  116   Mon Oct 11 11:24:16 2021 RSS TD MLValve support and cable labeling

Split funnels were given to Oemer for cleaning. Have received them back after lunch.

Valve support is installed again (see picture 1).

Ion pump was connected but not activated. Michael will help in doing so. No vacuum support to help will RGA. Will proceed without it.

Neg and ion cables were labeled (see pictures 2 and 3).

Chamber was vented using nitrogen.

 

Attachment 1: IMG_4962.JPG
IMG_4962.JPG
Attachment 2: IMG_4969.JPG.svg
IMG_4969.JPG.svg
Attachment 3: IMG_4968.JPG.svg
IMG_4968.JPG.svg
  117   Tue Oct 12 09:22:37 2021 RSS TD + OG DRMotors problem solved

Neg and ion cables were taken off and were put in the box.

Top support was taken off.

Motors are rotating again. Have to be careful with the position of the limit switches.

Attachment 1: IMG_4971.JPG
IMG_4971.JPG
Attachment 2: IMG_4970.JPG
IMG_4970.JPG
  122   Wed Oct 13 15:28:22 2021 RSS TD + OGSplit funnels

Split funnels installed on 4 (of 8) 2x78 way D connector feed-throughs.

Attachment 1: IMG_5038.JPG
IMG_5038.JPG
Attachment 2: IMG_5039.JPG
IMG_5039.JPG
Attachment 3: IMG_5040.JPG
IMG_5040.JPG
Attachment 4: IMG_5041.JPG
IMG_5041.JPG
Attachment 5: IMG_5042.JPG
IMG_5042.JPG
Attachment 6: IMG_5043.JPG
IMG_5043.JPG
Attachment 7: IMG_5044.JPG
IMG_5044.JPG
  150   Wed Nov 10 18:38:16 2021 RSS TD + ML OG AK NKCARME wrapped in heating tape

Heating and electronic experts were in CRYRING and were unhappy with the damaged wire. Heaters were opened by OG, but no damage was found. It is suggested to replace the entire wire and then get it approved by the concerned authority.

To avoid further delays, ML and TD agreed on heating tapes/wires covering the chamber. OG helped in wrapping the heating wire around. Tent is to be built by tomorrow.

MG and RSS tried the magnetic power back off thing which eventually did not work.

AK and NK helped with the power and thermocouple of the heating wire. NK has also covered the pipe and bellows near the magnet with heating jackets.

 

Attachment 1: IMG_5514(1).JPG
IMG_5514(1).JPG
Attachment 2: IMG_5517(1).JPG
IMG_5517(1).JPG
Attachment 3: IMG_5518.JPG
IMG_5518.JPG
Attachment 4: IMG_5520.JPG
IMG_5520.JPG
Attachment 5: IMG_5521(1).JPG
IMG_5521(1).JPG
  124   Fri Oct 15 19:37:12 2021 RSS TD + DRFriday 15 October

Ring seal is out. See picture 1.

Bellow (towards CARME) was installed in the gas jet chamber. Attached are some pictures.

Attachment 1: IMG_5059.JPG
IMG_5059.JPG
Attachment 2: IMG_5060.JPG
IMG_5060.JPG
Attachment 3: IMG_5061.JPG
IMG_5061.JPG
Attachment 4: IMG_5062.JPG
IMG_5062.JPG
Attachment 5: IMG_5064.JPG
IMG_5064.JPG
Attachment 6: IMG_5068.JPG
IMG_5068.JPG
Attachment 7: IMG_5071.JPG
IMG_5071.JPG
Attachment 8: IMG_5073.JPG
IMG_5073.JPG
  42   Fri Aug 13 07:28:37 2021 RSS TDFriday 13-17 August
Pirani  IE514
mbar    mbar



13/8/21 08:00 0.0075 3.53e-7
13/8/21 12:00 0.0065 2.80e-7
13/8/21 15:20 0.0065 2.40e-7
13/8/21 16:30 0.0060 2.29e-7


---------------------------------


14/8/21 12:00 0.0046 1.25e-7
14/8/21 12:00 0.0044 1.14e-7


---------------------------------


15/8/21 09:00 0.0040 8.47e-8
15/8/21 12:30 0.0040 8.00e-8
15/8/21 15:30 0.0040 7.69e-8


---------------------------------


16/8/21 08:00 0.0038 6.36e-8
16/8/21 11:30 0.0036 6.14e-8
16/8/21 17:00 0.0036 5.82e-8


---------------------------------


17/8/21 08:00 0.0034 4.82e-8
17/8/21 17:00 0.0034 4.47e-8
Attachment 1: IMG_4196.JPG
IMG_4196.JPG
Attachment 2: IMG_4197.JPG
IMG_4197.JPG
Attachment 3: IMG_4198.JPG
IMG_4198.JPG
Attachment 4: scroll_pump_13.08.png
scroll_pump_13.08.png
Attachment 5: turbo_pump_13.08.png
turbo_pump_13.08.png
Attachment 6: IMG_4237.JPG
IMG_4237.JPG
Attachment 7: IMG_4238.JPG
IMG_4238.JPG
Attachment 8: turbo_pump_14.08.png
turbo_pump_14.08.png
Attachment 9: scroll_pump_14.08.png
scroll_pump_14.08.png
Attachment 10: IMG_4244.JPG
IMG_4244.JPG
Attachment 11: IMG_4245.JPG
IMG_4245.JPG
Attachment 12: turbo_pump_15.08.png
turbo_pump_15.08.png
Attachment 13: scroll_pump_15.08.png
scroll_pump_15.08.png
Attachment 14: IMG_4257.JPG
IMG_4257.JPG
Attachment 15: IMG_4258.JPG
IMG_4258.JPG
Attachment 16: turbo_pump_16.08.png
turbo_pump_16.08.png
Attachment 17: scroll_pump_16.08.png
scroll_pump_16.08.png
Attachment 18: IMG_4265.JPG
IMG_4265.JPG
Attachment 19: IMG_4266.JPG
IMG_4266.JPG
Attachment 20: turbo_pump_log_scale.png
turbo_pump_log_scale.png
Attachment 21: scroll_pump_17.08.png
scroll_pump_17.08.png
Attachment 22: turbo_pump_17.08.png
turbo_pump_17.08.png
Attachment 23: log_scale_17.08.png
log_scale_17.08.png
  43   Wed Aug 18 07:07:26 2021 RSS TD18-24 August
Pirani  IE514
mbar    mbar


18/8/21 08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032 3.72e-8

 

-------------------------------------------------------------

19/8/21  08:00  0.0032  3.38e-8

19/8/21  17:00  0.0032  3.31e-8

 

-------------------------------------------------------------

20/8/21  08:00  0.0032  3.02e-8

 

-------------------------------------------------------------

21/8/21  16:00  0.0032  2.59e-8

 

-------------------------------------------------------------

22/8/21  12:00  0.0034  2.44e-8

 

-------------------------------------------------------------

23/8/21  08:00  0.0030  2.23e-8

 

-------------------------------------------------------------

24/8/21  08:00  0.0030  2.15e-8

 

 

 

Attachment 1: IMG_4273.JPG
IMG_4273.JPG
Attachment 2: IMG_4274.JPG
IMG_4274.JPG
Attachment 3: log_scale_18.08.png
log_scale_18.08.png
Attachment 4: turbo_pump_18.08.png
turbo_pump_18.08.png
Attachment 5: scroll_pump_18.08.png
scroll_pump_18.08.png
Attachment 6: IMG_4281.JPG
IMG_4281.JPG
Attachment 7: log_scale_19.08.png
log_scale_19.08.png
Attachment 8: turbo_pump_19.08.png
turbo_pump_19.08.png
Attachment 9: scroll_pump_19.08.png
scroll_pump_19.08.png
Attachment 10: IMG_4290.JPG
IMG_4290.JPG
Attachment 11: IMG_4301.JPG
IMG_4301.JPG
Attachment 12: log_scale_21.08.png
log_scale_21.08.png
Attachment 13: turbo_pump_21.08.png
turbo_pump_21.08.png
Attachment 14: scroll_pump_21.08.png
scroll_pump_21.08.png
Attachment 15: IMG_4323.JPG
IMG_4323.JPG
Attachment 16: IMG_4324.JPG
IMG_4324.JPG
Attachment 17: log_scale_22.08.png
log_scale_22.08.png
Attachment 18: turbo_pump_22.08.png
turbo_pump_22.08.png
Attachment 19: scroll_pump_22.08.png
scroll_pump_22.08.png
Attachment 20: IMG_4339.JPG
IMG_4339.JPG
Attachment 21: IMG_4340.JPG
IMG_4340.JPG
Attachment 22: IMG_4345.JPG
IMG_4345.JPG
Attachment 23: log_scale_24.08.png
log_scale_24.08.png
Attachment 24: turbo_pump_24.08.png
turbo_pump_24.08.png
Attachment 25: scroll_pump_24.08.png
scroll_pump_24.08.png
  45   Wed Aug 25 07:02:41 2021 RSS TD25-31 August
Pirani  IE514
mbar    mbar


25/8/21 08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00  0.0030   1.77e-8

----------------------------------------------------

27/8/21   08:00  0.0030   1.76e-8

----------------------------------------------------

28/8/21   17:30  0.0029   1.63e-8

----------------------------------------------------

30/8/21   08:00  0.0028   1.43e-8

----------------------------------------------------

31/8/21   08:30  0.0027  1.40e-8

Attachment 1: IMG_4349.JPG
IMG_4349.JPG
Attachment 2: IMG_4360.JPG
IMG_4360.JPG
Attachment 3: log_scale_26.08.png
log_scale_26.08.png
Attachment 4: turbo_pump_26.08.png
turbo_pump_26.08.png
Attachment 5: scroll_pump_26.08.png
scroll_pump_26.08.png
Attachment 6: IMG_4367.JPG
IMG_4367.JPG
Attachment 7: log_scale_27.08.png
log_scale_27.08.png
Attachment 8: IMG_4372.JPG
IMG_4372.JPG
Attachment 9: log_scale_28.08.png
log_scale_28.08.png
Attachment 10: IMG_4426.JPG
IMG_4426.JPG
Attachment 11: IMG_4427.JPG
IMG_4427.JPG
Attachment 12: log_scale_30.08.png
log_scale_30.08.png
Attachment 13: turbo_pump_30.08.png
turbo_pump_30.08.png
Attachment 14: scroll_pump_30.08.png
scroll_pump_30.08.png
Attachment 15: log_scale_31.08.png
log_scale_31.08.png
Attachment 16: turbo_pump_31.08.png
turbo_pump_31.08.png
Attachment 17: scroll_pump_31.08.png
scroll_pump_31.08.png
Attachment 18: IMG_4445.JPG
IMG_4445.JPG
Attachment 19: IMG_4446.JPG
IMG_4446.JPG
  120   Wed Oct 13 12:06:09 2021 RSS TDFlanges cleaned
RSS & TD had some success cleaning the COF600 flange surfaces of the staining and residues observed when the downstream COF600 section was opened yesterday  
https://elog.ph.ed.ac.uk/CARME/118

Isopropanol and laboratory tissues were used - most but not all of the staining and the residues were removed.
Attachment 1: IMG_5011.JPG
IMG_5011.JPG
Attachment 2: IMG_5012.JPG
IMG_5012.JPG
Attachment 3: IMG_5013.JPG
IMG_5013.JPG
Attachment 4: IMG_5014.JPG
IMG_5014.JPG
Attachment 5: IMG_5015.JPG
IMG_5015.JPG
Attachment 6: IMG_5016.JPG
IMG_5016.JPG
Attachment 7: IMG_5018.JPG
IMG_5018.JPG
Attachment 8: IMG_5019.JPG
IMG_5019.JPG
Attachment 9: IMG_5020.JPG
IMG_5020.JPG
Attachment 10: IMG_5021.JPG
IMG_5021.JPG
Attachment 11: IMG_5022.JPG
IMG_5022.JPG
Attachment 12: IMG_5023.JPG
IMG_5023.JPG
  125   Sat Oct 16 17:25:47 2021 RSS TDBroken detectors

One of the detectors was damaged while mounting (see pictures 1-3).

Second detector was found already damaged when opened (see pictures 4-5).

Attachment 1: IMG_5098.JPG
IMG_5098.JPG
Attachment 2: IMG_5097.JPG
IMG_5097.JPG
Attachment 3: IMG_5096.JPG
IMG_5096.JPG
Attachment 4: IMG_5106.JPG
IMG_5106.JPG
Attachment 5: IMG_5105.JPG
IMG_5105.JPG
  287   Sat Feb 26 04:36:38 2022 RSS TDSaturday 26 February 07:00-15:00
05:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar as reported earlier
      See attachments 1 & 2
      E4 pressure not < 5e-10mbar - wait to startup gas jet target

06:47 RSS & TD on-site

07.00 E4 1.70e-9mbar
      S3 9.42e-10mbar

07:00 Checks: all good except for the white rabbit decoder status.

07:15 All histograms cleared in the run control tab.

07.32 E4 1.60e-9mbar
      S3 9.00e-10mbar

08:06 E4 1.49e-9mbar
      S3 8.59e-10mbar

08:30 E4 1.43e-9mbar
      S3 8.34e-10mbar

09:00 E4 1.35e-9mbar
      S3 8.03e-10mbar

09:30 E4 1.29e-9mbar
      S3 7.70e-10mbar

10:00 E4 1.23e-9mbar
      S3 7.49e-10mbar

10:00 Checks: all good except for the white rabbit decoder status.

10:30 E4 1.18e-9mbar
      S3 7.22e-10mbar

11:00 E4 1.14e-9mbar
      S3 7.02e-10mbar

11:20 Compressor was switched on.

11:30 E4 1.10e-9mbar
      S3 6.82e-10mbar

12:00 E4 1.35e-9mbar
      S3 6.64e-10mbar

12:30 E4 1.23e-9mbar
      S3 6.46e-10mbar

14:45 Checks: all good except for the white rabbit decoder status.

17.20 System wide checks OK *except* WR decoder status

		 Base 		Current 	Difference
aida01 fault 	 0xab60 : 	 0xab85 : 	 37  
aida02 fault 	 0x88d3 : 	 0x88f7 : 	 36  
aida03 fault 	 0x23aa : 	 0x23cf : 	 37  
aida04 fault 	 0x15d7 : 	 0x15fc : 	 37  
aida05 fault 	 0x2f03 : 	 0x2f0e : 	 11  
White Rabbit error counter test result: Passed 0, Failed 5

FEE64 temperatures OK - attachment 26
stats (adc data items) OK - attachment 27

DSSSD bias -100V leakage current -3.31uA
Attachment 1: Capture_1.PNG
Capture_1.PNG
Attachment 2: Capture_2.PNG
Capture_2.PNG
Attachment 3: 7-spectrum-id8-2022-02-26_07-14-49.png
7-spectrum-id8-2022-02-26_07-14-49.png
Attachment 4: 7-spectrum-id7-2022-02-26_07-14-12.png
7-spectrum-id7-2022-02-26_07-14-12.png
Attachment 5: 7-spectrum-42022-02-26_07-13-21.png
7-spectrum-42022-02-26_07-13-21.png
Attachment 6: 7-spectrum-3-2022-02-26_07-12-50.png
7-spectrum-3-2022-02-26_07-12-50.png
Attachment 7: 7-spectrum2-2022-02-26_07-12-02.png
7-spectrum2-2022-02-26_07-12-02.png
Attachment 8: 7-spectrum1-2022-02-26_07-10-55.png
7-spectrum1-2022-02-26_07-10-55.png
Attachment 9: 7-spectrum-2022-02-26_07-10-10.png
7-spectrum-2022-02-26_07-10-10.png
Attachment 10: 7-correlation-2022-02-26_07-09-11.png
7-correlation-2022-02-26_07-09-11.png
Attachment 11: 7-adc-2022-02-26_07-08-53.png
7-adc-2022-02-26_07-08-53.png
Attachment 12: 7-good-events-2022-02-26_07-08-27.png
7-good-events-2022-02-26_07-08-27.png
Attachment 13: 10-id2-2022-02-26_10-06-08.png
10-id2-2022-02-26_10-06-08.png
Attachment 14: 10-id1-2022-02-26_10-04-01.png
10-id1-2022-02-26_10-04-01.png
Attachment 15: 10-correlation-2022-02-26_10-03-08.png
10-correlation-2022-02-26_10-03-08.png
Attachment 16: 10-adc-2022-02-26_10-02-47.png
10-adc-2022-02-26_10-02-47.png
Attachment 17: 10-good-2022-02-26_10-02-27.png
10-good-2022-02-26_10-02-27.png
Attachment 18: IMG_7113.JPG
IMG_7113.JPG
Attachment 19: IMG_7112.JPG
IMG_7112.JPG
Attachment 20: IMG_7111.JPG
IMG_7111.JPG
Attachment 21: IMG_7114.JPG
IMG_7114.JPG
Attachment 22: 2-adc-2022-02-26_14-45-37.png
2-adc-2022-02-26_14-45-37.png
Attachment 23: 2-good-2022-02-26_14-45-16.png
2-good-2022-02-26_14-45-16.png
Attachment 24: 2-correlation-2022-02-26_14-44-56.png
2-correlation-2022-02-26_14-44-56.png
Attachment 25: 2-id1-2022-02-26_14-48-13.png
2-id1-2022-02-26_14-48-13.png
Attachment 26: Screenshot_from_2022-02-26_17-18-11.png
Screenshot_from_2022-02-26_17-18-11.png
Attachment 27: Screenshot_from_2022-02-26_17-18-25.png
Screenshot_from_2022-02-26_17-18-25.png
  297   Sun Feb 27 06:23:42 2022 RSS TDCurrent status

Ring current ~6e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.44 uA

DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed

Online monitoring (WS 5): done

Attachment 1: 7-ey-2022-02-27_07-30-36.png
7-ey-2022-02-27_07-30-36.png
Attachment 2: 7-ex-2022-02-27_07-30-19.png
7-ex-2022-02-27_07-30-19.png
Attachment 3: 7-xy-total-2022-02-27_07-29-56.png
7-xy-total-2022-02-27_07-29-56.png
Attachment 4: IMG_7138.JPG
IMG_7138.JPG
Attachment 5: IMG_7137.JPG
IMG_7137.JPG
Attachment 6: IMG_7136.JPG
IMG_7136.JPG
  298   Sun Feb 27 06:58:51 2022 RSS TDCurrent status

7:59: 95K-->120K

8:06: 120K --> 95K

Ring current ~7e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.44 uA

DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed

Online monitoring (WS 5): done

Attachment 1: 8-xy-2022-02-27_08-10-15.png
8-xy-2022-02-27_08-10-15.png
Attachment 2: 8-ey-2022-02-27_08-09-46.png
8-ey-2022-02-27_08-09-46.png
Attachment 3: 8-ex-2022-02-27_08-09-29.png
8-ex-2022-02-27_08-09-29.png
Attachment 4: Screenshot_from_2022-02-27_07-16-30.png
Screenshot_from_2022-02-27_07-16-30.png
  299   Sun Feb 27 08:00:23 2022 RSS TDCurrent status

Ring current ~7.5e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.44 uA

DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed

Online monitoring (WS 5): done

Attachment 1: 9-xy-2022-02-27_09-00-57.png
9-xy-2022-02-27_09-00-57.png
Attachment 2: 9-ey-2022-02-27_09-00-03.png
9-ey-2022-02-27_09-00-03.png
Attachment 3: 9-ex-2022-02-27_08-59-48.png
9-ex-2022-02-27_08-59-48.png
  300   Sun Feb 27 09:00:09 2022 RSS TDCurrent status

10:00: 95K-->120K

10:08: 120K --> 95K

Ring current ~7e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.43 uA

DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed

Online monitoring (WS 5): done

Attachment 1: 10-xy-2022-02-27_10-02-27.png
10-xy-2022-02-27_10-02-27.png
Attachment 2: 10-ey-2022-02-27_10-02-04.png
10-ey-2022-02-27_10-02-04.png
Attachment 3: 10-ex-2022-02-27_10-01-46.png
10-ex-2022-02-27_10-01-46.png
Attachment 4: 10-ey-rate-2022-02-27_10-09-54.png
10-ey-rate-2022-02-27_10-09-54.png
Attachment 5: 10-ex-rate-2022-02-27_10-09-33.png
10-ex-rate-2022-02-27_10-09-33.png
Attachment 6: 10-ex-rate-95k-2022-02-27_10-13-33.png
10-ex-rate-95k-2022-02-27_10-13-33.png
Attachment 7: 10-ey-rate-95K-2022-02-27_10-17-09.png
10-ey-rate-95K-2022-02-27_10-17-09.png
  301   Sun Feb 27 10:00:07 2022 RSS TDCurrent status

Ring current ~9e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.43 uA

DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed

Online monitoring (WS 5): done

Attachment 1: 11-xy-2022-02-27_11-01-22.png
11-xy-2022-02-27_11-01-22.png
Attachment 2: 11-ey-rate2022-02-27_11-00-46.png
11-ey-rate2022-02-27_11-00-46.png
Attachment 3: 11-ex-rate-2022-02-27_11-00-27.png
11-ex-rate-2022-02-27_11-00-27.png
  302   Sun Feb 27 11:00:08 2022 RSS TDCurrent status

12:00: 95K-->120K

12:07: 120K --> 95K

Ring current ~6e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.43 uA

DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed

Online monitoring (WS 5): done

Attachment 1: 12-xy-2022-02-27_12-16-19.png
12-xy-2022-02-27_12-16-19.png
Attachment 2: 12-yrate-2022-02-27_12-15-42.png
12-yrate-2022-02-27_12-15-42.png
Attachment 3: 12-xrate-2022-02-27_12-15-03.png
12-xrate-2022-02-27_12-15-03.png
  303   Sun Feb 27 12:00:13 2022 RSS TDCurrent status

Ring current ~7.7e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.43 uA

DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed

Online monitoring (WS 5): done

Attachment 1: 13-xy-2022-02-27_13-01-36.png
13-xy-2022-02-27_13-01-36.png
Attachment 2: 13-yrate-2022-02-27_13-01-06.png
13-yrate-2022-02-27_13-01-06.png
Attachment 3: 13-xrate-Screenshot_from_2022-02-27_13-00-50.png
13-xrate-Screenshot_from_2022-02-27_13-00-50.png
  305   Sun Feb 27 13:34:24 2022 RSS TDCurrent status

14:33: 95K-->140K

14:44: 140K --> 95K

Ring current ~6e7 particles/s

Merger, Tape server (WS3): 1414 kB/s writing ok

Leakage current (WS4): 3.43 uA

DAQ (WS2): temperature checked, clock status: ok, adc calibration: ok, white rabbit check: failed

Online monitoring (WS 5): done

  154   Fri Nov 12 08:54:11 2021 RSS ML + CB (remotely) NK AK NPFirst CARME baking attempt

07:50 Small leaks (near the motors and upper valve) were detected in the tent which were covered with Al foil.

08:10 ML changed the baking temperature to 120 degrees.

09:40 Since the bottom of CARME is cold, due to uneven distribution of heat, baking is stopped.

13:00 Tent was slightly opened from the sides so that the heat can escape.

13:15 NK mounted three 200 W (see red labels in the picture below) and one 40 W (see the yellow label in the picture below) heating jacket on four CF100 flanges. Power cables and thermocouples were taken care of by AK.

14:00 Tent was closed.

14:00-17:00 ML started baking at temperature 80 degrees to check the heat distribution in the tent. Baking was then stopped and will start from Monday.

Attached - thermocouple temperatures (now correct)

Attachment 1: Capture.PNG
Capture.PNG
Attachment 2: 200W_heaters.svg
200W_heaters.svg
Attachment 3: 40W_heater.svg
40W_heater.svg
ELOG V3.1.4-unknown