AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 14 of 38  ELOG logo
Entry  Tue Mar 1 12:33:21 2022, MS, SHB, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status': no change
Entry  Tue Mar 1 14:01:01 2022, MS, SHB, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' : no change
Entry  Fri Feb 25 16:01:04 2022, MS, PJW, check 7x
        

'Check Clock Status': Clock status test result: Passed 5, Failed 0

'Check ADC Calibration' : Calibration test result: Passed 5, Failed 0
Entry  Fri Feb 25 17:48:22 2022, MS, PJW, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status' - no changes

 
Entry  Fri Feb 25 19:20:22 2022, MS, PJW, check 11x
'Check Clock Status', 'Check ADC Calibration' and 'Check the White rabbit decoder status'  no changes

 
Entry  Sun Jun 16 19:01:30 2024, ML, EM, Run 80 
20:00

Ecooler setpoint 246.8

Readout 246.25
    Reply  Tue Sep 21 08:20:39 2021, ML, CARME installations 
 




Quote:



Ion pump, RGA and additional gauge installed on the chamber.
Entry  Wed Sep 13 15:00:39 2023, ML, Vacuum and Heater temperature plots from Grafana Screenshot_2023-09-13_15-56-34.pngScreenshot_2023-09-13_15-58-06.pngScreenshot_2023-09-13_15-59-37.pngScreenshot_2023-09-13_15-59-01.pngScreenshot_2023-09-13_15-58-31.png
Attached are the plotted curves from vacuum and heater temperature (actual and set values from ISOHEAT controllers) during the bakeout process. Channel
assignment as per post 433.
Entry  Tue May 27 12:49:48 2025, ML, Ion beam / electron beam settings so far. 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt
Screenshots and ParamModi settings export attached.
Entry  Wed Feb 23 06:58:19 2022, Laszlo, Thanassis, Current status 11x
08:00
Temps OK
System Check OK
Entry  Wed Feb 23 07:58:38 2022, Laszlo, Thanassis, Current status 10x
09:00
Temps OK
System Check OK
Entry  Wed Feb 23 08:58:30 2022, Laszlo, Thanassis, Current status 10x
10:00
Temps OK
System Check OK
Entry  Wed Feb 23 09:50:19 2022, Laszlo, Thanassis, Moving detector in 
We are moving the detector in run 56
Entry  Wed Feb 23 10:56:06 2022, Laszlo, Thanassis, Current status 10x
11:55
Temps OK
System Check OK
Entry  Fri Jun 14 14:46:54 2024, LC, JM, CB, TD, US, Run 71 - beam on target  Screenshot_from_2024-06-14_16-35-44.pngScreenshot_from_2024-06-14_16-36-06.pngScreenshot_from_2024-06-14_16-36-28.pngScreenshot_from_2024-06-14_19-49-02.png
15:45

New run 71 - beam on target with definite target overlap [coasting]

Cooler voltage setpoint 247.3 V.
Entry  Mon May 26 18:37:17 2025, LC, AG, LB, SN, Run 21 12x
Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data taking condititon: beam is ok, target density is 1.1e12 cm-2, detectors are moving in-out periodically.
Entry  Tue May 27 05:24:05 2025, LB,SN, L. Cs. P. J. W., Run 22, 23 - 1.95 MeV/A 8x
27/05/2025 ca. 6:00

We start a new run: beam is ok, target density ok, detectors are moving in-out periodically.

Cooler voltage setpoint  1105.7 V
Entry  Sat Jun 8 20:32:17 2024, LB, JM, Run 52 - beam on target Screenshot_from_2024-06-08_22-56-26.pngScreenshot_from_2024-06-09_00-17-44.pngScreenshot_from_2024-06-09_00-18-46.pngScreenshot_from_2024-06-09_01-50-54.pngScreenshot_from_2024-06-09_01-51-27.png
New run 52 with:

Electron cooler setpoint 244.2 V

Electron cooler read 243.66 V
Entry  Thu May 29 18:04:47 2025, LB, CB, PMH, JM, Run 32,33,34 7x
Oven temperature increased, current up to 3.5E7 pps.

Found beam-target overlap setting horizontal bump in RO9 to -2.5mm.

Target T1 30.5K, density increasing to 2.6E11 at/cm2.
Entry  Thu Jun 6 16:23:10 2024, LB CB JM, Run 39 - Run 40 15N 15x
Started run 39.

 

We have the 15N+ beam with 426 keV/nucleon. We see a peak in detector top left (mostly) and bottom right, at 4600 keV. We think it is the beam
ELOG V3.1.4-unknown