|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
CARME, Page 30 of 33 |
 |
|
Sun Sep 19 09:11:34 2021, CB (remotely), Baking RasPi status
|
Fri Sep 17 16:42:25 2021, JM RSS ML + OG, CARME Realignment + Thermocouple installation 8x
|
Thu Sep 16 15:24:29 2021, JM RSS, CARME vented + thermocouple feedthrough  
|
Sat Sep 11 16:01:44 2021, CB RSS, Preparations for shutdown 
|
Fri Sep 10 18:09:14 2021, CB RSS ML, Leak test + baking system test
|
Fri Sep 10 10:50:55 2021, CB RSS ML, Pressure after overnight pump down
|
Thu Sep 9 13:01:07 2021, CB RSS + OG, All feedthrough flanges mounted and motor rotated   
|
Wed Sep 8 17:03:07 2021, CB RSS + OG NB, Six feedthrough flanges mounted 23x
|
Wed Sep 8 10:52:54 2021, CB RSS + OG, First feedthrough flange mounted    
|
Tue Sep 7 14:10:02 2021, CB RSS + OG, Strain relief SS support re-drilled
|
Tue Sep 7 12:40:43 2021, CB ML + RH, CARME survey preparation
|
Tue Sep 7 11:37:05 2021, CB RSS + OG, Update on strain relief screw issues
|
Mon Sep 6 14:13:17 2021, CB ML, Motors mounted - first attempt    
|
Sat Sep 4 15:54:50 2021, CB RSS, Motor mounting preparation 
|
Fri Sep 3 15:55:00 2021, CB RSS, Issues with cable clamps 
|
Fri Sep 3 14:14:40 2021, TD, Leybold IE514 manual & calibration data 
|
Fri Sep 3 08:14:51 2021, CB RSS, Issues foreseeable splitting CARME 7x
|
Fri Sep 3 08:12:39 2021, CB RSS, Pressure after overnight pump down 
|
Thu Sep 2 21:04:26 2021, CB RSS ML + DR OG, Gate valves mounted + pump down 6x
|
Thu Sep 2 10:41:16 2021, CB RSS + DR OG, CARME connected to the CRYRING
|
|