1507_F11_PL_RandL.pdf (R:Red, L:Black)
*
*Calibration (Gain=20):
*V1C7C3_EFIR (R): Peak(<E>=1.25MeV):2077.1 -> a1=0.0006028 MeV/u
*V1C7C4_EFIR (R): Peak(<E>=1.25MeV):1924.0 -> a1=0.0006507 MeV/u
***************************************************************

CORRECT SPECTRUM:
File: 170328_1838_F11PLCal.root
Picture: 170328_1838_F11PLCal.pdf

*************************************************************

Stopping power calculation (SRIM):
50 MeV/A 40Mg: S=102*1.184=120.8 MeV/mm 
100 MeV/A 40Mg: S=102*0.7129= 72.7 MeV/mm 
(Later: according LISE simulations energy loss of 40Mg  is 88MeV)

What is the energy loss of the "light" particles?
Attachment 1: 170328_1507_F11_PL_RandL.pdf
170328_1507_F11_PL_RandL.pdf
Attachment 2: 170328_1838_F11PLCal.pdf
170328_1838_F11PLCal.pdf
Attachment 3: NewF11Plastic.jpg
NewF11Plastic.jpg
  209   Wed Mar 29 11:02:40 2017 PV, Liu, JA, JLTF11 plastic
New calibration of F11 plastic

We decided to have both a low gain and a high gain 
for F11 plastic dividing the signal from the TFA 
with a "T" and using in one branch a 20db attenuator (reduction by 10)
and sending to two different DACQ channels.
The gain of the TFA was also reduced to x2

V1A7C3: F11_PL_R (Low gain: ~60MeV)
V1A7C4: F11_PL_L
V1A7C5: F11_PL_R_HG (High gain: ~600MeV)
V1A7C5: F11_PL_L_HG
  134   Tue Nov 8 02:49:19 2016 PV, LiuSpecification of the dE silicon detector
The specification and picture of the dE silicon detector is shown in the attached photos.
The detector  has an effective area of 134 x 123 mm and  320 micrometer  thick
There are 26 vertical strips. They are combined into 2 readout channels (top and bottom which respect to the orientation of the detector in BRIKEN)
Attachment 1: spec_de_1.jpg
spec_de_1.jpg
Attachment 2: spec_de_2.jpg
spec_de_2.jpg
Attachment 3: IMG_1340.JPG
IMG_1340.JPG
  156   Tue Nov 22 10:22:07 2016 PV, LiuNo current observed when turning on the HV for the D4 Clover
19:00
We've turned on the High Voltage for the D4 Clover up to ~ 1.5 kV. 
There is no current (0.0 uA) observed in all the channels (crystals) of this clover while the High Voltage is
turning up.
We have turned down the HV after that.
We've checked that the NIM crate power supply for the preamp is On and the HV and peamplifier connections for
this Clover are Ok.
  183   Sun Nov 27 11:15:42 2016 PV, GK, AE, TD 40Mg. Run 34
=======    START    =======
Date 2016/11/27
Start time	: 17:29
BRIKEN run	: 034
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1729
AIDA run	: R22_2
AIDA start	: 17:29
BigRIPS run	: 40Mg-1033
BigRIPS start	: 17:24
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27


------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 034
BRIKEN stop	: 18:28
ROOT online	: 
AIDA run	: R22_14
AIDA stop	: 
BigRIPS RUN	: 1033
  182   Sun Nov 27 11:07:02 2016 PV, GK, AE, TD40Mg. Run 33 - junk
=======    START    =======
Date 2016/11/27
Start time	: 17:17
BRIKEN run	: 033
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1717
AIDA run	: R22_0
AIDA start	: 17:17
BigRIPS run	: 40Mg-1033 (and part of 40Mg-1032)
BigRIPS start	: 17:24
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27


------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 032
BRIKEN stop	: 17:15
ROOT online	: 
AIDA run	: R22_1
AIDA stop	: 
BigRIPS RUN	: 1033
  280   Sat Apr 1 14:21:31 2017 PV OH Liu JLT37Na run 65
Date: 1/04/2017 
Start:22:12
BRIKEN run: 65 
AIDA Run: R20_317 
BigRIPS run: 221

DLT:170401_2220_Na37_065.dlt

BRIKEN Rate: 1.6 cps 
F11 Rate: 8. cps 

Date: 1/04/2017 
Stop: 23:13
BRIKEN run: 65 
AIDA Run: R20_330
BigRIPS run: 221

Root file:170401_2212_2312_B065_Na37.root 
OBSERVATIONS: online cleared
  252   Fri Mar 31 10:35:22 2017 PV CG JARun 40
Date: 31/03/2017
Start: 
BRIKEN run: 40
AIDA Run: R16_630
BigRIPS run: 184
DLT: 170331_1837_Mg40_040.dlt

BRIKEN Rate: 40/ 10= 4  cps
F11 Rate:  12 cps

Date: 31/03/2017
Stop: 19:43
BRIKEN run: 040
AIDA Run: R16_647
BigRIPS run: 185

Root file: 170331_1222_1943_B040_Mg40.root

OBSERVATIONS: BigRIPS team changed to run185 after about 11min (at 18:38)
  191   Thu Dec 8 04:17:49 2016 PVInstalling BRIKEN ELOG 2016 in RIBF local network to a personal computer

All the RIBF123 elog website (including Takechi and Fallon experiment) can be downloaded and installed from the following link:

https://drive.google.com/file/d/0B5rBCXKaAWNARVViSTBNSE80RzQ/view?usp=sharing

To run and view the elog website in your local computer (tested with Centos 7, it may work with Ubuntu or any other linux distro)

- Extract the downloaded file:

tar -xvzf elogBRIKEN2016.tar.gz

- Go to the extracted directory and execute make

cd elogBRIKEN2016

make

- Run elogd service:

./elogd start

then it will display:

elogd 3.1.2 built Dec  8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ... 
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
 

- Go to your web browser, enter 

http://localhost:3333

-  It will ask you to register a new elog account, fill in your prefered information

Login name:   (name may not contain blanks)
Full name:  
Email:  
Password:  
Retype password:

and press Save button

- Next, it will ask you to choose which logbook you want to subcribe, in this case we should choose: RIBF123, then press Save buttom at the top left connner (see attached photo)

- The experimental log should be displayed then. Select RIBF123.

 


 

Ubuntu 16

Please, update/install the following packages:

sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev

 

Attachment 1: Screenshot_from_2016-12-08_13-30-16.png
Screenshot_from_2016-12-08_13-30-16.png
  192   Fri Dec 9 05:25:26 2016 PVPhoto and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment

This Pb shielding structure is right behind the variable degrader

Attachment 1: Schematic_PbShielding_FallonRun.pdf
Schematic_PbShielding_FallonRun.pdf
Attachment 2: IMG_1414.JPG
IMG_1414.JPG
  323   Tue Jun 13 05:18:07 2017 PVHow to install ELOG for BRIKEN campaign 2017a
Get ELOG software including entries for BRIKEN campaign 2017a from mars computer:

briken@mars:/data01/2017data/briken/ur17a/elogBRIKEN2017a.tar.gz

To run and view the Elog website in your local computer 


For Ubuntu 16

Please, update/install the following packages:

sudo apt-get install python-pip python-dev libffi-dev libssl-dev libxml2-dev libxslt1-dev libjpeg8-dev zlib1g-dev


- Extract the file:

tar -xvzf elogBRIKEN2017a.tar.gz

- Go to the extracted directory and execute make

cd elogBRIKEN2017a

make

- Run elogd service from that directory:

./elogd start

then it will display:

elogd 3.1.2 built Dec  8 2016, 13:24:26 revision bd75964
CKeditor detected
ImageMagick detected
Indexing logbooks ... 
Create empty password file "logbooks/ribf.passwd"
done
Server listening on port 3333 ...
 

- Go to your web browser, enter 

http://localhost:3333

-  It will ask you to register a new elog account, fill in your preferred information

Login name:	 	(name without space)
Full name:	 
Email:	 
Password:	 
Retype password:
and press Save button

- Next, it will ask you to choose which logbook you want to subscribe. Choose "BRIKEN2017-June" if you like, then press Save button at the top left corner 
- The experimental log should be displayed then. Select BRIKEN > BRIKEN2017-June.
  322   Mon Jun 12 22:28:02 2017 OscarThe SUSHIRO app guide
It's here...it's rough...but it hopefully gets the job done
Attachment 1: SUSHIRO_For_Dummies_V001.pdf
SUSHIRO_For_Dummies_V001.pdf SUSHIRO_For_Dummies_V001.pdf SUSHIRO_For_Dummies_V001.pdf
ELOG V3.1.4-unknown