AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 28 of 28  ELOG logo
ID Date Author Subject Text Attachments
  5   Wed Sep 2 17:01:49 2020 JMBakeout started and valve installationInitial bakeout started which will run
until friday, temperature had reached 44
degrees when I left the lab. 
 Photos.zip 
  4   Wed Aug 19 16:44:39 2020 JMNeg InstallsInternal neg installs completed and electrically
checked. 
 Photos_(1).zip 
  3   Tue Aug 18 17:35:20 2020 TDSAES UHV1400 pin assignmentUsing a digital multimeter confirmed continuity
for SAES-supplied 
power cable (Amphenol (circular) 6-pin plug
 NEG_POWER_user_manual.pdf20200813_121944_(1).jpg20200813_134548.jpgRFKIT9904220_(2).pdfRFKIT9905220_(2).pdf 
  2   Tue Aug 18 11:26:26 2020 JMWeek ending Friday 14/08/20Week ending friday 14/08/20

CARME chamber securely mounted
upon aluminium frame and support skis. Neg-ion
 Photo.zip 
  1   Mon Aug 17 08:16:16 2020 TDCARME Elog
Test
  
ELOG V3.1.4-unknown