  586   Tue Jun 4 14:13:17 2024 JM, CB, DB, USRun 32- beam only background15:15

Run 32 started - Beam, no target

Beam energy = 3 MeV.
  
  585   Tue Jun 4 06:56:02 2024 DFF, PC, LB, JM,NP,ABRun 31 contd8:13

Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable
 Screenshot_from_2024-06-04_10-53-58.pngScreenshot_from_2024-06-04_10-58-02.png 
  584   Tue Jun 4 00:04:39 2024 DR, EHRun 31Beam energy = 3 MeV

Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm.
  
  583   Mon Jun 3 21:37:20 2024 CN, EM, CBRun30Beam energy = 3 MeV

Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm.
 Screenshot_from_2024-06-03_23-15-37.pngScreenshot_from_2024-06-03_23-16-18.pngScreenshot_from_2024-06-03_23-17-16.png 
  582   Mon Jun 3 15:17:41 2024 CN, EM, CBRun29 16:15

In the previous run while working
on the target it was discovered that the
 Screenshot_from_2024-06-03_18-04-47.pngScreenshot_from_2024-06-03_18-05-11.pngScreenshot_from_2024-06-03_18-06-09.pngScreenshot_from_2024-06-03_18-06-40.pngScreenshot_from_2024-06-03_20-35-00.png 
  581   Mon Jun 3 15:10:12 2024 CN, EM, CBRun2816:10

We start a new run after doing
some test with the motor. Injection time
 Screenshot_from_2024-06-03_16-12-44.pngScreenshot_from_2024-06-03_16-13-11.pngScreenshot_from_2024-06-03_16-14-11.pngScreenshot_from_2024-06-03_16-16-37.png 
  580   Mon Jun 3 11:46:07 2024 SD, SHB, JM, CN, EMRun 2712:46 (attachments 1-4)

Run 27 started - Beam no target

Beam energy = 3 MeV
 12x 
  579   Mon Jun 3 08:43:22 2024 SD, SHBRun 2609:44

Run 26 started - Beam no target

Beam energy is being increased
 8x 
  578   Sun Jun 2 23:38:17 2024 JM, EMRun 25 00:38

Run 25 started - Beam on target

Beam energy = 1.5 MeV.
 32x 
  577   Sun Jun 2 22:46:47 2024 JM, EM, NPRun2423:47

Run 24 started - Beam on target

Beam energy is 1.5 MeV.
 Screenshot_from_2024-06-02_23-53-00.pngScreenshot_from_2024-06-02_23-53-47.pngScreenshot_from_2024-06-02_23-56-22.png 
  576   Sun Jun 2 14:30:16 2024 TDOffline analysis G22-201/R22_0 - R22_11Offline analysis data file G22-201/R22_0 to
R22_11
 8x 
  575   Sun Jun 2 13:04:41 2024 JM, AG, CB, DRRun 23 - vertical beam position and beam lifetime tests14:05

Run 22 stopped. Run 23 started
we will now adjust the vertical beam position
 Screenshot_from_2024-06-02_14-04-55.png 
  574   Sun Jun 2 08:47:01 2024 CB, AGRun 22 - longer rung with 20 min storage09:47

12 seconds pre acc

200x cycles
 Screenshot_from_2024-06-02_09-47-53.pngScreenshot_from_2024-06-02_09-48-06.pngScreenshot_from_2024-06-02_11-21-59.pngScreenshot_from_2024-06-02_11-22-27.pngScreenshot_from_2024-06-02_13-02-31.png 
  573   Sun Jun 2 06:41:00 2024 CB, AGRun 21 - tests07:41

Switching to bunched beam to check
D vs H content.
 10x 
  572   Sat Jun 1 21:56:17 2024 JM, EM, EM, TY, CB, AGRun 2022:56

Run 20 started - beam on target

Beam energy is 1.5 MeV. Horizontal
 18x 
  571   Sat Jun 1 16:38:13 2024 TDOffline analysis G22-201/R17Offline analysis data file G22-201/R17

Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
 8x 
  570   Sat Jun 1 13:33:50 2024 TDOffline analysis APR24/R3 (alpha background)
Offline analysis data file APR24/R3 (alpha
background)
 9x 
  569   Sat Jun 1 07:16:15 2024 CB, AB, EM, JMRun 19 - beam target overlapMorning shift

08:16 - as run 18, target off

9:00 Increased storage time to
 19x 
  568   Fri May 31 21:53:20 2024 CB EM, JM,EM ABOvernight beam tests22:53

Run 15 started

Beam tests. We increased the storage
 17x 
  567   Fri May 31 21:03:21 2024 CB, EMRun1422:03

Before this run we checked quickly 
beam with the target on but it does not make
 Screenshot_from_2024-05-31_22-05-57.pngScreenshot_from_2024-05-31_22-07-01.pngScreenshot_from_2024-05-31_22-07-49.png 