AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 25 of 33  ELOG logo
Entry  Tue Feb 1 14:43:20 2022, JM, TD, Detector Bias, FEEs 22-02-01_15-03-56_aida03pulserADCspectra.png2022-02-01_15-14-07_aida03_pulser_DAQserver.png2022-02-01_15-22-23aida03_waveforms_pulser.png2022-02-01_15-28-45aida03_waveforms_pulser2.png2022-02-01_15-54-57rates_aidaALL.png
Entry  Mon Jan 31 08:58:38 2022, OH, TD, JM, centos server configuration 8x
Entry  Sat Jan 29 11:04:07 2022, JM, OH, Grounding and Pulser Silkscreen_Top.pdf
Entry  Thu Jan 27 21:33:40 2022, JM, OH, AIDA config files, remote access, motor test 20220127_101513.jpg
Entry  Thu Jan 27 15:24:02 2022, OH, JM, Access to Motors PI 
Entry  Thu Jan 27 15:19:18 2022, OH, JM, Enabling internet access on the carme-gsi server 
Entry  Thu Jan 27 14:04:34 2022, OH, JM, Remote access to CARME server 
Entry  Wed Jan 26 19:16:18 2022, JM, OH, Water cooling, FEE MAC address 20220126_162435.jpg20220126_162448.jpg20220126-142809.jpg
Entry  Sat Jan 15 15:38:25 2022, JM, OH, TD, FEE installation, cable management 20220114_104819.jpg20220114_105152.jpg20220114_105213.jpg20220115_133808.jpg20220115_133820.jpg
Entry  Sat Jan 15 11:28:10 2022, JM, Inventory 20220115_162649.jpg20220115_162712.jpg
Entry  Fri Jan 14 10:00:18 2022, TD, OH, JM, Friday 14 January 
Entry  Thu Jan 13 10:33:24 2022, JM, OH, TD, Adaptor Board misallignment 20220112_160951.jpg20220113_145105.jpg20220113_145147.jpg
Entry  Wed Jan 12 20:07:20 2022, JM, OH, TD, FEE holder installation 10x
Entry  Tue Jan 11 12:45:15 2022, TD, JM, OH, Coolant manifold installation + detector pin tests 20220111_113628.jpg20220111_113613.jpg20220111_111428.jpg
Entry  Mon Jan 10 20:52:53 2022, JM, TD, OH, Baking tent removed, VI tests 20220110_175547.jpg20220110_175811.jpgvi-curve.png
Entry  Tue Dec 7 09:39:59 2021, CB (remotely), Gate valves closed 
Entry  Tue Nov 30 10:49:43 2021, CB (remotely) GV, Gate valve opened vacplot24.png
Entry  Sun Nov 28 15:57:45 2021, CB (remotely), Nov 2021 temperatures 211128164424_temperatures.zip
Entry  Fri Nov 26 10:01:45 2021, CB (remotely) ML, Power cut in the CRYRING cave 
Entry  Wed Nov 24 12:08:08 2021, CB + ML OG, Ion pumps on vacplot24.pngvacplot.pngCARMEtemps.png
ELOG V3.1.4-unknown