AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 27 of 28  ELOG logo
ID Date Author Subjectdown Text Attachments
  198   Wed Feb 16 08:27:27 2022 TP, RSSAlpha background run4009:15

Check Leakage current: (see attachment
1)
 11x 
  195   Tue Feb 15 10:46:37 2022 RSS, LV, CBAlpha background run3711:30

Check Fee temperatures: all green
(see attachment 1)
 10x 
  193   Sun Feb 13 21:28:35 2022 JM, CBAlpha background Run 32, 35Alpha background gathered from 17:35 12/2/22
to 13:44 13/2/22 is run32. Run time ~20 hours.
Some alphas visible in aida1 1*L histograms
 6x 
  214   Sun Feb 20 22:04:21 2022 JM, CBAlpha Background run 50 Beam OFF. Run started 20/2/22 18:42

Fast comparator threshold HEC set
to 0xff for all fees and asics to combat
  
  211   Fri Feb 18 20:31:33 2022 JM, CBAlpha Background run 48Alpha background started with beam ON -
run47. Run started 16:49 18/2/22  
(beam subsequently found to be OFF)
 2022-02-19_14-45-25-leage-current.png 
  207   Thu Feb 17 18:19:16 2022 JM, CB, SDAlpha Background run 46Both GSI vacuum group and edinburgh ion
gauges OFF

Fees power cycled. All system checks
 2022-02-17_22-41-45-leakageCurrent.png2022-02-17_22-51-07-aida1-3*L.png2022-02-17_22-54-06-XYTotal.png2022-02-17_22-56-38-ExHist.png 
  65   Thu Sep 9 13:01:07 2021 CB RSS + OGAll feedthrough flanges mounted and motor rotatedMoved cables that touched neg pumps. See 
photos. Please bear in mind perspective.
Note avoiding touching chamber 
 20210909_111933.jpg20210909_112120.jpg20210909_112125.jpg20210909_133027.jpg 
  394   Mon May 1 18:21:18 2023 CB, JMAll detectors mounted Mounted four detectors on Carme ad well
as four cable harnesses.

 
 20230501_191533.jpg20230501_191511.jpg20230501_145740.jpg 
  395   Tue May 2 15:02:09 2023 CB, JMAll detectors and harnesses mounted Completed mounting harnesses and detectors.

The strain relief support for the
bottom most two detectors on the feedthrough
 20230502_153410.jpg20230502_153503.jpg20230502_153509.jpg20230502_153511.jpg 
  464   Thu Jan 11 19:57:20 2024 CB, JMAll FEE holders mountedAfter discussions with Davide, changed
the holes in the FEE holders for the bottom-right
detector to slots in order to slightly change
  
  497   Wed Feb 7 13:50:20 2024 Elena Hanu, Carlo Bruno, Michael LestinskyAfternoon shift14:50

 

Temperature, Statistics fine (see
 Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png 
  171   Thu Jan 13 10:33:24 2022 JM, OH, TDAdaptor Board misallignmentThe ERNI connector is not central on the
adaptor boards causing misallignment with
the FEE. 
 20220112_160951.jpg20220113_145105.jpg20220113_145147.jpg 
  105   Mon Oct 4 09:19:11 2021 JM RSSActivation of NEG elements9:30

Ion pumps de-gassed by switching
on and off multiple times. Large pressure
 IMG_4880.JPGIMG_4881.JPGIMG_4882.JPGIMG_4883.JPG 
  179   Thu Jan 27 15:24:02 2022 OH, JMAccess to Motors PI1. ssh <user>@lxpool.gsi.de
2. ssh <user or carme>@atppc022.gsi.de
3. ssh pi@CARMEmotorspi (Standard npg password)
  
  268   Thu Feb 24 08:30:36 2022 JG, MSAIDA5 calibration test failed - solvedUPDATE: THE PROBLEM IS SOLVED FOR NOW:

Doing the calib for the 5th time
eventually worked.
 Screenshot_from_2022-02-24_09-09-36.pngScreenshot_from_2022-02-24_09-29-24.png 
  474   Wed Jan 17 19:21:20 2024 TDAIDA spares
Spare AIDA hardware 
  
  180   Thu Jan 27 21:33:40 2022 JM, OHAIDA config files, remote access, motor testPower, Ethernet and HDMI cables connected
to FEEs. To prevent cables coming out of
connectors, power and HDMI cables are zip
 20220127_101513.jpg 
  45   Wed Aug 25 07:02:41 2021 RSS TD25-31 August
Pirani  IE514
mbar    mbar


25/8/21
08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00 
 19x 
  552   Fri May 10 21:23:35 2024 TD, CB, JM20Ne7+ test beam22.00

Carsten Brandau stopping e-target
experiment Unattended beam overnight. No
 18x 
  43   Wed Aug 18 07:07:26 2021 RSS TD18-24 August
Pirani  IE514
mbar    mbar


18/8/21
08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032
3.72e-8


 
 25x 
ELOG V3.1.4-unknown