Fri May 26 08:53:54 2023 |
JM, CB | Strain reliefs (flange side) installed | Strain reliefs on the flange side of the
cable harness have been installed for two
detectors (top right and bottom right detectors). |
   |
|
403
|
Wed May 24 09:54:56 2023 |
JM, CB | Maximum detector positions | The detectors were moved into the beam
axis using the motors to check the maximum
distance they can be moved in without collision |
9x |
|
402
|
Wed May 24 08:35:12 2023 |
JM, CB | Strain reliefs (detector side) installed | The new MACOR strain reliefs on the (detector
side) have been installed. See attached photos
The two pieces of MACOR are |
    |
|
401
|
Mon May 15 07:34:22 2023 |
TD | Monday 15 May | 08.35 DSSSD#3 bias -149.95V leakage current
-6.418uA temperature +19.6 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
)
|
|
|
400
|
Sun May 14 11:55:12 2023 |
TD | Sunday 14 May | 12.44 DSSSD#3 bias -149.95V leakage current
-6.448uA temperature +19.7 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
)
|
|
|
399
|
Sat May 13 11:34:25 2023 |
TD, RSS | Saturday 13 May |
12.34 DSSSD#3 bias -149.95V leakage current
-6.763uA temperature +21.2 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php |
|
|
398
|
Fri May 12 16:24:20 2023 |
RSS, TD | V-I test | Since yesterday evening, the bottom right
detector was at -150 V. In the morning, the
current was quite stable ~ 6.77 uA. The bias |
8x |
|
397
|
Thu May 11 21:22:54 2023 |
RSS, TD | V-I test | Today, the foil was opened, the pins on
the bottom right detector were checked and
looked fine, the right-hand arm was moved |
7x |
|
396
|
Wed May 10 19:06:18 2023 |
RSS, TD | V-I test | To test the detectors, adaptors were installed
on the feed through flanges. A negative bias
voltage was applied in steps of 10 V from |
   |
|
395
|
Tue May 2 15:02:09 2023 |
CB, JM | All detectors and harnesses mounted | Completed mounting harnesses and detectors.
The strain relief support for the
bottom most two detectors on the feedthrough |
   |
|
394
|
Mon May 1 18:21:18 2023 |
CB, JM | All detectors mounted | Mounted four detectors on Carme ad well
as four cable harnesses.
|
  |
|
393
|
Mon May 1 08:26:09 2023 |
CB, JM | Left hand detectors remounted | (31 April)
Remounted 3335-12 on top and new
3335-1 on bottom of left hand plate. Used |
|
|
392
|
Sun Apr 30 10:01:39 2023 |
CB, JM | Left hand detectors unmounted | (29 April)
Inspected CARME after opening.
See attached. Some key takeaways. |
26x |
|
391
|
Sat Apr 29 10:12:58 2023 |
CB, JM | CARME opened | (28 April)
Mounted rails on dolly. The rails
don't smoothly connect to those on the |
8x |
|
390
|
Thu Apr 27 19:43:23 2023 |
CB, JM | Preparing to open | Removed turbo pump and set aside in a box.
Considering switching to the other turbo
to avoid degradation due to lack of use. |
 |
|
389
|
Wed Apr 26 16:49:28 2023 |
CB, JM | CARME dolly mostly built | Disconnected cables from CARME motors and
turbo. The turbo has to go to allow Carme
to slide out. Crane may be required to lift |
  |
|
388
|
Tue Apr 25 13:22:19 2023 |
JM | CARME venting | CARME venting using nitrogen gas bottle.
Coolant pipes dismounted from the
chamber |
 |
|
387
|
Mon Apr 24 21:24:26 2023 |
JM | Preparation for CARME dismount | CARME currently in vacuum, pressure ~3E-10
mbar. Chamber to be vented tomorrow afternoon
by vacuum division. We have active both pirani |
  |
|
386
|
Wed Mar 22 16:33:32 2023 |
TD | NIM WR source |
Test of NIM WR source at Edinburgh
|
8x |
|
385
|
Wed Jan 18 13:32:36 2023 |
PJCS | MACB settings with either Emulator or VETAR | When using the VITAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3. |
   |