  54   Fri Sep 3 08:12:39 2021 CB RSSPressure after overnight pump down03.09.2021   09:00   5.27E-7 mbar     
03.09.2021   13:00   4.08E-7 mbar       
           
 20210903_085646.jpgIMG_4487.JPG 
  53   Thu Sep 2 21:04:26 2021 CB RSS ML + DR OGGate valves mounted + pump downMounted both gate valves and support. Gate

valves could not be installed one bolt 
 6x 
  52   Thu Sep 2 10:41:16 2021 CB RSS + DR OGCARME connected to the CRYRINGConnected CARME to the CRYRING via tube 
plus bellows. See attach.
 20210902_114031.jpg 
  51   Wed Sep 1 17:14:16 2021 CB RSS + DR MLCARME mounted on the CRYRINGLifted CARME with Al support on the 
CRYRING. No issues during transportation.
 20210901_162435.jpg20210901_173059.jpg20210901_174157.jpg20210901_134635.jpg20210901_173059.jpg 
  50   Wed Sep 1 12:05:28 2021 CB RSSPreparation for CARME on CRYRING YR09Mounted additional cross member for motor

support. See attach 1
 20210901_125504.jpg20210901_125517.jpg 
  49   Tue Aug 31 18:56:35 2021 CBCARME status(ELOG does not allow more pictures to be added
to previous entry)
 9x 
  48   Tue Aug 31 18:34:41 2021 CB RSS + DR OGCARME on Al standLifted CARME off the floor and mounted feet
on sides. It was found impossible to put
four bolts for each foot
 20210831_144545.jpg20210831_171442.jpg20210831_171447.jpg20210831_171449.jpg20210831_171453.jpg 
  47   Tue Aug 31 11:55:11 2021 CB RSSLast preparations for CARME liftFound strut bolts in the bag with 
spherical washers. Mounted the struts and
 16304077162843806956479048661374.jpg16304077904321905824276870110392.jpg 
  46   Tue Aug 31 07:09:54 2021 CB RSS (rem) JMPreparation for mounting(30 August 2021)

The current state of YR09 is as per attach
 6x 
  45   Wed Aug 25 07:02:41 2021 RSS TD25-31 August
Pirani  IE514
mbar    mbar


25/8/21
08:00 0.0030 1.86e-8

----------------------------------------------------

26/8/21   09:00 
 19x 
  44   Wed Aug 18 11:58:49 2021 NTD RSSMisc fittings and fasteners plus gasket inventoryAttachments 1-3 fasteners, fittings found
amongst earlier shipments. I assume that
the STFC DL cleaned items are for the internal
 22x 
  43   Wed Aug 18 07:07:26 2021 RSS TD18-24 August
Pirani  IE514
mbar    mbar


18/8/21
08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032
3.72e-8


 
 25x 
  42   Fri Aug 13 07:28:37 2021 RSS TDFriday 13-17 August Pirani  IE514
mbar    mbar
 23x 
  41   Thu Aug 12 09:16:42 2021 TD RSSThursday 12 August
Attachment 1 - IE414/514 feedthrough wiring
diagram
 13x 
  40   Wed Aug 11 12:30:40 2021 TD RSSWednesday 11 August
Attachments 1 & 2 - 2x SAES D-2000 re-fitted
to side ports
 8x 
  39   Tue Aug 10 12:22:56 2021 TD RSSTuesday 10 August
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests
 20210810_115555.jpg20210810_115607.jpg20210810_115617.jpg 
  38   Mon Aug 9 12:36:00 2021 TD, RSS, ABDMonday 9 August
Attachments 1-5 - CARME shipment in CRYRING
hall
 7x 
  37   Mon Dec 7 14:29:12 2020 JMCARME packing up   20201207_122353.jpg20201207_113905.jpg20201207_110714.jpg 
  36   Fri Dec 4 16:49:36 2020 TDFriday 4 December   7x 
  35   Wed Nov 25 10:39:37 2020 TDWednesday 25 November
10.39
 7x 