Sun Oct 22 10:26:44 2017, JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR, First Wasabi-YSO-BRIKEN correlation test 
|
60Co source between YSO and Wasabi in front of D4 Clover
Briken configuration file: 171022_1811_Conf_BrikenFullYSO.xlsx WRONG!!!
Start: 18:25
|
Thu May 7 08:36:56 2015, J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.Griffin, First BRIKEN_v.0 beta-delayed neutron correlations?
|
During the 98,100Kr setting run we observe
in the time correlation plot (middle right panel)
of beta signals (marked by AIDA, with amplitude larger than ch=600)
|
Mon Oct 31 23:56:37 2016, J. Agramunt, First AIDA BRIKEN correlation plot
|
| From the 252Cf data. |
Fri Nov 25 23:18:04 2016, BRIKEN collaboration, Fallon Parasitic experiments
|
| ===== START OF PARASITIC EXPERIMENTS ====== |
Mon May 4 02:26:14 2015, J.Agramunt J.L.Tain K.Gabor, F11 trigger plugged in Mod2 Ch16 of Briken daq
|
| |
Wed Mar 29 11:02:40 2017, PV, Liu, JA, JLT, F11 plastic
|
New calibration of F11 plastic
We decided to have both a low gain and a high gain
|
Thu Oct 25 09:18:24 2018, ATS & JLT, F11 plastic
|
F11 plastic (long plastic after MUSIC chamber)
connected to DACQ.
The connections were re-cabled and verified.
|
Tue Mar 28 06:56:15 2017, PV, Liu, JA, JLT, F11 Plastic  
|
Calibration of new F11 plastic
(see photo)
|
Fri Jul 15 08:29:14 2016, Nathan Brewer, Shintaro Go, Expected Performance and Voltage Setting for Germanium
|
Expected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600 keV for all crystals. |
Fri Oct 31 12:58:49 2014, Robert Grzywacz, Entry test - preamps
|
Here is a picture of one of our Mesytec preamplifiers. We have located all seven of them.
They have 16 input channels and a common SHV per board.
|
Mon May 29 07:06:56 2017, K. Matsui, Energy loss in Long Plastic Scintillator
|
After Al degrader with the optimized width of 13 mm, the energy loss in Long Plastic Scintillator is 546(2) MeV at F11.
This value depends on |
Fri Nov 4 03:37:27 2016, Roger Caballero, Energy calibration for Ge clovers
|
Energy Calibration: See attached pdf
Detector Slope Offset
|
Sat Nov 5 01:25:24 2016, Tain et al, End of Beam Line Setup 9x
|
Some photos of the elements in the last part of the beam line
during Takechi run.
|
Mon Nov 28 01:22:50 2016, BRIKEN collaboration, Elog RIBF123 & BigRIPS 6x
|
Full RIB123 Elog entries for Takechi && Fallon parasitic experiments
Update:03Dec16
Instructions:
|
Wed Nov 9 01:02:53 2016, Iris, Elog
|
From Nov. 9th on we use the Takechi ELOG for the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ |
Sat Nov 26 00:04:15 2016, AT, Elog
|
RIKEN Elog during Fallon Parasitic experiments
Fallon Group:
|
Tue Jul 19 03:19:34 2016, A. Tarifeņo, I. Dillman, J. Agramunt, A. Tolosa, J.L. Tain..., Electronics   
|
Preamplifier and signal cable testing
We check all signal cables,the flat cable connector to BNC
|
Wed Jul 20 08:58:13 2016, J.L. Tain, I.Dillman, R. Caballero, J. Agramunt, A. Tarifeņo, A. Tolosa, ..., Electronics 
|
Distribution of connections of tubes in preamplifiers and digitizers
|
Wed Jul 20 11:16:18 2016, J.L. Tain, Electronics
|
Pulser settings
We use two pulsers, Pulser1 for RIKEN, ORNL1 and ORNL2 tubes (7 PA)
|
Wed Jul 20 17:18:59 2016, J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, K. Gabor, S. Go, K. Matsui..., Electronics 
|
Measurement with preamplifiers after drying.
Amplifiers are brought back after ~12h and connected.
|