ID |
Date |
Author |
Subject |
Text |
 |
127
|
Mon Nov 7 09:04:10 2016 |
Phong,Liu,Ale,Jose | New AIDA plastic calibration | To have a range of about 200 MeV
Ortec671 Gain from x20 to x5 (fine gain : |
|
123
|
Mon Nov 7 04:37:33 2016 |
Phong,Liu,... | Si de and AIDA plastic calibration | 60Co source placed close to the detectors:
ROOT files:
|
|
92
|
Mon Oct 17 05:21:46 2016 |
Phong, Liu J J | dE detector position and output signal from preamplifier | dE detector is mounted onto the back side
of the shielding (attached photo: dE_position.JPG)
|
  |
181
|
Sun Nov 27 10:47:20 2016 |
PV,TD,GK | 40Mg. Run 32 | ======= START =======
Date 2016/11/27
Start time : 16:20
|
|
190
|
Tue Nov 29 00:30:42 2016 |
PV,SN | Sillicon dE bias voltage increased | We increase the bias voltage of the dE
detector from 20 V to 100 V
Leakage current: |
|
277
|
Sat Apr 1 11:13:42 2017 |
PV,OH,JLT | 37Na run 62 | Date: 1/04/2017
Start:19:09
BRIKEN run: 62
|
|
203
|
Mon Mar 27 11:53:15 2017 |
PV,Liu | Turn on dE detector | We applied a bias voltage of 100 V to the
dE detector
Current read = 0.660 uA |
   |
278
|
Sat Apr 1 12:15:21 2017 |
PV, OH, JLT, ID, JA | 37Na run 63 | Date: 1/04/2017
Start:20:15
BRIKEN run: 63
|
|
204
|
Tue Mar 28 06:56:15 2017 |
PV, Liu, JA, JLT | F11 Plastic | Calibration of new F11 plastic
(see photo)
|
  |
209
|
Wed Mar 29 11:02:40 2017 |
PV, Liu, JA, JLT | F11 plastic | New calibration of F11 plastic
We decided to have both a low gain and a |
|
134
|
Tue Nov 8 02:49:19 2016 |
PV, Liu | Specification of the dE silicon detector | The specification and picture of the dE silicon
detector is shown in the attached photos.
The detector has an effective area of 134 |
  |
156
|
Tue Nov 22 10:22:07 2016 |
PV, Liu | No current observed when turning on the HV for the D4 Clover | 19:00
We've turned on the High Voltage for the
D4 Clover up to ~ 1.5 kV.
|
|
183
|
Sun Nov 27 11:15:42 2016 |
PV, GK, AE, TD | 40Mg. Run 34 | ======= START =======
Date 2016/11/27
Start time : 17:29
|
|
182
|
Sun Nov 27 11:07:02 2016 |
PV, GK, AE, TD | 40Mg. Run 33 - junk | ======= START =======
Date 2016/11/27
Start time : 17:17
|
|
280
|
Sat Apr 1 14:21:31 2017 |
PV OH Liu JLT | 37Na run 65 | Date: 1/04/2017
Start:22:12
BRIKEN run: 65
|
|
252
|
Fri Mar 31 10:35:22 2017 |
PV CG JA | Run 40 | Date: 31/03/2017
Start:
BRIKEN run: 40
|
|
191
|
Thu Dec 8 04:17:49 2016 |
PV | Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer | All the RIBF123 elog website (including
Takechi and Fallon experiment) can be
downloaded and installed from the following |
|
192
|
Fri Dec 9 05:25:26 2016 |
PV | Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment | This Pb shielding structure is right behind
the variable degrader |
 |
323
|
Tue Jun 13 05:18:07 2017 |
PV | How to install ELOG for BRIKEN campaign 2017a | Get ELOG software including entries for BRIKEN
campaign 2017a from mars computer:
|
|
322
|
Mon Jun 12 22:28:02 2017 |
Oscar | The SUSHIRO app guide | It's here...it's rough...but it hopefully
gets the job done |
|