|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
BRIKEN, Page 4 of 21 |
 |
|
Mon Nov 7 09:04:10 2016, Phong,Liu,Ale,Jose, New AIDA plastic calibration
|
Mon Nov 7 04:37:33 2016, Phong,Liu,..., Si de and AIDA plastic calibration
|
Mon Oct 17 05:21:46 2016, Phong, Liu J J, dE detector position and output signal from preamplifier  
|
Sun Nov 27 10:47:20 2016, PV,TD,GK, 40Mg. Run 32
|
Tue Nov 29 00:30:42 2016, PV,SN, Sillicon dE bias voltage increased
|
Sat Apr 1 11:13:42 2017, PV,OH,JLT, 37Na run 62
|
Mon Mar 27 11:53:15 2017, PV,Liu, Turn on dE detector   
|
Sat Apr 1 12:15:21 2017, PV, OH, JLT, ID, JA, 37Na run 63
|
Tue Mar 28 06:56:15 2017, PV, Liu, JA, JLT, F11 Plastic  
|
Wed Mar 29 11:02:40 2017, PV, Liu, JA, JLT, F11 plastic
|
Tue Nov 8 02:49:19 2016, PV, Liu, Specification of the dE silicon detector  
|
Tue Nov 22 10:22:07 2016, PV, Liu, No current observed when turning on the HV for the D4 Clover
|
Sun Nov 27 11:15:42 2016, PV, GK, AE, TD , 40Mg. Run 34
|
Sun Nov 27 11:07:02 2016, PV, GK, AE, TD, 40Mg. Run 33 - junk
|
Sat Apr 1 14:21:31 2017, PV OH Liu JLT, 37Na run 65
|
Fri Mar 31 10:35:22 2017, PV CG JA, Run 40
|
Thu Dec 8 04:17:49 2016, PV, Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer
|
Fri Dec 9 05:25:26 2016, PV, Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment 
|
Tue Jun 13 05:18:07 2017, PV, How to install ELOG for BRIKEN campaign 2017a
|
Mon Jun 12 22:28:02 2017, Oscar, The SUSHIRO app guide
|
|