AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 27 of 28  ELOG logo
Entry  Wed Sep 30 08:10:36 2020, CB (remotely), First bake of CARME with pumps 19x
Entry  Mon Sep 28 13:04:27 2020, JM, Baking 20200928_081831.jpg20200928_130239.jpg
Entry  Sat Sep 26 09:31:46 2020, JM, CB (both remotely), Baking over weekend temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png
Entry  Fri Sep 25 12:58:33 2020, JM, Friday 25/09/20 Photos.zip
Entry  Thu Sep 24 10:04:58 2020, JM, TD, Thursday 24 September 20200924_152852.jpgPhotos.zip
Entry  Wed Sep 23 13:34:32 2020, JM, TD, Wednesday 23 September 20200923_170441.jpg20200923_170455.jpg20200923_170415.jpg20200923_161415.jpg20200923_161402.jpg
Entry  Wed Sep 23 13:34:04 2020, JM, Tuesday 22 September 
Entry  Mon Sep 21 09:51:57 2020, JM, CARME Status Graphs.zip
Entry  Fri Sep 18 10:28:57 2020, JM, CB(remotely), Baking status 20200918_1029_temps.png
Entry  Thu Sep 17 10:13:43 2020, JM, CB(remotely), Bakeout cooling and pumping of chamber Photos.zip20200917_1428_temp_last.png
Entry  Wed Sep 16 17:46:36 2020, JM, Pumping of Chamber Photos.zip
Entry  Wed Sep 16 08:52:03 2020, CB (remotely), Baking status 16-17 September 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png
Entry  Tue Sep 15 08:39:26 2020, CB (remotely), JM, Baking and Chamber status  20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png
Entry  Mon Sep 14 12:07:40 2020, JM, CB (remotely), Baking status 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png
Entry  Sun Sep 13 08:06:25 2020, CB (remotely), Baking over the weekend -2 20201309_0806_ctrl.png20201309_0806_plot.png
Entry  Sat Sep 12 08:38:52 2020, CB (remotely), Baking over the weekend 20200912_0839_ctrl.png20200912_0839_plot.png
Entry  Thu Sep 10 11:34:30 2020, TD, JM, Thursday 10 September  20200910_112152.jpg20200910_112211.jpgPhotos_(1).zip
Entry  Wed Sep 9 21:01:48 2020, JM, Neg Feedthroughs Photos.zip
Entry  Fri Sep 4 15:48:25 2020, JM, Bakeout test completed 191214004923_temperatures.txtBakeout1.png
Entry  Wed Sep 2 17:01:49 2020, JM, Bakeout started and valve installation Photos.zip
ELOG V3.1.4-unknown