  41   Thu Aug 12 09:16:42 2021 TD RSSThursday 12 August
Attachment 1 - IE414/514 feedthrough wiring
diagram
 13x 
  42   Fri Aug 13 07:28:37 2021 RSS TDFriday 13-17 August Pirani  IE514
mbar    mbar
 23x 
  43   Wed Aug 18 07:07:26 2021 RSS TD18-24 August
Pirani  IE514
mbar    mbar


18/8/21
08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032
3.72e-8


 
 25x 
  44   Wed Aug 18 11:58:49 2021 NTD RSSMisc fittings and fasteners plus gasket inventoryAttachments 1-3 fasteners, fittings found
amongst earlier shipments. I assume that
the STFC DL cleaned items are for the internal
 22x 
  45   Wed Aug 25 07:02:41 2021 RSS TD25-31 August
Pirani  IE514
mbar    mbar


25/8/21
08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00 
 19x 
  46   Tue Aug 31 07:09:54 2021 CB RSS (rem) JMPreparation for mounting(30 August 2021)

The current state of YR09 is as per attach
 6x 
  47   Tue Aug 31 11:55:11 2021 CB RSSLast preparations for CARME liftFound strut bolts in the bag with 
spherical washers. Mounted the struts and
 16304077162843806956479048661374.jpg16304077904321905824276870110392.jpg 
  48   Tue Aug 31 18:34:41 2021 CB RSS + DR OGCARME on Al standLifted CARME off the floor and mounted feet
on sides. It was found impossible to put
four bolts for each foot
 20210831_144545.jpg20210831_171442.jpg20210831_171447.jpg20210831_171449.jpg20210831_171453.jpg 
  49   Tue Aug 31 18:56:35 2021 CBCARME status(ELOG does not allow more pictures to be added
to previous entry)
 9x 
  50   Wed Sep 1 12:05:28 2021 CB RSSPreparation for CARME on CRYRING YR09Mounted additional cross member for motor

support. See attach 1
 20210901_125504.jpg20210901_125517.jpg 
  51   Wed Sep 1 17:14:16 2021 CB RSS + DR MLCARME mounted on the CRYRINGLifted CARME with Al support on the 
CRYRING. No issues during transportation.
 20210901_162435.jpg20210901_173059.jpg20210901_174157.jpg20210901_134635.jpg20210901_173059.jpg 
  52   Thu Sep 2 10:41:16 2021 CB RSS + DR OGCARME connected to the CRYRINGConnected CARME to the CRYRING via tube 
plus bellows. See attach.
 20210902_114031.jpg 
  53   Thu Sep 2 21:04:26 2021 CB RSS ML + DR OGGate valves mounted + pump downMounted both gate valves and support. Gate

valves could not be installed one bolt 
 6x 
  54   Fri Sep 3 08:12:39 2021 CB RSSPressure after overnight pump down03.09.2021   09:00   5.27E-7 mbar     
03.09.2021   13:00   4.08E-7 mbar       
           
 20210903_085646.jpgIMG_4487.JPG 
  55   Fri Sep 3 08:14:51 2021 CB RSSIssues foreseeable splitting CARMEIn order to install the detector supports

and eventually install the detectors 
 7x 
  56   Fri Sep 3 14:14:40 2021 TDLeybold IE514 manual & calibration data   20210903_141201.jpgIonivac_Sensors_IE414_IE514.pdf 
  57   Fri Sep 3 15:55:00 2021 CB RSSIssues with cable clampsAttempted to mount cable clamps for strain

relief on inner part of Allectra 
 20210903_154614.jpg20210903_162519.jpg 
  58   Sat Sep 4 15:54:50 2021 CB RSSMotor mounting preparationPrepared the motors to be mounted and 
found all components required. No issues.
 20210904_162517.jpg20210904_162520.jpg 
  59   Mon Sep 6 14:13:17 2021 CB MLMotors mounted - first attemptMounted both  motors on CARME. Started 
with outside motor.
 20210906_113522.jpg20210906_113519.jpg20210906_115601.jpg20210906_152607.jpg20210906_143944.jpg 
  60   Tue Sep 7 11:37:05 2021 CB RSS + OGUpdate on strain relief screw issuesTested every strain relief. M3 screws get
stuck at different points in each hole. Only
one good hole out of 16
  