AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 30 of 33
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
654 Entries
Goto page
Previous
1
,
2
,
3
...
29
, 30,
31
,
32
,
33
Next
ID
Date
Author
Subject
Text
74
Wed Sep 22 08:30:08 2021
CB (remotely)
CARME pressure during first XHV test
CARME pressure moved to
https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
73
Tue Sep 21 08:20:39 2021
ML
CARME installations
72
Mon Sep 20 11:45:45 2021
JM RSS ML
CARME installations
Ion pump, RGA and additional gauge installed
on the chamber.
Our gauge is the one mounted above
6x
71
Sun Sep 19 09:11:34 2021
CB (remotely)
Baking RasPi status
Accessed Pi remotely
( 1. Without the Internet, the Pi has no
70
Fri Sep 17 16:42:25 2021
JM RSS ML + OG
CARME Realignment + Thermocouple installation
Laser surveying team worked till 11. Chamber
was too high by 3mm close to the jet target
and 6mm by the turbo pump (towards the dipole).
8x
69
Thu Sep 16 15:24:29 2021
JM RSS
CARME vented + thermocouple feedthrough
Chamber has been vented back to atmosphere.
Motor was able to be pulled back
to insert bloacking pin once at atmosphere.
68
Sat Sep 11 16:01:44 2021
CB RSS
Preparations for shutdown
Found CARME pressure at 2E-7 mbar
Raspberry pi took pictures until 4 am and
67
Fri Sep 10 18:09:14 2021
CB RSS ML
Leak test + baking system test
Leak tested CARME via He leak tester + He
bottle. No leaks could be found. Some
66
Fri Sep 10 10:50:55 2021
CB RSS ML
Pressure after overnight pump down
Pressure found in 10-7 mbar range.
Decided to leak test anyway for safety.
65
Thu Sep 9 13:01:07 2021
CB RSS + OG
All feedthrough flanges mounted and motor rotated
Moved cables that touched neg pumps. See
photos. Please bear in mind perspective.
Note avoiding touching chamber
64
Wed Sep 8 17:03:07 2021
CB RSS + OG NB
Six feedthrough flanges mounted
Continued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a
23x
63
Wed Sep 8 10:52:54 2021
CB RSS + OG
First feedthrough flange mounted
Assembled feedthrough flange with re-cut
SS support bracket. M3 vented on the
sides, M3x30 partly threaded on top. Top
62
Tue Sep 7 14:10:02 2021
CB RSS + OG
Strain relief SS support re-drilled
Re-drilled SS supports in order to fit M3
screws.
61
Tue Sep 7 12:40:43 2021
CB ML + RH
CARME survey preparation
Rudi and survey group representative came
to CARME.
60
Tue Sep 7 11:37:05 2021
CB RSS + OG
Update on strain relief screw issues
Tested every strain relief. M3 screws get
stuck at different points in each hole. Only
one good hole out of 16
59
Mon Sep 6 14:13:17 2021
CB ML
Motors mounted - first attempt
Mounted both motors on CARME. Started
with outside motor.
58
Sat Sep 4 15:54:50 2021
CB RSS
Motor mounting preparation
Prepared the motors to be mounted and
found all components required. No issues.
57
Fri Sep 3 15:55:00 2021
CB RSS
Issues with cable clamps
Attempted to mount cable clamps for strain
relief on inner part of Allectra
56
Fri Sep 3 14:14:40 2021
TD
Leybold IE514 manual & calibration data
55
Fri Sep 3 08:14:51 2021
CB RSS
Issues foreseeable splitting CARME
In order to install the detector supports
and eventually install the detectors
7x