AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 29 of 33
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
654 Entries
Goto page
Previous
1
,
2
,
3
...
28
, 29,
30
,
31
,
32
,
33
Next
ID
Date
Author
Subject
Text
94
Wed Sep 29 09:27:38 2021
CB (remotely), RSS JM ML
Power cut
Sudden and unexpected power cut at 10:02 German
time, affecting all the target hall.
93
Wed Sep 29 06:49:41 2021
RSS JM
CARME baking status -11
Current temperature ~130 C (on manual
mode)
See plot and screen attached.
Current
pressure ~6.08E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
92
Tue Sep 28 18:53:13 2021
RSS JM
CARME baking status -10
Current temperature ~130 C (on manual
mode)
See plot and screen attached.
Current
pressure ~9.98E-7 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
91
Tue Sep 28 12:18:54 2021
RSS JM
CARME baking status -9
Current temperature ~130 C, was set
to 130 C on manual mode around 10:00 am
See
plot and screen attached.
Current pressure
90
Tue Sep 28 06:40:22 2021
RSS JM
CARME baking status -8
Current temperature ~120 C, increasing
See
plot and screen attached.
Current pressure
~1.07E-6 mbar
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
89
Mon Sep 27 21:33:50 2021
CB (remotely)
CARME baking status -7
Current temperature ~87 C, increasing
See plot and screen attached.
Thermocouple on CARME foot side (1-4) may
88
Mon Sep 27 17:53:35 2021
JM RSS
Baking Jacket upgrade + NEG controllers connected
Additional baking jacket sections for the
turbo section arrived today. Baking was halted
at ~11:00 to allow for the chamber to cool
87
Mon Sep 27 11:09:48 2021
CB (remotely)
Temperature vs Pressure plot
Attached.
86
Mon Sep 27 06:42:45 2021
RSS JM
CARME baking status -6
Current temperature ~102 C. Was set
in the manual mode since last evening 18:54.
See
plot and screen attached.
Current
85
Sun Sep 26 17:20:13 2021
RSS JM CB (remotely)
CARME baking status -5
Current temperature ~105 C
See plot
and screen attached.
Current
pressure 6.08E-7
See
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?rtime=OK4kVZKB2Ug
84
Sun Sep 26 07:41:00 2021
CB (remotely)
CARME baking status -4
Current temperature ~87C
See plot and screen attached.
83
Sat Sep 25 19:01:50 2021
CB (remotely)
CARME baking status -3
Baking automatically stopped due to negative
gradient in on thermocouple for 10 minutes
straight.
82
Sat Sep 25 07:23:06 2021
CB (remotely)
CARME baking status -2
Current temperature ~90 C
However note setpoint is at 102 C. It appears
we are baking at full power, but too many
81
Fri Sep 24 15:36:34 2021
CB (remotely)
CARME baking status
Current temperature ~64 C
See plots attached
80
Fri Sep 24 09:44:58 2021
JM ML
Vacuum gauge readout
The analog readout of the Combivac controller
for the IE514 ion gauge has been set up,
readings are plotted to http://web-docs.gsi.de/~lestinsk/vacplot.php.
79
Fri Sep 24 08:47:36 2021
JM RSS CB(Remotely)
Baking
Baking halted on 23/9/21 16:16 as connection
to TC08 module was lost. USB cable connection
to TC08 module appears to have been damaged
78
Fri Sep 24 07:04:57 2021
RSS JM
IE 514 pin arrangement and degas instructions
Fabre (German)
Color (English)
grau
77
Thu Sep 23 14:19:27 2021
CB (remotely)
Checking baking remotely - instructions
1. Connect to pi on CRYRING local network
ssh pi@192.168.207.127
76
Thu Sep 23 13:31:12 2021
JM RSS ML
IE514 Gauge and Bakeout
CARME setup checked by vaccum group this
morning.
Both IE514 gauges de-gassed. To
75
Wed Sep 22 14:44:51 2021
JM RSS ML
CARME leak test + bakeout tent
On 21/9/21 CARME was connected to the leak
tester. Leak testing showed no apparent leaks,
extra time required to reach <1e-4 mbar
Goto page
Previous
1
,
2
,
3
...
28
, 29,
30
,
31
,
32
,
33
Next
ELOG V3.1.4-unknown