AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 2 of 28  ELOG logo
ID Date Author Subject Text Attachments
  530   Mon Feb 19 06:01:17 2024 SHB, JM, JGRun 42 morning shift07:00

Observed reduction in YR09 presure
over last few hours in ML online plot. Beam
 6x 
  529   Mon Feb 19 05:10:48 2024 TDRun 42 night shift contd.06.03 DAQ continues file G22-86/R42_32

      DSSSD bias & leakage current - attachments
 6x 
  528   Sun Feb 18 22:03:56 2024 TDRun 42 night shift
23.03 DAQ continues file G22-86/R42_21
 47x 
  527   Sun Feb 18 13:58:33 2024 AR, OF, JMRun 42 - cooled beam on targetRun 42 - 15:00

Detectors IN (left arm pot =36.54
mm, right arm pot = 70.49 mm). Stationary.
 27x 
  526   Sun Feb 18 13:10:18 2024 TDSunday 18 February - DSSSD 0 aida01 and aida04 *.*.L spectra
DSSSD 0 aida01 1*L spectra, aida04 **L spectra
 Screenshot_from_2024-02-18_13-58-29.pngScreenshot_from_2024-02-18_13-59-55.pngScreenshot_from_2024-02-18_14-01-19.pngScreenshot_from_2024-02-18_14-08-36.pngScreenshot_from_2024-02-18_14-09-44.png 
  525   Sun Feb 18 07:53:51 2024 HW AGRun 40 Morning Shift08:57 Doing morning check. Checked the
leakage currents, all ok. Attachment 1

Tempritures of, attchment 2
 27x 
  524   Sun Feb 18 00:16:55 2024 JM CBRun 40 - night shift01:17

Run 40 continues.

Beam intensity looks OK. Oscillates
 15x 
  523   Sat Feb 17 14:29:03 2024 JM, CB, AR, ABRun 40 - cooled beam on target15:27

Run 40 started cooled beam on target

Detectors IN (left arm pot =36.5
 31x 
  522   Sat Feb 17 13:21:44 2024 JM, CBBeam on target - motors tests14:01

Run 36 started.

We put both detectors to the fully
 Screenshot_from_2024-02-17_14-33-51.pngScreenshot_from_2024-02-17_14-36-27.pngScreenshot_from_2024-02-17_14-39-38.png 
  521   Sat Feb 17 06:19:27 2024 JM, CBRun 35 - contd07:10

FEE temperatures OK

System checks OK
 Screenshot_from_2024-02-17_07-20-01.pngScreenshot_from_2024-02-17_07-21-27.pngScreenshot_from_2024-02-17_09-09-35.pngScreenshot_from_2024-02-17_09-13-44.pngScreenshot_from_2024-02-17_09-14-35.png 
  520   Fri Feb 16 22:03:27 2024 TDRun 35 - night shift
22.51 DAQ continues file G22-86/R35_36
 49x 
  519   Fri Feb 16 10:02:41 2024 JM, OF, CB, AR, EMRun 35 - cooled beam on target11:01

Run 35 started cooled beam on target

Detectors IN (left arm pot =36.5
 27x 
  518   Thu Feb 15 21:07:00 2024 JM, AB, AR, OFRun33 - cooled beam on target22:27

Run 33 started cooled beam on target.

Detectors IN (left arm pot =36.5
 22x 
  517   Thu Feb 15 13:18:30 2024 JGMBS DAQ: target & ring valuesWe are running an MBS DAQ to record the
attached list of slow control values of the
ring and the target. In most cases this is
  
  516   Thu Feb 15 12:40:52 2024 JM. CB, AR, ABRun30 - uncooled beam on targetRun started 13:40

Target density 4.3e11, Beam injection
is ~1e7, Pressure in the ring is ~1e-10 mbar.
 29x 
  515   Thu Feb 15 10:39:50 2024 JM, JG, ML, AG, CBRun29 - beam optimisation11:27

Run 29 started. Beam energy is
1.3435 MeV/u with a cooler voltage of 751.3
  
  514   Wed Feb 14 16:52:46 2024 JM, AR, CB, JGRun28 - beam on target  

Beam energy - 1.361 MeV/u

17:12
 42x 
  513   Wed Feb 14 14:59:13 2024 JM, CB, NP, ML, AG, ABRun 27 -Beam on target optimisationRun 27 Started to check optimsation of
the beam - target overlap.

Beam intensity at injection is
 Target-overlap-scan-optimized.pdf 
  512   Wed Feb 14 14:06:28 2024 CB AR JMPulser Walkthrough
15:06
Run25

Pulser walkthrough

EGG
Ortec 448 Pulser

Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators
  
  511   Wed Feb 14 08:44:32 2024 CB AR JMMotors test and turbo ONRun number changed 09:44 - Now run 23

Moving motors with the injection

Ring signal very weird, moving
 11x 
ELOG V3.1.4-unknown