AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 26 of 28  ELOG logo
ID Date Author Subjectup Text Attachments
  544   Wed Apr 24 12:48:35 2024 TDWednesday 24 April
      Replace AIDA ASIC mezzanine of aida01
 21x 
  35   Wed Nov 25 10:39:37 2020 TDWednesday 25 November
10.39
 7x 
  446   Wed Sep 27 15:56:41 2023 TDWednesday 27 September
16.55 CARME IE514 8.2e-11 mbar
 1000007129.jpg1000007127.jpg1000007128.jpg 
  31   Wed Oct 28 10:41:57 2020 TDWednesday 28 October
10.32
 6x 
  382   Wed Nov 30 08:52:59 2022 AR TDWednesday 30 November9:40

DSSD bias and leakage current values:

-99.99 V
 26x 
  540   Wed Mar 6 10:47:11 2024 JG, TDWednesday 6 March - PEXARIA5 WR test
Courtesy Nik Kurz, JG has installed a PEXARIA5
PCIe card adjacent to CARME - BuTIS single-mode
 temps.PNGstats_1.PNGstats_2.PNGwr_0949.PNG 
  2   Tue Aug 18 11:26:26 2020 JMWeek ending Friday 14/08/20Week ending friday 14/08/20

CARME chamber securely mounted
upon aluminium frame and support skis. Neg-ion
 Photo.zip 
  135   Sun Oct 31 07:41:20 2021 CB JM + RSSWires plugged in DSSDs (Wed 27 October)

Started with top-most flange. Attemptedto
plug in MACOR lead in DSSD plug in preparation
 8x 
  147   Wed Nov 10 14:41:12 2021 TD RSS + CB (remotely)Wrapping CARME in heating tapeML reports that baking of the upstream section
(gas jet interaction chamber plus e-target)
has commenced - initially to 50 deg C to
  
  489   Sat Feb 3 15:05:10 2024 CB, TD[How To] Restart Anydesk1. Check Proxy server is correct

localhost : 8080

incoming connections 7070
  
  119   Wed Oct 13 11:59:23 2021 TD[How to] Open COF600 copper wire seals
Use the M10 jacking points provided top/bottom
and 
 20211013_103806.jpg20211013_103800.jpg 
  482   Tue Jan 30 14:04:30 2024 NH[HowTo] Update MACB FirmwareThis is how to update the MACB firmware using
the opensource tool xc3sprog
 xusbdfwu.rulesxilinx.tar.gzxc2c128.mapmacb_apr20.jed 
  478   Sat Jan 27 20:38:15 2024 PJCS[INFO] Steps to diagnose White Rabbit problemsThis is a suggested sequence of actions
to help with the current problem with the
White Rabbit timestamp distribution. Test
  
  182   Mon Jan 31 08:58:38 2022 OH, TD, JMcentos server configurationSteps taken:
- MIDAS_Releases, Embedded and Exports files
brought across from the previously working
 8x 
  259   Wed Feb 23 19:22:55 2022 CN, TDcheck 

- Motor checked , OK

SW3
 10x 
  267   Thu Feb 24 08:15:23 2022 JG, MScheckBeam is still beeing tuned. Target is off.

There is a problem with ADC calibration
of aida5: see entry https://elog.ph.ed.ac.uk/CARME/268
 13x 
  269   Thu Feb 24 09:43:16 2022 JG, MScheckBeam is still beeing tuned. Target is off.

 

- Motor on manual
 13x 
  271   Thu Feb 24 22:45:08 2022 Jordan, George, Rui-Jiu Chencheck- Motor fully out position.

SW3

- Merger OK
 14x 
  275   Fri Feb 25 03:01:11 2022 Rui-Jiu Chen, AlexcheckStill  no beam in CRING.

Motor fully out position.

SW3
 14x 
  277   Fri Feb 25 05:04:16 2022 Rui-Jiu Chen, AlexcheckStill  no beam in CRING.

Motor fully out position.

SW3
 14x 
ELOG V3.1.4-unknown