AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 14 of 38  ELOG logo
ID Date Authordown Subject
  347   Tue Mar 1 12:33:21 2022 MS, SHBcheck

'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': no change

  349   Tue Mar 1 14:01:01 2022 MS, SHBcheck

'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' : no change

  284   Fri Feb 25 16:01:04 2022 MS, PJWcheck

        

'Check Clock Status': Clock status test result: Passed 5, Failed 0

'Check ADC Calibration' : Calibration test result: Passed 5, Failed 0

'Check the White rabbit decoder status':

Base         Current     Difference
aida01 fault      0xab60 :      0xab7f :      31  
aida02 fault      0x88d3 :      0x88f2 :      31  
aida03 fault      0x23aa :      0x23c9 :      31  
aida04 fault      0x15d7 :      0x15f6 :      31  
aida05 fault      0x2f03 :      0x2f0c :      9  
White Rabbit error counter test result: Passed 0, Failed 5

 

histograms was reset.

  285   Fri Feb 25 17:48:22 2022 MS, PJWcheck

'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes

 

  286   Fri Feb 25 19:20:22 2022 MS, PJWcheck

'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status'  no changes

 

  642   Sun Jun 16 19:01:30 2024 ML, EMRun 80

20:00

Ecooler setpoint 246.8

Readout 246.25

Collector current 4.3

Target density ~5.3E11

Beam intensity 7E7 ions

  73   Tue Sep 21 08:20:39 2021 MLCARME installations

 

Quote:

Ion pump, RGA and additional gauge installed on the chamber.

Our gauge is the one mounted above the NEG feedthrough, Michael's gauge is mounted below the feedthrough. Ion pump too large to install on the top of the vessel, sufficient room on flange immediately next to this top flange.  

Baking frame assembled around chamber, all required components fit within the baking volume. Insulation on baking tray and heaters set up and connected to pi controller. 

Pumpdown begun at 16:30. Turbopump on at 16:40. Unable to reach the required pressure for the hot cathod gauge before leaving the lab ~18:10. Suggests possible leak, pressure and leak check tomorrow morning.

MACOR strain relief and plastic strain relief tested in edinburgh compared (see image). MACRO hole size is 2x bigger than the test piece, suggests mix up between radius and diameter for MACOR strain reliefs. 

Vacuum group confirmed temperature limits for the RGA of 200°C without the electronics removed and 80°C with electronics installed.

  441   Wed Sep 13 15:00:39 2023 MLVacuum and Heater temperature plots from Grafana

Attached are the plotted curves from vacuum and heater temperature (actual and set values from ISOHEAT controllers) during the bakeout process. Channel assignment as per post 433.

  696   Tue May 27 12:49:48 2025 MLIon beam / electron beam settings so far.

Screenshots and ParamModi settings export attached.

  252   Wed Feb 23 06:58:19 2022 Laszlo, ThanassisCurrent status

08:00
Temps OK
System Check OK
White Rabbit fail diff: 99
Write Speed: ~1.0Mb/s
Leakage Current: ~3.47uA
Cryo Temp = 129.2K setpoint (unchanged)
Pressures stable

AVG Pressures:
YR07: 2.06e-10mbar
YR08: 2.71e-9mbar
YR09: 1.06e-9mbar (up from previous check)
YR10: 1.78e-10mbar

  253   Wed Feb 23 07:58:38 2022 Laszlo, ThanassisCurrent status

09:00
Temps OK
System Check OK
White Rabbit fail diff: 101
Write Speed: ~1.2Mb/s
Leakage Current: ~3.47uA
Cryo Temp = 129.2K setpoint (unchanged)
Pressures stable

AVG Pressures:
YR07: 1.88e-10mbar
YR08: 2.28e-9mbar
YR09: 9.15e-10mbar
YR10: 1.52e-10mbar

  254   Wed Feb 23 08:58:30 2022 Laszlo, ThanassisCurrent status

10:00
Temps OK
System Check OK
White Rabbit fail diff: 102
Write Speed: ~1.2Mb/s
Leakage Current: ~3.47uA
Cryo Temp = 129.2K setpoint (unchanged)
Pressures stable

AVG Pressures:
YR07: 1.93e-10mbar
YR08: 2.64e-9mbar
YR09: 1.13e-9mbar
YR10: 1.55e-10mbar

  255   Wed Feb 23 09:50:19 2022 Laszlo, ThanassisMoving detector in

We are moving the detector in run 56

  256   Wed Feb 23 10:56:06 2022 Laszlo, ThanassisCurrent status

11:55
Temps OK
System Check OK
White Rabbit fail diff: 102
Write Speed: ~1.2Mb/s
Leakage Current: ~3.47uA
Cryo Temp = 129.2K setpoint (unchanged)
Pressures stable

AVG Pressures:
YR07: 1.99e-10mbar
YR08: 2.6e-9mbar
YR09: 1.03e-9mbar
YR10: 1.7e-10mbar

  630   Fri Jun 14 14:46:54 2024 LC, JM, CB, TD, USRun 71 - beam on target

15:45

New run 71 - beam on target with definite target overlap [coasting]

Cooler voltage setpoint 247.3 V.

FC20 read value 246.75 V.

Right arm at 64.60 mm

Left arm IN at 36.54 mm18:00

FakeMotion script running

horizontal beam position 1.0 mm (new beam target overlap)

vertical beam position  -5mm

Beam intensity 7.0e+7 particles.

Target density ~4e11 at/cm2

Target temperature is 36.6 K. Values of E1 is 820 Hz, 2.6A, 1.4e-1 mbar

16:36

No difference observed between bunched and coasting

See attached screenshots to compare to previous run

Saw an increase in the data rate to disk ~ 2000 kB/s. On spectrum browser we saw aida15 had HEC reading hot. ASIC check on aida 15 resolved issue

 

18:00

Beam intensity 6e+7 particles.

Target density ~6e11 at/cm2

Target temperature is 36.6 K. Values of E1 is  820 Hz, 2.7 A, 1.5e-1 mbar

Aida03 detector temperature is 66 degree.

 

20:00

Beam intensity 6e+7 particles.

Target density ~6e11 at/cm2

Target temperature is 36.6 K. Values of E1 is  820 Hz, 2.7 A, 1.6e-1 mbar

Aida03 detector temperature is 63 degree. Screenshot is attached.

21:00

arget densityis dropped drastically. A temperature is ncreased signifiantly.

Beam intensity 6e+7 particles.

Target density ~2.7e9 at/cm2

Target temperature is 9 K. Values of E1 is  820 Hz, 2.7 A, 4.2e-2mbar

Aida03 detector temperature is 63 degree. Screenshot is attached.

 

  692   Mon May 26 18:37:17 2025 LC, AG, LB, SNRun 21

Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data taking condititon: beam is ok, target density is 1.1e12 cm-2, detectors are moving in-out periodically.

Cooler voltage setpoint 1105.7 V.

Beam energy = 1.95 MeV/u

Right arm at 19.80 mm

Left arm IN at 77.56 mm (OUT 32.53 mm)

vertical beam position 0.0 mm

horizontal beam position  -3.5mm

Beam intensity 2.2e+7 particles.

Target density ~1.1e12 at/cm2

Target temperatures: T1=31.5 K T2=35.2 K

Beam cycle set to 10 seconds.

All check are Ok!

21:44

All check are Ok!

23:10

Data rate to disk ~300 kB/sec

All checks OK

ADC disk Items #6 and ADC data items screenshots - attachments 5 and 6

Target density has dropped slightly to 7e11 at/cm2. This is fine with lithium due to beam lifetime constraints.

00:43

All checks OK

01:52

All checks are OK,

Attached spectra (attachment 7 and 8).

target pressure seems to be back at ca. 1E12 at/cm2

3:27

All checks good.

target pressure went down to 5E11 at/cm2 for a while, then back up to ca. 9E11 at/cm2.

4:49

All checks good

Rates higher on aida10 and aida4 (see attachment 9), monitoring. It is not consistently high but for example aida10 goes 222->20000->300->11000. It seems to follow the detector movement (higher rates when detector are IN)

Data rate to disk ~370kB/s.

Spectra attached in 10-11.

5:11

Still flickering. Attachment 12 with rates.

Data rate to disk around ~400 kB/s

 

05:30

DAQ has crashed. All statistics on aida read zero. No data through the merger or tape server.

Stopped tape server and then Run control STOP. Most FEEs did not respond to the command and continued to read going and some undefined. Reset aida servers and reloaded webpages. Same status. Have to power cycle.

  694   Tue May 27 05:24:05 2025 LB,SN, L. Cs. P. J. W.Run 22, 23 - 1.95 MeV/A

27/05/2025 ca. 6:00

We start a new run: beam is ok, target density ok, detectors are moving in-out periodically.

Cooler voltage setpoint  1105.7 V

Attachment 8 - beamcalc with actual values

Next entry - beamcalc with set values

 

Right arm at 19.80 mm

Left arm IN at 77.56 mm (OUT 32.53 mm)

vertical beam position 0.0 mm

horizontal beam position  -3.5mm

Beam intensity 1.7e+7 particles.

Target density ~6e11 at/cm2

Target temperatures: T1=31.5 K T2=35.2 K

Beam cycle set to 10 seconds.

All check are Ok!

6:30

Noticed a small spike in all leakage currents, see attachment 1

6:50

all checks ok!

 

07:40

All checks are Ok!

Aida 10 shows sometimes higher statistics.

 

09:02

All checks are Ok!

Aida 10 shows sometimes higher statistics.

 

10:00

Checks OK.

Compression works OK.

Moved to run 23. Now moving RIGHT hand side detectors instead of LEFT hand side.

Motion 37.96 mm -> 83.69 mm

Left arm stationary at 18.86 mm

Planning to change energy around lunch.

 

11:35

Parameters are OK! Tragte density dropped down a bit: ~6e11 at/cm2

 

12:35

Parameters are OK! Tragte density dropped down a bit: ~1e12 at/cm2

 

13:10

Starting beam energy change. Detectors OUT.

  604   Sat Jun 8 20:32:17 2024 LB, JMRun 52 - beam on target

New run 52 with:

Electron cooler setpoint 244.2 V

Electron cooler read 243.66 V

Collector current 4.3 uA

Right arm at 64.60 mm

Left arm IN at 36.54 mm

Target 2E11 fluctuating

Injection ca. 5E7

 

22;00

Detectors moved out while HKR plays with the beam injection to improve its stability

22;56

All system checks good. Detectors still out. Stats in attachment 1

23:08

HKR still has to call, but I have put detectors back in since they are only operating on injection.

Noticed that from time to time the target density still sparks to E12, and this corresponds to when the temperature drops.

23:42

HKR called back, they found the problem and fixed it. Beam seems more stable, with injections at ca. 5E7

23:50

DSSD0 high stats, cycled the motors to clear them.

00:18

All system checks are fine. Attachment 2-3 with stats and a spectrum

00:38

Spikes in the target got more frequent. Increased temperature to 30.5K and monitor if it helps stabilizing it.

01:52

All checks OK. Target behaving, density 5-8E11.

Attachments 4-5

03:10

System checks OK.

Target consistent

Some beam outages which were quickly fixed by HKR

05:03

System checks OK.

Target consistent

07:00

Lost beam. Detectors moved out

Will likely end run once beam is back and change energy. Do not use data past 7 am

All system checks OK

  702   Thu May 29 18:04:47 2025 LB, CB, PMH, JMRun 32,33,34

Oven temperature increased, current up to 3.5E7 pps.

Found beam-target overlap setting horizontal bump in RO9 to -2.5mm.

Target T1 30.5K, density increasing to 2.6E11 at/cm2.

19:08 Run 32 start

Moving left detectors (79.69->34.66mm).

Beam energy 1.85 MeV/u nominal

Electron cooler actual values: voltage 1.051 kV,  current 0.013215 uA, [voltage divider G35 1.0504 kV]

Stopped run, beam was still in bunch mode.

19:15 Run 33 start

All checks Ok.

Target at 3E11 at/cm2

Attachment 1-2 with rates and temperatures

 

20:20

Target density 3.4E11 at/cm2. Beam around 2.2-3.6E7 pps.

Checks ok! Spectra attached in att.3.

21:25

all good. Target density 4E11 at/cm^2

22:24

All checks are OK

Noted some variability in the injection intensity. For 15 minutes about half of shots were below 1e7. Perhaps some variability due to end of lithium in oven or increased temperture. 

Beam calc with read values - Attachment 4

01:30

All checks OK. Injection intensity has stabilised ~2E7

Target density is stable ~4e11 at/cm2

02:44

Suddenly see very high rates in DSSD4. Detector had tripped. Tried to re-bias but kept tripping.

Set to 70V, leakage current is about 17uA but fluctuates quite wildly. Set to 50V and leakage current is about 6uA but again has wild fluctuations. Not sure of the cause, this detector is not moving and is far from the beam.

Decided to turn detector off to try and protect it. We can  re-bias and monitor in the day tomorrow when we do not have beam on target.

This detector has tripped previously but was able to be re-biased at the time. See attachments 5 and 6 for the detector leakage currents.

New Run started R34.

Same conditions as before. DSSD4 turned off. To stop crap writing to disk I have set the corresponding FEEs to the MEC.

In principle we do not need this detector now as it is not moving to see the reaction.

Note I also observed in the system messages we semi regularly get a DHCP request from aida11. It seems to be functioning fine as I see the pulser signal in the spectrum browser. May be worth following up on at a later date. See attachment 7

All other checks OK

Data rate is now ~140 kB/sec

03:15

Tried to bias DSSD4 again. Leakage currents appear fine again.

Left for 5 minutes to gauge stability -> seems fine.

03:22

Have returned aida13, 14, 15, 16 back to LEC.  Maintaing the same run (34)

Scratch that. 03:27 detector tripped again. Will just leave it off tonight. Turned those FEEs back to MEC.

06:00

I have quickly looked at Run 33. We clearly see the 7Be again in both detectors. Locus on detector much smaller than at higher energies. 

All checks OK

07:07

Run stopped, switching to deuterium.

Detectors moved out

Shutter for gas target off.

Moved to next run -> no storage mode.

  594   Thu Jun 6 16:23:10 2024 LB CB JMRun 39 - Run 40 15N

Started run 39.

 

We have the 15N+ beam with 426 keV/nucleon. We see a peak in detector top left (mostly) and bottom right, at 4600 keV. We think it is the beam (nominally 6400 keV) after going through silicon dead layer, which however seems to be thicker than expected (expected 0.7 um, but given 1.4 MeV/um energy loss it seems to be > 1 um).

To understand what was going on we first played with detector and beam position.

At 17:28 detectors are fully out, while we are playing with the electron cooler to try to remove this beam halo hitting the detector.

 

Detector DSSD0 top left periodically seems to get noisier (statistics up to >2E5) and we need to move the detector in and out to go back to normal operations.

 

------------------

The beam halo in top left detector, as the detector gets moved in, gets elongated in the y direction instead of the x direction, as expected and previosuly observed.

Run 40 started.

18:36

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

Attachments 1-4

19:43

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

Attachments 5-8

21:15

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

Attachments 9-11

 

00;25

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

-----------------------------------

Movements and observation in xy plot:

- Move right servo in by 20 mm and we see the halo in the top right moving accordingly (attachment 12)

-Move right pneumatic in, saw big increase on bottom right (attachment 13)

-moved beam position down vertical -6 mm and we see reduced beam spot on top left and more on bottom left

-----------------------------------

Beam - target overlap:

We have yet to obtain an overlap

We cannot do this using the beam lifetime as from beam calc the lifetime from the ring is comparable to the lifetime with a target of 1e11 at/cm2

We have tried using Rutherford. However, we will have to move the detectors IN further as the Rutherford peaks at ~3.8 deg.

Possibly we may require other overlap detections from the ring?

I also think the beam requires some optimisation, electron cooler voltage seems to be fluctuating a lot and we see some features on the detectors when moving the beam / detectors as mentioned above.

 

02:25

The beam intensity has decreased signficantly (by about a factor of five) since about an hour. Operators tried different things, also consulted with Frank Herfurth, but they could not solve the problem.

There is no device which indicates malfunction.

So, during the rest of the night shift we will continue searching for the overlap (of the beam with the target) with the available beam intensity.

 

03:30

The beam intensity has improved without any aparent intervention.

We have started a new search for the overlap with 20 minute runs per horiznotal beam position.

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

 

03:40

After changing the horizontal beam position from 0 mm to 1 mm, the bottom right detector lost the Rutherford peak and its position spectrum looks to be half empty.

Moving it OUT and IN again did not change the situation.

There is no reason to think that this behavior has been caused by moving the beam by just 1 mm.

 

04:10

The beam intensity has dropped again without any apparent reason. So, at the moment we can not continue search for the overlap.

The bottom right detector seems to be counting normally again (also without any apparent reason). 

 

06:45

Merger OK, Tape server OK

ADC data item statistics looks as before. OK

FEE temperatures look OK

System checks OK

Leakage current stable

 

07:18

Lost beam again. Gleb is looking for it. Moved right detector out temporarily.

System wide checks as before.

Merger OK, Tape Server OK.

Temperatures OK.

Rates currently OK.

Leakage current decreasing.

 

10:10

Beam is back. Target is unusually thick at 3-5E11

Checking beam overlap.

Merger & tape server OK.

Temps OK.

Rates OK, a bit higher in 01 and 04.

ELOG V3.1.4-unknown