AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 2 of 28
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
546 Entries
Goto page
Previous
1
, 2,
3
...
26
,
27
,
28
Next
ID
Date
Author
Subject
Text
455
Tue Oct 17 08:43:47 2023
CB
NEG activation -2
09:40 - Found temperature and pressure
stablised, but too high to comfortably activate
NEGs closest to detectors. Detector temperature
495
Tue Feb 6 09:39:54 2024
CB
Detector bias tests
10:30 Found ADC#4 on aida 1 and 4 are suddenly
noisy. See attach 1-2. Checkloaded multiple
times - no effect.
13x
9
Sat Sep 12 08:38:52 2020
CB (remotely)
Baking over the weekend
Saturday 12 Sep 08:43
Remotely checked status of baking. See attached.
10
Sun Sep 13 08:06:25 2020
CB (remotely)
Baking over the weekend -2
Sun 13 Sep 08:06
Baking reached 93 C yesterday afternoon at
13
Wed Sep 16 08:52:03 2020
CB (remotely)
Baking status 16-17 September
16 September
08:50
24
Wed Sep 30 08:10:36 2020
CB (remotely)
First bake of CARME with pumps
(NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
19x
29
Thu Oct 22 22:15:00 2020
CB (remotely)
Cooling down after first NEG activation
Thu 22 October
22:15 Temperatures stables, slowly decreasing.
7x
71
Sun Sep 19 09:11:34 2021
CB (remotely)
Baking RasPi status
Accessed Pi remotely
( 1. Without the Internet, the Pi has no
74
Wed Sep 22 08:30:08 2021
CB (remotely)
CARME pressure during first XHV test
CARME pressure moved to
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
77
Thu Sep 23 14:19:27 2021
CB (remotely)
Checking baking remotely - instructions
1. Connect to pi on CRYRING local network
ssh pi@192.168.207.127
81
Fri Sep 24 15:36:34 2021
CB (remotely)
CARME baking status
Current temperature ~64 C
See plots attached
82
Sat Sep 25 07:23:06 2021
CB (remotely)
CARME baking status -2
Current temperature ~90 C
However note setpoint is at 102 C. It appears
we are baking at full power, but too many
83
Sat Sep 25 19:01:50 2021
CB (remotely)
CARME baking status -3
Baking automatically stopped due to negative
gradient in on thermocouple for 10 minutes
straight.
84
Sun Sep 26 07:41:00 2021
CB (remotely)
CARME baking status -4
Current temperature ~87C
See plot and screen attached.
87
Mon Sep 27 11:09:48 2021
CB (remotely)
Temperature vs Pressure plot
Attached.
89
Mon Sep 27 21:33:50 2021
CB (remotely)
CARME baking status -7
Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may
100
Fri Oct 1 21:47:51 2021
CB (remotely)
CARME baking status -16
Current temperature ~132 C (on manual mode
RE72-1: 132 C, RE72-2: 130 C)
See plot and screen attached.
164
Sun Nov 28 15:57:45 2021
CB (remotely)
Nov 2021 temperatures
Attached
166
Tue Dec 7 09:39:59 2021
CB (remotely)
Gate valves closed
Dry run complete.
YR09 section valves closed. Section
isolated. Manual valve between electron target
165
Tue Nov 30 10:49:43 2021
CB (remotely) GV
Gate valve opened
GSI vacuum division IE514 gauge connected.
Gleb reports gate downstream opened.
Vacuum goes up and recovers as expected.
Goto page
Previous
1
, 2,
3
...
26
,
27
,
28
Next
ELOG V3.1.4-unknown