435
|
Mon Aug 14 09:22:56 2023 |
JM | Bakeout | 14/08/23
Temperature in the baking volume
is ~ 42 C and the pressure is 4.6e-8 mbar. |
|
15
|
Thu Sep 17 10:13:43 2020 |
JM, CB(remotely) | Bakeout cooling and pumping of chamber | The Chamber has continued to pump overnight
and we have reached a pressure of 3.3e-6
mbar as of 10:15. Power cable for the hot |
|
442
|
Fri Sep 22 12:35:46 2023 |
JM | Bakeout plots | Attached are plots for the previous bakeout
of CARME which may aid in the bakeout to
come in the following week. |
|
5
|
Wed Sep 2 17:01:49 2020 |
JM | Bakeout started and valve installation | Initial bakeout started which will run
until friday, temperature had reached 44
degrees when I left the lab. |
|
6
|
Fri Sep 4 15:48:25 2020 |
JM | Bakeout test completed | Bakeout test completed. Maximum temperature
reached within baking volume was 120
degrees, with baking stopped by the program |
|
23
|
Mon Sep 28 13:04:27 2020 |
JM | Baking | I have (fingers crossed) got the baking
stepping up nicely now. I have used some
of the outer shell to act as a shield and |
|
79
|
Fri Sep 24 08:47:36 2021 |
JM RSS CB(Remotely) | Baking | Baking halted on 23/9/21 16:16 as connection
to TC08 module was lost. USB cable connection
to TC08 module appears to have been damaged |
|
88
|
Mon Sep 27 17:53:35 2021 |
JM RSS | Baking Jacket upgrade + NEG controllers connected | Additional baking jacket sections for the
turbo section arrived today. Baking was halted
at ~11:00 to allow for the chamber to cool |
|
71
|
Sun Sep 19 09:11:34 2021 |
CB (remotely) | Baking RasPi status | Accessed Pi remotely
( 1. Without the Internet, the Pi has no |
|
12
|
Tue Sep 15 08:39:26 2020 |
CB (remotely), JM | Baking and Chamber status | Tuesday 15 September
08:40
|
|
9
|
Sat Sep 12 08:38:52 2020 |
CB (remotely) | Baking over the weekend | Saturday 12 Sep 08:43
Remotely checked status of baking. See attached.
|
|
10
|
Sun Sep 13 08:06:25 2020 |
CB (remotely) | Baking over the weekend -2 | Sun 13 Sep 08:06
Baking reached 93 C yesterday afternoon at |
|
22
|
Sat Sep 26 09:31:46 2020 |
JM, CB (both remotely) | Baking over weekend | Sat 26 Sep
09:15 Baking started automatic
mode |
|
11
|
Mon Sep 14 12:07:40 2020 |
JM, CB (remotely) | Baking status | Mon 14 Sep 09:50
Jordan moved the TC08 picolog 2 away from |
|
16
|
Fri Sep 18 10:28:57 2020 |
JM, CB(remotely) | Baking status | 10:28
Reducing temperature in steps. System cooling
down. See attached.
|
|
13
|
Wed Sep 16 08:52:03 2020 |
CB (remotely) | Baking status 16-17 September | 16 September
08:50
|
|
431
|
Thu Aug 10 07:51:43 2023 |
JM | Baking tent and heater testing | 09/08/23
Attached is the current pumpdown
plot taken from grafana. |
8x |
424
|
Fri Jul 21 08:21:54 2023 |
TD, RSS | Baking tent manual | 09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar
Today - install TCs, connect to Pico |
|
167
|
Mon Jan 10 20:52:53 2022 |
JM, TD, OH | Baking tent removed, VI tests | Baking tent, frame and trays fully
removed from CARME chamber. Removal of baking
frame required removing air lines from upper |
|
359
|
Tue Mar 1 23:43:15 2022 |
David, George | Beam Intensity Drop | 00:38
Intensity in the ring dropped by 2
orders of magnitude to 5e5 on injection |
|