AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 9 of 21  ELOG logo
Entry  Thu May 7 08:36:56 2015, J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.Griffin, First BRIKEN_v.0 beta-delayed neutron correlations? Screenshot_from_2015-05-07_16_01_27.png
During the 98,100Kr setting run we observe 
in the time correlation plot (middle right panel)
of beta signals (marked by AIDA, with amplitude larger than ch=600)
Entry  Mon Oct 31 23:56:37 2016, J. Agramunt, First AIDA BRIKEN correlation plot FirstAIDA_BRIKENPlot.pdf
From the 252Cf data.
Entry  Fri Nov 25 23:18:04 2016, BRIKEN collaboration, Fallon Parasitic experiments 
=====   START OF PARASITIC EXPERIMENTS  ======
Entry  Mon May 4 02:26:14 2015, J.Agramunt J.L.Tain K.Gabor, F11 trigger plugged in Mod2 Ch16 of Briken daq 
 
Entry  Wed Mar 29 11:02:40 2017, PV, Liu, JA, JLT, F11 plastic 
New calibration of F11 plastic

We decided to have both a low gain and a high gain 
Entry  Thu Oct 25 09:18:24 2018, ATS & JLT, F11 plastic 
F11 plastic (long plastic after MUSIC chamber) 
connected to DACQ.
The connections were re-cabled and verified.
Entry  Tue Mar 28 06:56:15 2017, PV, Liu, JA, JLT, F11 Plastic 170328_1507_F11_PL_RandL.pdf170328_1838_F11PLCal.pdfNewF11Plastic.jpg
Calibration of new F11 plastic
(see photo)
Entry  Fri Jul 15 08:29:14 2016, Nathan Brewer, Shintaro Go, Expected Performance and Voltage Setting for Germanium 
Expected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600 keV for all crystals.
Entry  Fri Oct 31 12:58:49 2014, Robert Grzywacz, Entry test - preamps  24.png
Here is a picture of one of our Mesytec preamplifiers. We have  located all seven of them. 
They  have 16 input channels and a common SHV per board.
Entry  Mon May 29 07:06:56 2017, K. Matsui, Energy loss in Long Plastic Scintillator 
After Al degrader with the optimized width of 13 mm, the energy loss in Long Plastic Scintillator is 546(2) MeV at F11.

This value depends on 
    Reply  Fri Nov 4 03:37:27 2016, Roger Caballero, Energy calibration for Ge clovers 20161104-HpGe-EnergyCal.pdf
Energy Calibration: See attached pdf

Detector Slope Offset
Entry  Sat Nov 5 01:25:24 2016, Tain et al, End of Beam Line Setup 9x
Some photos of the elements in the last part of the beam line
during Takechi run.
Entry  Mon Nov 28 01:22:50 2016, BRIKEN collaboration, Elog RIBF123 & BigRIPS 6x
Full RIB123 Elog entries for Takechi && Fallon parasitic experiments
Update:03Dec16
Instructions:
Entry  Wed Nov 9 01:02:53 2016, Iris, Elog 
From Nov. 9th on we use the Takechi ELOG for the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ 
Entry  Sat Nov 26 00:04:15 2016, AT, Elog 
RIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
Entry  Tue Jul 19 03:19:34 2016, A. Tarifeņo, I. Dillman, J. Agramunt, A. Tolosa, J.L. Tain..., Electronics preampCheck.zipnoTubeCh1.zip160717_preampCheck.root160717_preampCheck_noTubes.root
Preamplifier and signal cable testing

We check all signal cables,the flat cable connector to BNC 
Entry  Wed Jul 20 08:58:13 2016, J.L. Tain, I.Dillman, R. Caballero, J. Agramunt, A. Tarifeņo, A. Tolosa, ..., Electronics TubeDistribution-new.xlsxTubeDistribution-new.pdf
Distribution of connections of tubes in preamplifiers and digitizers

Entry  Wed Jul 20 11:16:18 2016, J.L. Tain, Electronics 
Pulser settings

We use two pulsers, Pulser1 for RIKEN, ORNL1 and ORNL2 tubes (7 PA)
Entry  Wed Jul 20 17:18:59 2016, J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, K. Gabor, S. Go, K. Matsui..., Electronics Bkg-afterPAdrying.pngV2A4C3-SpuriousSignal.png
Measurement with preamplifiers after drying.

Amplifiers are brought back after ~12h and connected.
Entry  Thu Oct 6 14:43:47 2016, JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ..., Electronics 
We mount back all preamplifiers
Initially we used all the PA coming from US, the repaired and the new ones.
There was an issue with the new ones (strong noise and cross talk)
ELOG V3.1.3-7933898