AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 15 of 38  ELOG logo
ID Date Authordown Subject Text Attachments
  598   Fri Jun 7 22:33:13 2024 LBRun 45 - tests on beam-target overlapTried to double check beam-target overlap
by changing beam horizontal coordinate.

In the tablethe counts in the 4000-5200
 Screenshot_from_2024-06-07_23-11-06.pngScreenshot_from_2024-06-07_23-12-17.pngScreenshot_from_2024-06-07_23-32-22.pngScreenshot_from_2024-06-07_23-43-43.pngScreenshot_from_2024-06-07_23-50-54.png 
  599   Sat Jun 8 00:14:39 2024 LBRun 46 - background with beamRUN 46- started at 00:50

Horizontal beam position = 4.0
mm, vertical beam position = -5.0 mm.
 22x 
  699   Wed May 28 10:54:14 2025 LBRun 27Run 27 running

28/05/2025

(ignore 26 - in-between run)
 Screenshot_from_2025-05-28_15-45-13.pngScreenshot_from_2025-05-28_15-46-07.pngScreenshot_from_2025-05-28_15-48-27.pngScreenshot_from_2025-05-28_15-48-38.pngScreenshot_from_2025-05-28_15-49-09.png 
  271   Thu Feb 24 22:45:08 2022 Jordan, George, Rui-Jiu Chencheck- Motor fully out position.

SW3

- Merger OK
 14x 
  246   Wed Feb 23 00:54:17 2022 Jordan, GeorgeCurrent status02:04

Temps OK

Data Rate - ~1.1Mb/s
 2022-02-23_02-02-53extotal.png2022-02-23_02-02-00lowEnergyXYtot.png2022-02-23_01-59-14exRate.png 
  247   Wed Feb 23 01:56:59 2022 Jordan, GeorgeCurrent status02:56

Temps OK

write speed ~1.2Mb/s
 2022-02-23_03-01-54xyTotal.png2022-02-23_03-00-54exTotal.png2022-02-23_03-00-11exRate.png2022-02-23_03-10-45-aida1-1*L.png 
  248   Wed Feb 23 02:52:09 2022 Jordan, GeorgeCurrent status03:52

Temps OK

System Checks OK
 2022-02-23_03-58-03xyTotal.png2022-02-23_03-57-34exTotal.png2022-02-23_03-56-52exRate.png 
  249   Wed Feb 23 03:52:13 2022 Jordan, GeorgeCurrent status04:52
Pressure seems to be climbing a little
but still stable (just peaked at end of check)
 2022-02-23_04-58-19-XYtotal.png2022-02-23_04-57-17-Ex-total-hist.png2022-02-23_04-56-36-Ex-rate-hist.pngpressures-1hour.jpgpressure-6hours.jpg 
  250   Wed Feb 23 04:55:48 2022 Jordan, GeorgeCurrent status05:55
Temps OK
System Check OK
 2022-02-23_06-00-29xyTotal.png2022-02-23_05-59-36exRate.png2022-02-23_05-59-05exTotal.png 
  251   Wed Feb 23 06:00:25 2022 Jordan, GeorgeCurrent status07:00
Pressure Stable
Temps OK
 2022-02-23_07-06-36exRate.png2022-02-23_07-06-11exTotal.png2022-02-23_07-05-42xyTotal.png 
  628   Fri Jun 14 10:21:24 2024 JS, TDRun 68Frank has been tuning the beam since 08:00

detectors moved fully out

11:20
 9x 
  590   Wed Jun 5 08:34:04 2024 JM. DB, PCTarget nozzle change09:30

Target density has not improved
despite efforts last night. Mid 10 - low
  
  516   Thu Feb 15 12:40:52 2024 JM. CB, AR, ABRun30 - uncooled beam on targetRun started 13:40

Target density 4.3e11, Beam injection
is ~1e7, Pressure in the ring is ~1e-10 mbar.
 29x 
  205   Thu Feb 17 15:09:40 2022 JM,CB,SDAlpha background run4416:09

 

Check Leakage current: (see attachment
 8x 
  565   Fri May 31 06:01:55 2024 JM, TY, PW, EM, CBRun 12 - beam on target07:00

Run 12 started. D+ beam is incident
on the target at 1.5 MeV
 12x 
  185   Thu Feb 3 22:05:33 2022 JM, TD, OH(remotely)Bias update and grounding9:30 Bias remained stable overnight - 60V
2.95 uA.

10:00 No grounding attached initailly.
  
  186   Fri Feb 4 09:53:48 2022 JM, TD, OH (remotely)Alpha spectra overnightDAQ was left running last night from 19:30.
Detector bias 80V with a leakage current
~3.4 uA. Pulser OFF.
 8x 
  167   Mon Jan 10 20:52:53 2022 JM, TD, OHBaking tent removed, VI testsBaking tent, frame and trays fully
removed from CARME chamber. Removal of baking
frame required removing air lines from upper
 20220110_175547.jpg20220110_175811.jpgvi-curve.png 
  486   Fri Feb 2 08:59:36 2024 JM, TD, CBRun1 start - pulser widths spreadsheetCurrent pulser widths excel spreadsheet attached

09.58 DSSSD bias OK - attachment 1 
 20x 
  19   Wed Sep 23 13:34:32 2020 JM, TDWednesday 23 September
Connected Leybold Ionivac IE514 to Leybold
Combivac CM52 Vacuum Gauge Controller
 20200923_170441.jpg20200923_170455.jpg20200923_170415.jpg20200923_161415.jpg20200923_161402.jpg 
ELOG V3.1.4-unknown