  23   Mon Sep 28 13:04:27 2020 JMBakingI have (fingers crossed) got the baking
stepping up nicely now. I have used some
of the outer shell to act as a shield and
 20200928_081831.jpg20200928_130239.jpg 
  6   Fri Sep 4 15:48:25 2020 JMBakeout test completedBakeout test completed. Maximum temperature
reached within baking volume was 120
degrees, with baking stopped by the program
 191214004923_temperatures.txtBakeout1.png 
  5   Wed Sep 2 17:01:49 2020 JMBakeout started and valve installationInitial bakeout started which will run
until friday, temperature had reached 44
degrees when I left the lab. 
 Photos.zip 
  442   Fri Sep 22 12:35:46 2023 JMBakeout plotsAttached are plots for the previous bakeout
of CARME which may aid in the bakeout to
come in the following week.  
 Heater-chamber-temps.pngpressure-chamber-temp.pngHeater-power-chamber-temp.pngHeater-power-temp.png 
  15   Thu Sep 17 10:13:43 2020 JM, CB(remotely)Bakeout cooling and pumping of chamberThe Chamber has continued to pump overnight
and we have reached a pressure of 3.3e-6
mbar as of 10:15. Power cable for the hot
 Photos.zip20200917_1428_temp_last.png 
  435   Mon Aug 14 09:22:56 2023 JMBakeout14/08/23

Temperature in the baking volume
is ~ 42 C and the pressure is 4.6e-8 mbar.
 20230814_150430.jpg20230815_094400.jpgHeater-power.pngHeater-ITC-temp.pngPressure-ITC-temp.png 
  371   Tue Aug 9 16:07:33 2022 JM, TDAnydesk setup command lineTo log into appc218 desktop:
same login and password as to carme@atppc022.gsi.de

To start anydesk
  
  232   Tue Feb 22 09:10:48 2022 OHAnalysis of R54_14Results of the fortran analyser programs for
R54_14
 R54_14_analyser.txt 
  186   Fri Feb 4 09:53:48 2022 JM, TD, OH (remotely)Alpha spectra overnightDAQ was left running last night from 19:30.
Detector bias 80V with a leakage current
~3.4 uA. Pulser OFF.
 8x 
  215   Mon Feb 21 08:05:45 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  216   Mon Feb 21 09:07:37 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  217   Mon Feb 21 10:59:48 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
  
  218   Mon Feb 21 12:10:47 2022 RSS, JGAlpha background run50Beam OFF. Run started 20/2/22 18:42

System checck OK, except white
rabbit all fail
 220221_1506_aida03_1*W.png 
  208   Fri Feb 18 08:58:08 2022 RSS, ML, CBAlpha background run4610:00

 

Check Leakage current: (see attachment
 11x 
  209   Fri Feb 18 11:07:52 2022 RSS, ML, CBAlpha background run4612:00

 

Check Leakage current: (see attachment
 11x 
  210   Fri Feb 18 13:03:02 2022 RSS, ML, CBAlpha background run4614:00

 

Check Leakage current: (see attachment
 11x 
  205   Thu Feb 17 15:09:40 2022 JM,CB,SDAlpha background run4416:09

 

Check Leakage current: (see attachment
 8x 
  203   Thu Feb 17 08:31:07 2022 RSS, AGAlpha background run4309:15

Check Leakage current: (see attachment
2)
 11x 
  204   Thu Feb 17 13:12:19 2022 RSS, AGAlpha background run4314:00

 

Check Leakage current: (see attachment
 11x 
  199   Wed Feb 16 12:43:05 2022 TP, RSSAlpha background run40 13:30

Check Leakage current: (see attachment
1)
 11x 