Tue Mar 1 12:33:21 2022, MS, SHB, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': no change |
Tue Mar 1 14:01:01 2022, MS, SHB, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' : no change |
Fri Feb 25 16:01:04 2022, MS, PJW, check 7x
|
'Check Clock Status': Clock status test result: Passed 5, Failed 0
'Check ADC Calibration' : Calibration test result: Passed 5, Failed 0 |
Fri Feb 25 17:48:22 2022, MS, PJW, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes
|
Fri Feb 25 19:20:22 2022, MS, PJW, check 11x
|
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' no changes
|
Sun Jun 16 19:01:30 2024, ML, EM, Run 80
|
20:00
Ecooler setpoint 246.8
Readout 246.25 |
Tue Sep 21 08:20:39 2021, ML, CARME installations
|
Quote:
Ion pump, RGA and additional gauge installed on the chamber. |
Wed Sep 13 15:00:39 2023, ML, Vacuum and Heater temperature plots from Grafana    
|
Attached are the plotted curves from vacuum and heater temperature (actual and set values from ISOHEAT controllers) during the bakeout process. Channel
assignment as per post 433. |
Tue May 27 12:49:48 2025, ML, Ion beam / electron beam settings so far.    
|
Screenshots and ParamModi settings export attached. |
Wed Feb 23 06:58:19 2022, Laszlo, Thanassis, Current status 11x
|
08:00
Temps OK
System Check OK |
Wed Feb 23 07:58:38 2022, Laszlo, Thanassis, Current status 10x
|
09:00
Temps OK
System Check OK |
Wed Feb 23 08:58:30 2022, Laszlo, Thanassis, Current status 10x
|
10:00
Temps OK
System Check OK |
Wed Feb 23 09:50:19 2022, Laszlo, Thanassis, Moving detector in
|
We are moving the detector in run 56 |
Wed Feb 23 10:56:06 2022, Laszlo, Thanassis, Current status 10x
|
11:55
Temps OK
System Check OK |
Fri Jun 14 14:46:54 2024, LC, JM, CB, TD, US, Run 71 - beam on target   
|
15:45
New run 71 - beam on target with definite target overlap [coasting]
Cooler voltage setpoint 247.3 V. |
Mon May 26 18:37:17 2025, LC, AG, LB, SN, Run 21 12x
|
Run 21 running
26/05/2025 19:42 p.m.
We start a new run with real data taking condititon: beam is ok, target density is 1.1e12 cm-2, detectors are moving in-out periodically. |
Tue May 27 05:24:05 2025, LB,SN, L. Cs. P. J. W., Run 22, 23 - 1.95 MeV/A 8x
|
27/05/2025 ca. 6:00
We start a new run: beam is ok, target density ok, detectors are moving in-out periodically.
Cooler voltage setpoint 1105.7 V |
Sat Jun 8 20:32:17 2024, LB, JM, Run 52 - beam on target    
|
New run 52 with:
Electron cooler setpoint 244.2 V
Electron cooler read 243.66 V |
Thu May 29 18:04:47 2025, LB, CB, PMH, JM, Run 32,33,34 7x
|
Oven temperature increased, current up to 3.5E7 pps.
Found beam-target overlap setting horizontal bump in RO9 to -2.5mm.
Target T1 30.5K, density increasing to 2.6E11 at/cm2. |
Thu Jun 6 16:23:10 2024, LB CB JM, Run 39 - Run 40 15N 15x
|
Started run 39.
We have the 15N+ beam with 426 keV/nucleon. We see a peak in detector top left (mostly) and bottom right, at 4600 keV. We think it is the beam |