Entry  Tue Apr 15 12:23:10 2025, JM, Leakage current / CARME issues 18x
14/04/25

Arrived at GSI in the afternoon.

Found that the coolant loop on aida08 had popped out which resulted in the high FEE temperatures observed (see attachment 1). Female swagelock
Entry  Wed Apr 16 08:20:05 2025, JM, Grounding  14x
09:00

Leakage currents this morning again appear to have lowered during the night. Current plot shows a day/night variation but I think the minimum
is decreasing ever so slightly.
Entry  Thu Apr 17 08:51:29 2025, JM, Grounding cont. 29x
09:00

Came in to see the bias for DSSD4 which has been fluctuating for the past few days had tripped during the night. From the gnuplot it looks like
it was fluctuating all night and just after midnight it went above 20uA and tripped.
Entry  Fri Apr 18 08:17:38 2025, JM, More testing 15x
09:10

Arrived at GSI. Leakage currents status same as before, DSSD4 is still fluctuating. DSSD1 and DSSD3 currents are definitely lower again compared
to previous days. I am convinced they are decreasing over time, whether this will be enough for our measurement....
Entry  Fri Apr 18 16:18:33 2025, JM, D+D BBN energies test 16x
D+D minimum energy Ecm = 150 keV which corresponds to Ed=150 keV/u or Ed=300 keV. Therefore we need a threshold below this.

Test 1 - Current status

Current slow comparator threshold is 0x64 (1 MeV). ADC data items rate in all FEEs is essentially zero with this threshold. (except aida03 and
Entry  Tue May 13 15:07:42 2025, JM, Online monitoring code Screenshot_from_2025-05-13_15-14-12.pngScreenshot_from_2025-05-13_15-14-38.pngScreenshot_from_2025-05-13_15-28-48.png
CARME_Sort histogramming has been updated to aid our understanding online.

> XY plots have been updated to reflect the true position of the beam relative to each detector. Online we will be able to layout in a grid
to reflect looking downstream in YR09 (see attachment 1)
Entry  Sat May 17 11:19:06 2025, JM, Shifter intructions 2025 
EMERGENCY SHUTDOWNS

1. CARME motors: Q key on keyboard while on workspace 1 of appc218 (right of this double-monitor setup)

2. Internal target:
Entry  Tue May 20 19:38:36 2025, JM, CARME restart 6x
19:00

Arrived at GSI.

We have 6Li1+ beam in the ring at 2 MeV/u. Injection is about 2.5e7 pps and lifetime with no target is about 40 seconds. We have injection every
Entry  Tue May 27 05:03:41 2025, JM, DAQ restart 7x
06:00

FEE modules power cycled.

No issues on power cycle restart.
Entry  Sat May 31 09:58:21 2025, JM, Run 38 10x
10:56

Run 38 started.

D+ beam deuterium target. D+ beam energy is 1.5 MeV/u. (beam calc calculation is 1.5160 MeV/u)
Entry  Wed Jun 4 00:10:39 2025, JM, Run 49 - beam only 6x
01:10

Gas target turned off via the shutter valve.

Run 49 started beam only background run.
Entry  Thu Jun 12 06:20:50 2025, JM, Run 68,69 - background Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png
07:20

Started a background run while the cave is open.

All ASIC settings remain unchanged, we just have no beam.
Entry  Mon Feb 28 10:55:48 2022, JG, US, Current status 8x
11:55

beam intensity at injection: 8e7 ions

Temperature setpoint = 110 k
Entry  Fri Jan 19 11:17:50 2024, JG, TD, Friday 19 January 18x

12.20 CARME IE514 4.1e-11mbar, ambient temperature 16.7 deg C
Entry  Wed Mar 6 10:47:11 2024, JG, TD, Wednesday 6 March - PEXARIA5 WR test temps.PNGstats_1.PNGstats_2.PNGwr_0949.PNG

Courtesy Nik Kurz, JG has installed a PEXARIA5 PCIe card adjacent to CARME - BuTIS single-mode fibre input
and HDMI output to root MACB input for distribution to the other MACBs and FEE64s.
Entry  Thu May 22 06:41:10 2025, JG, TD, R6 - R11 scrapers test / pulser walk 33x
07.00 

JG found target off (target data stopped c. 02.30 this morning) and beam off (not re-enabled from previous CRYRNG area entry - target related?) JG re-enables
Entry  Fri Jun 13 14:45:58 2025, JG, SS, JM, CB, EW, AR, Run 75 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt
 

90 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam - @ -12.5mm

We do not expect to see see Rutherford due to energy loss in the dead layer, using other particle detector for normalsiation.
Entry  Fri Jun 13 19:41:32 2025, JG, SHB, JM, AR, EW, OF, Run 77, 78, 79 17x
New run started - Run 77 after refilling LN2 dewar

Same settings as Run 75 & 76

The root histos have not been reset, i.e. they show combined statistics of run 75, 76 and 77.
Entry  Fri Jun 13 16:39:18 2025, JG, SHB, Run 76 7x
Same settings as run 75.

Detector 4 is biased at 100V and switched from MEC to LEC.

The root histos have not been reset, i.e. they show combined statistics of run 75 and 76.
Entry  Thu Feb 24 08:15:23 2022, JG, MS, check 13x
Beam is still beeing tuned. Target is off.

There is a problem with ADC calibration of aida5: see entry https://elog.ph.ed.ac.uk/CARME/268

 
ELOG V3.1.3-7933898