  114   Sat Oct 9 09:44:36 2021 CB RSSHeaters removed + motors testsRemoved thermocouples, heaters, RE72 modules
and leftover baking tent. Support octagon
removed except topmost part which requires
  
  113   Fri Oct 8 17:56:35 2021 CB RSSMotors testAttempted first motor test in XHV. Wired
and connected limit switches and string potentiometer.

Set up raspberry pi to control
 20211008_184731.jpg20211008_184731.jpg 
  112   Thu Oct 7 08:40:09 2021 CB RSSCARME in XHVCARME reached 9E-12 this morning

Ion pumps on
  
  111   Wed Oct 6 15:36:14 2021 CB RSSNeg activation tests -3Attempted to activate 2xUHV1400 connected
to bottom C4, channel #2 using P 200 W, t
rise 30 min, t hold 90 min.
  
  110   Wed Oct 6 09:47:30 2021 CB RSSNeg activation tests -2Attempted activating 2xUHV1400 connected to
top C4, channel #3 with P 300 W (450 C?),
t rise 30 min, t hold 90
  
  109   Wed Oct 6 09:39:59 2021 PB CBOriginal dirty assembly of CARME internalsPB found pictures of the original dirty assembly,
before screws and components were shipped
to DL.
 7x 
  108   Tue Oct 5 17:30:01 2021 CB RSSNEG activation testsFound D2000 #1 activated and at 250C (25W)

to prevent getting dirty when other NEGs
 20211005_131259.jpg20211005_171403.jpg20211005_161317.jpg 
  107   Tue Oct 5 11:44:11 2021 CB, TD SAES manuals & cable drawingsNEG power
SIP power
UHV1400 operating instructions
 8x 
  106   Mon Oct 4 20:30:46 2021 RSS JM CB (remotely)CARME baking status -21
Current temperature ~95 C (on manual
mode)
See plot and screen attached.

Current
pressure 2.86E-10
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
 Screenshot_from_2021-10-04_21-28-28.pngScreenshot_from_2021-10-04_21-29-37.png 
  105   Mon Oct 4 09:19:11 2021 JM RSSActivation of NEG elements9:30

Ion pumps de-gassed by switching
on and off multiple times. Large pressure
 IMG_4880.JPGIMG_4881.JPGIMG_4882.JPGIMG_4883.JPG 
  104   Mon Oct 4 06:34:58 2021 RSS JM CB (remotely)CARME baking status -20
Current temperature ~110 C (on manual
mode)
See plot and screen attached.

Current
pressure 3.20E-8
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
 Screenshot_from_2021-10-04_07-33-14.pngScreenshot_from_2021-10-04_07-34-14.png 
  103   Sun Oct 3 08:36:01 2021 RSS JM CB (remotely)CARME baking status -19
08:36
Current temperature ~132 C (on
manual mode RE72-1: 132 C, RE72-2: 130 C)
See
plot and screen attached.

Current pressure
 Screenshot_from_2021-10-03_09-33-30.pngScreenshot_from_2021-10-03_09-34-24.png 
  102   Sat Oct 2 22:14:14 2021 RSS JM CB (remotely)CARME baking status -18
Current temperature ~132 C (on manual
mode RE72-1: 132 C, RE72-2: 130 C)
See plot
and screen attached.

Current pressure
 Screenshot_from_2021-10-02_23-12-09.pngScreenshot_from_2021-10-02_23-13-16.png 
  101   Sat Oct 2 08:26:49 2021 RSS JM CB (remotely)CARME baking status -17
Current temperature ~132 C (on manual
mode RE72-1: 132 C, RE72-2: 130 C)
See plot
and screen attached.

Current pressure
 Screenshot_from_2021-10-02_09-25-40.pngScreenshot_from_2021-10-02_09-24-44.png 
  100   Fri Oct 1 21:47:51 2021 CB (remotely)CARME baking status -16Current temperature ~132 C (on manual mode
RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
 screen.pngTemps.png 
  99   Fri Oct 1 07:17:46 2021 RSS JMCARME baking status -15
Current temperature ~132 C (on manual
mode RE72-1: 132 C, RE72-2: 130 C)
See plot
and screen attached.

Current pressure
 Screenshot_from_2021-10-01_08-17-02.pngScreenshot_from_2021-10-01_08-16-41.png 
  98   Thu Sep 30 18:16:52 2021 RSS JMCARME baking status -14
Current temperature ~132 C (on manual
mode RE72-1: 132 C, RE72-2: 130 C)
See plot
and screen attached.

Current pressure
 Screenshot_from_2021-09-30_19-18-44.pngScreenshot_from_2021-09-30_19-18-08.png 
  97   Thu Sep 30 06:29:39 2021 RSS JMCARME baking status -13
Current temperature ~130 C (on manual
mode)
See plot and screen attached.

Current
pressure ~4.07E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
 Screenshot_from_2021-09-30_07-29-02.pngScreenshot_from_2021-09-30_07-28-09.png 
  96   Wed Sep 29 15:34:07 2021 RSS JMCARME baking status -12
Current temperature ~130 C (on manual
mode)
See plot and screen attached.

Current
pressure ~4.51E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
 Screenshot_from_2021-09-29_16-32-50.pngScreenshot_from_2021-09-29_16-31-48.png 
  95   Wed Sep 29 13:13:51 2021 JM RSS PB(remotely)Detector frame assembley29/9/21

We have opened the cleaned parts
for assembley of the moving detector frames.
 new_carrier_simple_holes.PDFScreenshot_20210929-110343_Telegram.jpg20210930_164625.jpg20210930_164650.jpg 