AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 26 of 33  ELOG logo
Entry  Tue Nov 23 08:49:33 2021, CB + ML, NEG activation completed vacplot24.pngCARMEtemps.pngvacplot24-1.pngCARMEtemps-1.png
Entry  Mon Nov 22 08:06:01 2021, RSS CB + ML, NEG activation starts IMG_5674.JPGCARMEtemps.pngvacplot.png
Entry  Fri Nov 19 12:03:51 2021, CB RSS, Conditionings NEGs CARMEtemps.pngvacplot.png
Entry  Thu Nov 18 13:50:51 2021, CB RSS, Thermocamera images 14x
Entry  Thu Nov 18 12:29:50 2021, CB RSS, Conditioning D2000 NEGs vacplot.pngCARMEtemps.png
Entry  Wed Nov 17 07:12:22 2021, RSS CB + ML (remotely), CARME baking with tape continues 17 Nov 7x
Entry  Tue Nov 16 12:05:13 2021, CB RSS, CARME baking with tape continues CARMEtemps.png20211116_132048.jpg20211116_155138.jpg20211116_155857.jpg
Entry  Fri Nov 12 08:54:11 2021, RSS ML + CB (remotely) NK AK NP, First CARME baking attempt Capture.PNG200W_heaters.svg40W_heater.svg
Entry  Thu Nov 11 11:44:58 2021, RSS + ML OG + CB (remotely), CARME baking started IMG_5535.JPGIMG_5537.JPGIMG_5531.JPGIMG_5534.JPGIMG_5539.JPG
    Reply  Thu Nov 11 14:01:00 2021, AK, ML, Heater channel layouts 2020.11.05_Cryring-YR09-baking-layout.pdf
Entry  Wed Nov 10 18:38:16 2021, RSS TD + ML OG AK NK, CARME wrapped in heating tape IMG_5514(1).JPGIMG_5517(1).JPGIMG_5518.JPGIMG_5520.JPGIMG_5521(1).JPG
Entry  Wed Nov 10 18:24:12 2021, RSS, Thermocouple labelling labeling.JPG.svgLabelling.svgIMG_5512.JPG
Entry  Wed Nov 10 14:41:12 2021, TD RSS + CB (remotely), Wrapping CARME in heating tape 
Entry  Tue Nov 9 15:03:29 2021, RSS + OG, Burnt cables issues 7x
Entry  Mon Nov 8 17:19:02 2021, RSS + OG, Neg and ion cables connected IMG_5480.JPGIMG_5483.JPGIMG_5488.JPG
Entry  Sat Nov 6 14:21:10 2021, CB RSS, Preparation for bakeout tent mounting + to do for next week 
Entry  Fri Nov 5 12:27:11 2021, CB RSS + DR NP ML US, First pump down of YR09 20211105_131748.jpg20211105_135918.jpg20211105_135929.jpg20211105_140451.jpg20211105_150616.jpg
Entry  Wed Nov 3 16:39:01 2021, CB RSS + NP DR NK ML, Interaction chamber lifted in place 20211103_161553.jpg20211103_161813.jpg20211103_175457.jpg
Entry  Wed Nov 3 11:18:11 2021, CB RSS + DR NK ML, Leak closed 20211103_110244.jpg20211103_110414.jpg
Entry  Tue Nov 2 12:45:36 2021, CB + DR NK, Issues with CARME feet 20211102_134446.jpg
Entry  Mon Nov 1 14:48:16 2021, CB + ML DR, CARME opened 
ELOG V3.1.4-unknown