  166   Tue Dec 7 09:39:59 2021 CB (remotely)Gate valves closedDry run complete.

YR09 section valves closed. Section
isolated. Manual valve between electron target
  
  165   Tue Nov 30 10:49:43 2021 CB (remotely) GVGate valve openedGSI vacuum division IE514 gauge connected.

Gleb reports gate downstream opened.
Vacuum goes up and recovers as expected.
 vacplot24.png 
  164   Sun Nov 28 15:57:45 2021 CB (remotely)Nov 2021 temperaturesAttached  211128164424_temperatures.zip 
  163   Fri Nov 26 10:01:45 2021 CB (remotely) MLPower cut in the CRYRING caveML reports power cut in CRYRING cave. Reasons
unknown. No effect on vacuum, but top valve
closed for safety reason. Ramping down temperature.
  
  162   Wed Nov 24 12:08:08 2021 CB + ML OGIon pumps onFound SIP power unit for D2000 #4 not functioning
correctly. Max current regardless of ion
element connected to.
 vacplot24.pngvacplot.pngCARMEtemps.png 
  161   Tue Nov 23 08:49:33 2021 CB + MLNEG activation completedFound temperatures and pressure stabilised
overnight. See attached.

12:00 Began activation of 3x UHV1400
 vacplot24.pngCARMEtemps.pngvacplot24-1.pngCARMEtemps-1.png 
  160   Mon Nov 22 08:06:01 2021 RSS CB + MLNEG activation starts08:20 Temperature of channels 1-3 and 5-6
were reduced to 120 degrees. Immediately
after, the conditioning of the NEGs was stopped
 IMG_5674.JPGCARMEtemps.pngvacplot.png 
  159   Fri Nov 19 12:03:51 2021 CB RSSConditionings NEGsIncreased conditioning temperature in D2000
#3 and 4 (behind detectors) to 150C from
130/140C. No appreciable change in temperature.
 CARMEtemps.pngvacplot.png 
  158   Thu Nov 18 13:50:51 2021 CB RSSThermocamera imagesUsed thermocamera provided by GSI beam
diagnostic division to take some pictures
of YR09. See attached.
 14x 
  157   Thu Nov 18 12:29:50 2021 CB RSSConditioning D2000 NEGsD2000 thermocouples report temperatures
around 100C (D2000 #1,2) and 120C (3,4).
1,2 are in the intermediate chamber, 3,4
 vacplot.pngCARMEtemps.png 
  156   Wed Nov 17 07:12:22 2021 RSS CB + ML (remotely)CARME baking with tape continues 17 NovCARME baking with heating tape continues

Left overnight at -

Ch1-3: 140 degrees
 7x 
  155   Tue Nov 16 12:05:13 2021 CB RSSCARME baking with tape continuesCARME baking with heating tape continues

Left overnight at 100C. Turned
up this morning at 9:00 to 120C.
 CARMEtemps.png20211116_132048.jpg20211116_155138.jpg20211116_155857.jpg 
  154   Fri Nov 12 08:54:11 2021 RSS ML + CB (remotely) NK AK NPFirst CARME baking attempt07:50 Small leaks (near the motors and
upper valve) were detected in the tent which
were covered with Al foil.
 Capture.PNG200W_heaters.svg40W_heater.svg 
  153   Thu Nov 11 14:01:00 2021 AK, MLHeater channel layoutsSchematic layout of heaters and channel
assignment attached. Table kindly provided
by AK. I hope the conversion from excel to
 2020.11.05_Cryring-YR09-baking-layout.pdf 
  151   Thu Nov 11 11:44:58 2021 RSS + ML OG + CB (remotely)CARME baking startedWith the help of OG, the baking tent was
built. MG started baking around 11:30 am
with a rate of 0.2 K/minute.
 IMG_5535.JPGIMG_5537.JPGIMG_5531.JPGIMG_5534.JPGIMG_5539.JPG 
  150   Wed Nov 10 18:38:16 2021 RSS TD + ML OG AK NKCARME wrapped in heating tapeHeating and electronic experts were in
CRYRING and were unhappy with the damaged
wire. Heaters were opened by OG, but no damage
 IMG_5514(1).JPGIMG_5517(1).JPGIMG_5518.JPGIMG_5520.JPGIMG_5521(1).JPG 
  149   Wed Nov 10 18:24:12 2021 RSSThermocouple labelling1. Detector

2. Chamber back

3. Strain relief
 labeling.JPG.svgLabelling.svgIMG_5512.JPG 
  147   Wed Nov 10 14:41:12 2021 TD RSS + CB (remotely)Wrapping CARME in heating tapeML reports that baking of the upstream section
(gas jet interaction chamber plus e-target)
has commenced - initially to 50 deg C to
  
  146   Tue Nov 9 15:03:29 2021 RSS + OGBurnt cables issuesUpper part of the frame was mounted. In
order to do so, the valve was closed, turbo
wire and hose were disconnected and then
 7x 
  145   Mon Nov 8 17:19:02 2021 RSS + OGNeg and ion cables connectedNeg and ion pump cables were labeled and
connected.

Kapton tape wrapped around the
 IMG_5480.JPGIMG_5483.JPGIMG_5488.JPG 