|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
CARME, Page 19 of 38 |
 |
|
Tue Feb 22 10:06:50 2022, RSS, OF, ML, PMT channel
|
Fri May 31 21:53:20 2024, CB EM, JM,EM AB, Overnight beam tests 17x
|
Wed Oct 6 09:39:59 2021, PB CB, Original dirty assembly of CARME internals 7x
|
Wed Oct 13 15:16:12 2021, TD, Orientation of 2x 78 way D connector feedthroughs   
|
Sun Apr 6 11:40:48 2025, TD, Options DB reconstructed
|
Wed Feb 23 16:57:35 2022, CB, CN, Optimising motor motion
|
Wed Jan 31 09:49:38 2024, JM, TD, Optimising - Wednesday 31 25x
|
Thu May 30 06:00:51 2024, Yuri Nikos ..., Open the cave
|
Tue May 13 15:07:42 2025, JM, Online monitoring code  
|
Tue Jul 2 17:43:32 2024, TD, Offline analysis G22-201/R89 9x
|
Sun Jun 2 14:30:16 2024, TD, Offline analysis G22-201/R22_0 - R22_11 8x
|
Sat Jun 1 16:38:13 2024, TD, Offline analysis G22-201/R17 8x
|
Sat Jun 1 13:33:50 2024, TD, Offline analysis APR24/R3 (alpha background) 9x
|
Wed May 29 17:42:06 2024, TD, Offline analysis APR24/R2 (pulser walkthrough) 17x
|
Sun Nov 28 15:57:45 2021, CB (remotely), Nov 2021 temperatures
|
Sun Jun 25 09:41:06 2023, JM, TD, Normal turbo-pump operation 6x
|
Tue Feb 15 21:28:14 2022, JM, Noisy Channels 
|
Sat Aug 13 10:23:59 2022, JM, TD, Noise tests pt3 and pulser walk 15x
|
Fri Aug 12 09:06:57 2022, TD, JM, Noise tests pt2 30x
|
Thu Aug 11 09:25:13 2022, JM, TD, Noise tests 14x
|
|