AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 28 of 28
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
546 Entries
Goto page
Previous
1
,
2
,
3
...
26
,
27
, 28
ID
Date
Author
Subject
Text
313
Sun Feb 27 20:19:06 2022
Rui-Jiu Chen, Yuri
open the valves of target.
342
Tue Mar 1 06:04:04 2022
SHB, MS
positions
just FYI: current positions saved in files
are x=1000 and y=-750. this information is
good in case of crash.
534
Tue Feb 20 08:41:08 2024
OF, AG
still no beam CRYRING
We have mosty empty injections into CRYRING.
Only sporadically the beam with good intensity
is injected.
354
Tue Mar 1 19:41:24 2022
PM, LV
target temperature walkthrough
A target temperature walkthrough has been
initiated at 20:41 since the target density
at S1 had slightly decreased (with ~0.1-0.2)
242
Tue Feb 22 19:28:35 2022
David, Yuri
vacuum
At 19:10 Frank called us that vacuum in
sections 08 and 10 got worse by about 1.5
times. There is a possible danger that vacuum
362
Wed Mar 2 06:00:49 2022
Spillmann, Uwe
waiting
07:00
Target density is hovering between
2.0e-8 and 2.3e-8
Goto page
Previous
1
,
2
,
3
...
26
,
27
, 28
ELOG V3.1.4-unknown