|
ID |
Date |
Author |
Subject |
Text |
 |
|
27
|
Thu May 7 08:36:56 2015 |
J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.Griffin | First BRIKEN_v.0 beta-delayed neutron correlations? | During the 98,100Kr setting run we observe
in the time correlation plot (middle right |
|
|
95
|
Mon Oct 31 23:56:37 2016 |
J. Agramunt | First AIDA BRIKEN correlation plot | From the 252Cf data. |
|
|
168
|
Fri Nov 25 23:18:04 2016 |
BRIKEN collaboration | Fallon Parasitic experiments | ===== START OF PARASITIC EXPERIMENTS ====== |
|
|
15
|
Mon May 4 02:26:14 2015 |
J.Agramunt J.L.Tain K.Gabor | F11 trigger plugged in Mod2 Ch16 of Briken daq | |
|
|
209
|
Wed Mar 29 11:02:40 2017 |
PV, Liu, JA, JLT | F11 plastic | New calibration of F11 plastic
We decided to have both a low gain and a |
|
|
391
|
Thu Oct 25 09:18:24 2018 |
ATS & JLT | F11 plastic | F11 plastic (long plastic after MUSIC chamber)
connected to DACQ.
|
|
|
204
|
Tue Mar 28 06:56:15 2017 |
PV, Liu, JA, JLT | F11 Plastic | Calibration of new F11 plastic
(see photo)
|
  |
|
36
|
Fri Jul 15 08:29:14 2016 |
Nathan Brewer, Shintaro Go | Expected Performance and Voltage Setting for Germanium | Expected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600 |
|
|
3
|
Fri Oct 31 12:58:49 2014 |
Robert Grzywacz | Entry test - preamps | Here is a picture of one of our Mesytec preamplifiers.
We have located all seven of them.
They have 16 input channels and a common |
|
|
Draft
|
Mon May 29 07:06:56 2017 |
K. Matsui | Energy loss in Long Plastic Scintillator | After Al degrader with the optimized width
of 13 mm, the energy loss in Long Plastic
Scintillator is 546(2) MeV at F11. |
|
|
108
|
Fri Nov 4 03:37:27 2016 |
Roger Caballero | Energy calibration for Ge clovers | Energy Calibration: See attached pdf
Detector Slope Offset
|
|
|
110
|
Sat Nov 5 01:25:24 2016 |
Tain et al | End of Beam Line Setup | Some photos of the elements in the last part
of the beam line
during Takechi run.
|
9x |
|
186
|
Mon Nov 28 01:22:50 2016 |
BRIKEN collaboration | Elog RIBF123 & BigRIPS | Full RIB123 Elog entries for Takechi && Fallon
parasitic experiments
Update:03Dec16
|
6x |
|
146
|
Wed Nov 9 01:02:53 2016 |
Iris | Elog | From Nov. 9th on we use the Takechi ELOG for
the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ |
|
|
169
|
Sat Nov 26 00:04:15 2016 |
AT | Elog | RIKEN Elog during Fallon Parasitic experiments
Fallon Group:
|
|
|
41
|
Tue Jul 19 03:19:34 2016 |
A. Tarifeņo, I. Dillman, J. Agramunt, A. Tolosa, J.L. Tain... | Electronics | Preamplifier and signal cable testing
We check all signal cables,the flat cable |
   |
|
46
|
Wed Jul 20 08:58:13 2016 |
J.L. Tain, I.Dillman, R. Caballero, J. Agramunt, A. Tarifeņo, A. Tolosa, ... | Electronics | Distribution of connections of tubes in preamplifiers
and digitizers
|
 |
|
47
|
Wed Jul 20 11:16:18 2016 |
J.L. Tain | Electronics | Pulser settings
We use two pulsers, Pulser1 for RIKEN, ORNL1 |
|
|
57
|
Wed Jul 20 17:18:59 2016 |
J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, K. Gabor, S. Go, K. Matsui... | Electronics | Measurement with preamplifiers after drying.
Amplifiers are brought back after ~12h and |
 |
|
64
|
Thu Oct 6 14:43:47 2016 |
JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ... | Electronics | We mount back all preamplifiers
Initially we used all the PA coming from
US, the repaired and the new ones.
|
|