  673   Tue Apr 15 12:23:10 2025 JMLeakage current / CARME issues14/04/25

Arrived at GSI in the afternoon.

Found that the coolant loop on
 18x 
  674   Wed Apr 16 08:20:05 2025 JMGrounding 09:00

Leakage currents this morning again
appear to have lowered during the night.
 14x 
  675   Thu Apr 17 08:51:29 2025 JMGrounding cont.09:00

Came in to see the bias for DSSD4
which has been fluctuating for the past few
 29x 
  676   Fri Apr 18 08:17:38 2025 JMMore testing09:10

Arrived at GSI. Leakage currents
status same as before, DSSD4 is still fluctuating.
 15x 
  677   Fri Apr 18 16:18:33 2025 JMD+D BBN energies testD+D minimum energy Ecm = 150 keV which
corresponds to Ed=150 keV/u or Ed=300
keV. Therefore we need a threshold
 16x 
  683   Tue May 13 15:07:42 2025 JMOnline monitoring codeCARME_Sort histogramming has been updated
to aid our understanding online.

> XY plots have been updated
 Screenshot_from_2025-05-13_15-14-12.pngScreenshot_from_2025-05-13_15-14-38.pngScreenshot_from_2025-05-13_15-28-48.png 
  684   Sat May 17 11:19:06 2025 JMShifter intructions 2025EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  685   Tue May 20 19:38:36 2025 JMCARME restart19:00

Arrived at GSI.

We have 6Li1+ beam in the ring
 6x 
  693   Tue May 27 05:03:41 2025 JMDAQ restart06:00

FEE modules power cycled.

No issues on power cycle restart.
 7x 
  707   Sat May 31 09:58:21 2025 JMRun 3810:56

Run 38 started.

D+ beam deuterium target. D+ beam
 10x 
  718   Wed Jun 4 00:10:39 2025 JMRun 49 - beam only01:10

Gas target turned off via the shutter
valve.
 6x 
  739   Thu Jun 12 06:20:50 2025 JMRun 68,69 - background07:20

Started a background run while
the cave is open.
 Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png 
  328   Mon Feb 28 10:55:48 2022 JG, USCurrent status11:55

beam intensity at injection: 8e7
ions
 8x 
  476   Fri Jan 19 11:17:50 2024 JG, TDFriday 19 January
12.20 CARME IE514 4.1e-11mbar, ambient temperature
16.7 deg C
 18x 
  540   Wed Mar 6 10:47:11 2024 JG, TDWednesday 6 March - PEXARIA5 WR test
Courtesy Nik Kurz, JG has installed a PEXARIA5
PCIe card adjacent to CARME - BuTIS single-mode
 temps.PNGstats_1.PNGstats_2.PNGwr_0949.PNG 
  687   Thu May 22 06:41:10 2025 JG, TDR6 - R11 scrapers test / pulser walk07.00 

JG found target off (target data stopped
 33x 
  743   Fri Jun 13 14:45:58 2025 JG, SS, JM, CB, EW, ARRun 75 

90 keV/u beam on target, Target
overlap confirmed with lifetime measurement
 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt 
  745   Fri Jun 13 19:41:32 2025 JG, SHB, JM, AR, EW, OFRun 77, 78, 79New run started - Run 77 after refilling
LN2 dewar

Same settings as Run 75 & 76
 17x 
  744   Fri Jun 13 16:39:18 2025 JG, SHBRun 76Same settings as run 75.

Detector 4 is biased at 100V and
switched from MEC to LEC.
 7x 
  267   Thu Feb 24 08:15:23 2022 JG, MScheckBeam is still beeing tuned. Target is off.

There is a problem with ADC calibration
of aida5: see entry https://elog.ph.ed.ac.uk/CARME/268