AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 4 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  127   Mon Nov 7 09:04:10 2016 Phong,Liu,Ale,JoseNew AIDA plastic calibrationTo have a range of about 200 MeV

Ortec671 Gain from x20 to x5 (fine gain :
 161107_1800_AIDAplasticCalib.pdf 
  123   Mon Nov 7 04:37:33 2016 Phong,Liu,...Si de and AIDA plastic calibration60Co source placed close to the detectors:

ROOT files: 
  
  92   Mon Oct 17 05:21:46 2016 Phong, Liu J JdE detector position and output signal from preamplifierdE detector is mounted onto the back side
of the shielding (attached photo: dE_position.JPG)
 137CsTest_ac.JPGdE_position.JPGdc.JPG 
  181   Sun Nov 27 10:47:20 2016 PV,TD,GK40Mg. Run 32=======    START    =======
Date 2016/11/27
Start time : 16:20
  
  190   Tue Nov 29 00:30:42 2016 PV,SNSillicon dE bias voltage increasedWe increase the bias voltage of the dE
detector from 20 V to 100 V

Leakage current:
  
  277   Sat Apr 1 11:13:42 2017 PV,OH,JLT37Na run 62Date: 1/04/2017 
Start:19:09
BRIKEN run: 62 
  
  203   Mon Mar 27 11:53:15 2017 PV,LiuTurn on dE detectorWe applied a bias voltage of 100 V to the
dE detector

Current read = 0.660 uA
 1_top_60co.png2_top_noiselvl.png3_bottom_60co.png4_bottom_noiselvl.png 
  278   Sat Apr 1 12:15:21 2017 PV, OH, JLT, ID, JA37Na run 63Date: 1/04/2017 
Start:20:15
BRIKEN run: 63 
  
  204   Tue Mar 28 06:56:15 2017 PV, Liu, JA, JLTF11 PlasticCalibration of new F11 plastic
(see photo)
 170328_1507_F11_PL_RandL.pdf170328_1838_F11PLCal.pdfNewF11Plastic.jpg 
  209   Wed Mar 29 11:02:40 2017 PV, Liu, JA, JLTF11 plasticNew calibration of F11 plastic

We decided to have both a low gain and a
  
  134   Tue Nov 8 02:49:19 2016 PV, LiuSpecification of the dE silicon detectorThe specification and picture of the dE silicon
detector is shown in the attached photos.
The detector  has an effective area of 134
 spec_de_1.jpgspec_de_2.jpgIMG_1340.JPG 
  156   Tue Nov 22 10:22:07 2016 PV, LiuNo current observed when turning on the HV for the D4 Clover19:00
We've turned on the High Voltage for the
D4 Clover up to ~ 1.5 kV. 
  
  183   Sun Nov 27 11:15:42 2016 PV, GK, AE, TD 40Mg. Run 34=======    START    =======
Date 2016/11/27
Start time : 17:29
  
  182   Sun Nov 27 11:07:02 2016 PV, GK, AE, TD40Mg. Run 33 - junk=======    START    =======
Date 2016/11/27
Start time : 17:17
  
  280   Sat Apr 1 14:21:31 2017 PV OH Liu JLT37Na run 65Date: 1/04/2017 
Start:22:12
BRIKEN run: 65 
  
  252   Fri Mar 31 10:35:22 2017 PV CG JARun 40Date: 31/03/2017
Start: 
BRIKEN run: 40
  
  191   Thu Dec 8 04:17:49 2016 PVInstalling BRIKEN ELOG 2016 in RIBF local network to a personal computerAll the RIBF123 elog website (including
Takechi and Fallon experiment) can be
downloaded and installed from the following
 Screenshot_from_2016-12-08_13-30-16.png 
  192   Fri Dec 9 05:25:26 2016 PVPhoto and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experimentThis Pb shielding structure is right behind
the variable degrader
 Schematic_PbShielding_FallonRun.pdfIMG_1414.JPG 
  323   Tue Jun 13 05:18:07 2017 PVHow to install ELOG for BRIKEN campaign 2017a Get ELOG software including entries for BRIKEN
campaign 2017a from mars computer:
  
  322   Mon Jun 12 22:28:02 2017 OscarThe SUSHIRO app guideIt's here...it's rough...but it hopefully
gets the job done
 SUSHIRO_For_Dummies_V001.pdf 
ELOG V3.1.4-unknown