ID Date Authordown Subject Text Attachments
  347   Tue Mar 1 12:33:21 2022 MS, SHBcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status': no change
 11x 
  349   Tue Mar 1 14:01:01 2022 MS, SHBcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status' : no change
 11x 
  284   Fri Feb 25 16:01:04 2022 MS, PJWcheck        

'Check Clock Status': Clock
status test result: Passed 5, Failed 0
 7x 
  285   Fri Feb 25 17:48:22 2022 MS, PJWcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status' - no changes
 11x 
  286   Fri Feb 25 19:20:22 2022 MS, PJWcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status'  no changes
 11x 
  642   Sun Jun 16 19:01:30 2024 ML, EMRun 8020:00

Ecooler setpoint 246.8

Readout 246.25
  
  73   Tue Sep 21 08:20:39 2021 MLCARME installations 




  
  441   Wed Sep 13 15:00:39 2023 MLVacuum and Heater temperature plots from GrafanaAttached are the plotted curves from vacuum
and heater temperature (actual and set values
from ISOHEAT controllers) during the bakeout
 Screenshot_2023-09-13_15-56-34.pngScreenshot_2023-09-13_15-58-06.pngScreenshot_2023-09-13_15-59-37.pngScreenshot_2023-09-13_15-59-01.pngScreenshot_2023-09-13_15-58-31.png 
  696   Tue May 27 12:49:48 2025 MLIon beam / electron beam settings so far.Screenshots and ParamModi settings export
attached.
 2025-05-27_13-46-30-866.png2025-05-27_13-47-04-130.png2025-05-27_13-47-23-173.png2025-05-27_13-47-52-384.png2025-05-27_13-50-26_YRT1_CRYRING_2025_Li_Marsh.C1.txt 
  252   Wed Feb 23 06:58:19 2022 Laszlo, ThanassisCurrent status08:00
Temps OK
System Check OK
 11x 
  253   Wed Feb 23 07:58:38 2022 Laszlo, ThanassisCurrent status09:00
Temps OK
System Check OK
 10x 
  254   Wed Feb 23 08:58:30 2022 Laszlo, ThanassisCurrent status10:00
Temps OK
System Check OK
 10x 
  255   Wed Feb 23 09:50:19 2022 Laszlo, ThanassisMoving detector inWe are moving the detector in run 56   
  256   Wed Feb 23 10:56:06 2022 Laszlo, ThanassisCurrent status11:55
Temps OK
System Check OK
 10x 
  630   Fri Jun 14 14:46:54 2024 LC, JM, CB, TD, USRun 71 - beam on target 15:45

New run 71 - beam on target with
definite target overlap [coasting]
 Screenshot_from_2024-06-14_16-35-44.pngScreenshot_from_2024-06-14_16-36-06.pngScreenshot_from_2024-06-14_16-36-28.pngScreenshot_from_2024-06-14_19-49-02.png 
  692   Mon May 26 18:37:17 2025 LC, AG, LB, SNRun 21Run 21 running

26/05/2025 19:42 p.m.

We start a new run with real data
 12x 
  694   Tue May 27 05:24:05 2025 LB,SN, L. Cs. P. J. W.Run 22, 23 - 1.95 MeV/A27/05/2025 ca. 6:00

We start a new run: beam is ok,
target density ok, detectors are moving in-out
 8x 
  604   Sat Jun 8 20:32:17 2024 LB, JMRun 52 - beam on targetNew run 52 with:

Electron cooler setpoint
244.2 V
 Screenshot_from_2024-06-08_22-56-26.pngScreenshot_from_2024-06-09_00-17-44.pngScreenshot_from_2024-06-09_00-18-46.pngScreenshot_from_2024-06-09_01-50-54.pngScreenshot_from_2024-06-09_01-51-27.png 
  702   Thu May 29 18:04:47 2025 LB, CB, PMH, JMRun 32,33,34Oven temperature increased, current up
to 3.5E7 pps.

Found beam-target overlap setting
 7x 
  594   Thu Jun 6 16:23:10 2024 LB CB JMRun 39 - Run 40 15NStarted run 39.

 

We have the 15N+ beam with 426
 15x 