  74   Wed Sep 22 08:30:08 2021 CB (remotely)CARME pressure during first XHV testCARME pressure moved to

https://uoe-my.sharepoint.com/:x:/g/personal/cbruno2_ed_ac_uk/EVbsVOubNHRLj0PKiFIvd00BClMJ6WSJ1UDAyLA2F3R4jA?e=hEoZt7
  
  73   Tue Sep 21 08:20:39 2021 MLCARME installations 




  
  72   Mon Sep 20 11:45:45 2021 JM RSS MLCARME installationsIon pump, RGA and additional gauge installed
on the chamber.

Our gauge is the one mounted above
 6x 
  71   Sun Sep 19 09:11:34 2021 CB (remotely)Baking RasPi statusAccessed Pi remotely 

( 1. Without the Internet, the Pi has no
  
  70   Fri Sep 17 16:42:25 2021 JM RSS ML + OGCARME Realignment + Thermocouple installationLaser surveying team worked till 11. Chamber
was too high by 3mm close to the jet target
and 6mm by the turbo pump (towards the dipole). 
 8x 
  69   Thu Sep 16 15:24:29 2021 JM RSSCARME vented + thermocouple feedthroughChamber has been vented back to atmosphere. 

Motor was able to be pulled back
to insert bloacking pin once at atmosphere.
 1.jpg2.jpg3.jpg 
  68   Sat Sep 11 16:01:44 2021 CB RSSPreparations for shutdownFound CARME pressure at 2E-7 mbar

Raspberry pi took pictures until 4 am and
 turbo_pump.pnglog_scale.png 
  67   Fri Sep 10 18:09:14 2021 CB RSS MLLeak test + baking system testLeak tested CARME via He leak tester + He

bottle. No leaks could be found. Some 
  
  66   Fri Sep 10 10:50:55 2021 CB RSS MLPressure after overnight pump downPressure found in 10-7 mbar range.

Decided to leak test anyway for safety.
 20210910_101131.jpg 
  65   Thu Sep 9 13:01:07 2021 CB RSS + OGAll feedthrough flanges mounted and motor rotatedMoved cables that touched neg pumps. See 
photos. Please bear in mind perspective.
Note avoiding touching chamber 
 20210909_111933.jpg20210909_112120.jpg20210909_112125.jpg20210909_133027.jpg 
  64   Wed Sep 8 17:03:07 2021 CB RSS + OG NBSix feedthrough flanges mountedContinued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a
 23x 
  63   Wed Sep 8 10:52:54 2021 CB RSS + OGFirst feedthrough flange mountedAssembled feedthrough flange with re-cut 
SS support bracket. M3 vented on the 
sides, M3x30 partly threaded on top. Top
 20210908_101743.jpg20210908_111958.jpg20210908_112002.jpg20210908_112006.jpg20210908_112010.jpg 
  62   Tue Sep 7 14:10:02 2021 CB RSS + OGStrain relief SS support re-drilledRe-drilled SS supports in order to fit M3
screws.
  
  61   Tue Sep 7 12:40:43 2021 CB ML + RHCARME survey preparationRudi and survey group representative came

to CARME. 
  
  60   Tue Sep 7 11:37:05 2021 CB RSS + OGUpdate on strain relief screw issuesTested every strain relief. M3 screws get
stuck at different points in each hole. Only
one good hole out of 16
  
  59   Mon Sep 6 14:13:17 2021 CB MLMotors mounted - first attemptMounted both  motors on CARME. Started 
with outside motor.
 20210906_113522.jpg20210906_113519.jpg20210906_115601.jpg20210906_152607.jpg20210906_143944.jpg 
  58   Sat Sep 4 15:54:50 2021 CB RSSMotor mounting preparationPrepared the motors to be mounted and 
found all components required. No issues.
 20210904_162517.jpg20210904_162520.jpg 
  57   Fri Sep 3 15:55:00 2021 CB RSSIssues with cable clampsAttempted to mount cable clamps for strain

relief on inner part of Allectra 
 20210903_154614.jpg20210903_162519.jpg 
  56   Fri Sep 3 14:14:40 2021 TDLeybold IE514 manual & calibration data   20210903_141201.jpgIonivac_Sensors_IE414_IE514.pdf 
  55   Fri Sep 3 08:14:51 2021 CB RSSIssues foreseeable splitting CARMEIn order to install the detector supports

and eventually install the detectors 
 7x 