AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 9 of 21  ELOG logo
  ID Date Author Subjectdown Text Attachments
  27   Thu May 7 08:36:56 2015 J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.GriffinFirst BRIKEN_v.0 beta-delayed neutron correlations?During the 98,100Kr setting run we observe

in the time correlation plot (middle right
 Screenshot_from_2015-05-07_16_01_27.png 
  95   Mon Oct 31 23:56:37 2016 J. AgramuntFirst AIDA BRIKEN correlation plotFrom the 252Cf data.  FirstAIDA_BRIKENPlot.pdf 
  168   Fri Nov 25 23:18:04 2016 BRIKEN collaborationFallon Parasitic experiments=====   START OF PARASITIC EXPERIMENTS  ======   
  15   Mon May 4 02:26:14 2015 J.Agramunt J.L.Tain K.GaborF11 trigger plugged in Mod2 Ch16 of Briken daq    
  209   Wed Mar 29 11:02:40 2017 PV, Liu, JA, JLTF11 plasticNew calibration of F11 plastic

We decided to have both a low gain and a
  
  391   Thu Oct 25 09:18:24 2018 ATS & JLTF11 plasticF11 plastic (long plastic after MUSIC chamber)

connected to DACQ.
  
  204   Tue Mar 28 06:56:15 2017 PV, Liu, JA, JLTF11 PlasticCalibration of new F11 plastic
(see photo)
 170328_1507_F11_PL_RandL.pdf170328_1838_F11PLCal.pdfNewF11Plastic.jpg 
  36   Fri Jul 15 08:29:14 2016 Nathan Brewer, Shintaro GoExpected Performance and Voltage Setting for GermaniumExpected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600
  
  3   Fri Oct 31 12:58:49 2014 Robert GrzywaczEntry test - preamps Here is a picture of one of our Mesytec preamplifiers.
We have  located all seven of them. 
They  have 16 input channels and a common
 24.png 
  Draft   Mon May 29 07:06:56 2017 K. MatsuiEnergy loss in Long Plastic ScintillatorAfter Al degrader with the optimized width
of 13 mm, the energy loss in Long Plastic
Scintillator is 546(2) MeV at F11.
  
  108   Fri Nov 4 03:37:27 2016 Roger CaballeroEnergy calibration for Ge cloversEnergy Calibration: See attached pdf

Detector Slope Offset
 20161104-HpGe-EnergyCal.pdf 
  110   Sat Nov 5 01:25:24 2016 Tain et alEnd of Beam Line SetupSome photos of the elements in the last part
of the beam line
during Takechi run.
 9x 
  186   Mon Nov 28 01:22:50 2016 BRIKEN collaborationElog RIBF123 & BigRIPSFull RIB123 Elog entries for Takechi && Fallon
parasitic experiments
Update:03Dec16
 6x 
  146   Wed Nov 9 01:02:53 2016 IrisElogFrom Nov. 9th on we use the Takechi ELOG for
the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ 
  
  169   Sat Nov 26 00:04:15 2016 ATElogRIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
  
  41   Tue Jul 19 03:19:34 2016 A. Tarifeņo, I. Dillman, J. Agramunt, A. Tolosa, J.L. Tain...ElectronicsPreamplifier and signal cable testing

We check all signal cables,the flat cable
 preampCheck.zipnoTubeCh1.zip160717_preampCheck.root160717_preampCheck_noTubes.root 
  46   Wed Jul 20 08:58:13 2016 J.L. Tain, I.Dillman, R. Caballero, J. Agramunt, A. Tarifeņo, A. Tolosa, ...ElectronicsDistribution of connections of tubes in preamplifiers
and digitizers
 TubeDistribution-new.xlsxTubeDistribution-new.pdf 
  47   Wed Jul 20 11:16:18 2016 J.L. TainElectronicsPulser settings

We use two pulsers, Pulser1 for RIKEN, ORNL1
  
  57   Wed Jul 20 17:18:59 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, K. Gabor, S. Go, K. Matsui...ElectronicsMeasurement with preamplifiers after drying.

Amplifiers are brought back after ~12h and
 Bkg-afterPAdrying.pngV2A4C3-SpuriousSignal.png 
  64   Thu Oct 6 14:43:47 2016 JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ...ElectronicsWe mount back all preamplifiers
Initially we used all the PA coming from
US, the repaired and the new ones.
  
ELOG V3.1.4-unknown