AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME, Page 31 of 33
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
654 Entries
Goto page
Previous
1
,
2
,
3
...
30
, 31,
32
,
33
Next
ID
Date
Author
Subject
Text
54
Fri Sep 3 08:12:39 2021
CB RSS
Pressure after overnight pump down
03.09.2021 09:00 5.27E-7 mbar
03.09.2021 13:00 4.08E-7 mbar
53
Thu Sep 2 21:04:26 2021
CB RSS ML + DR OG
Gate valves mounted + pump down
Mounted both gate valves and support. Gate
valves could not be installed one bolt
6x
52
Thu Sep 2 10:41:16 2021
CB RSS + DR OG
CARME connected to the CRYRING
Connected CARME to the CRYRING via tube
plus bellows. See attach.
51
Wed Sep 1 17:14:16 2021
CB RSS + DR ML
CARME mounted on the CRYRING
Lifted CARME with Al support on the
CRYRING. No issues during transportation.
50
Wed Sep 1 12:05:28 2021
CB RSS
Preparation for CARME on CRYRING YR09
Mounted additional cross member for motor
support. See attach 1
49
Tue Aug 31 18:56:35 2021
CB
CARME status
(ELOG does not allow more pictures to be added
to previous entry)
9x
48
Tue Aug 31 18:34:41 2021
CB RSS + DR OG
CARME on Al stand
Lifted CARME off the floor and mounted feet
on sides. It was found impossible to put
four bolts for each foot
47
Tue Aug 31 11:55:11 2021
CB RSS
Last preparations for CARME lift
Found strut bolts in the bag with
spherical washers. Mounted the struts and
46
Tue Aug 31 07:09:54 2021
CB RSS (rem) JM
Preparation for mounting
(30 August 2021)
The current state of YR09 is as per attach
6x
45
Wed Aug 25 07:02:41 2021
RSS TD
25-31 August
Pirani IE514
mbar mbar
25/8/21
08:00 0.0030 1.86e-8
----------------------------------------------------
26/8/21 09:00
19x
44
Wed Aug 18 11:58:49 2021
NTD RSS
Misc fittings and fasteners plus gasket inventory
Attachments 1-3 fasteners, fittings found
amongst earlier shipments. I assume that
the STFC DL cleaned items are for the internal
22x
43
Wed Aug 18 07:07:26 2021
RSS TD
18-24 August
Pirani IE514
mbar mbar
18/8/21
08:00 0.0034 3.90e-8
18/8/21 17:00 0.0032
3.72e-8
25x
42
Fri Aug 13 07:28:37 2021
RSS TD
Friday 13-17 August
Pirani IE514
mbar mbar
23x
41
Thu Aug 12 09:16:42 2021
TD RSS
Thursday 12 August
Attachment 1 - IE414/514 feedthrough wiring
diagram
13x
40
Wed Aug 11 12:30:40 2021
TD RSS
Wednesday 11 August
Attachments 1 & 2 - 2x SAES D-2000 re-fitted
to side ports
8x
39
Tue Aug 10 12:22:56 2021
TD RSS
Tuesday 10 August
Attachments 1-3 - 2 of 4 SAES D2000 installed
at same ports used for STFC DL XHV tests
38
Mon Aug 9 12:36:00 2021
TD, RSS, ABD
Monday 9 August
Attachments 1-5 - CARME shipment in CRYRING
hall
7x
37
Mon Dec 7 14:29:12 2020
JM
CARME packing up
36
Fri Dec 4 16:49:36 2020
TD
Friday 4 December
7x
35
Wed Nov 25 10:39:37 2020
TD
Wednesday 25 November
10.39
7x
Goto page
Previous
1
,
2
,
3
...
30
, 31,
32
,
33
Next
ELOG V3.1.4-unknown