  34   Tue Nov 24 12:24:01 2020 JMRGA scansRGA laptop passcode: tw%11&STA-
  

RGA scans set up and plotting data
 20201124_124107.jpg 
  33   Tue Nov 10 12:25:29 2020 JMCable harnessesThe length of the wire needed was estimated
with the aid of a scale image of the detectors
in the CARME chamber and foam model pieces.
 20201102_155336.jpgFigure_1.png20201102_154648.jpgPhotos.zip 
  32   Thu Oct 29 08:02:29 2020 CB, JM (remotely)CARME pressureAttached is the temperature plot for bakeout
period including tags for NEG activation
etc.
 20201029_080001.jpgBakeout_pump_down.png20201119_temps.png 
  31   Wed Oct 28 10:41:57 2020 TDWednesday 28 October
10.32
 6x 
  30   Mon Oct 26 10:35:05 2020 JM, CB(remotely)Cooling10:10 Pressure on the chamber = 3.1e-8mbar.
RE-72 temperatures are ~120-125C with set
limits at 80C. D2000 temperatures are
 Screenshot_from_2020-10-26_14-10-08.png20201027_0803_temps.png27102020_pump_down.png27102020_pump_down.png 
  29   Thu Oct 22 22:15:00 2020 CB (remotely)Cooling down after first NEG activationThu 22 October

22:15 Temperatures stables, slowly decreasing.
 7x 
  28   Thu Oct 22 10:39:40 2020 TDThursday 22 October
10.40
 19x 
  27   Mon Oct 19 13:57:52 2020 JMNeg ActivationNeg and Neg-Ion pumps have been connected
up to the control modules. Controller on
the right is connected to the D-2000s. Middle
 Photos.zip20201019_154921.jpg 
  26   Mon Oct 12 10:49:36 2020 JMFirst Bakeout of CARME with pumps (cont)12 October 

10:00 Bakeout temperatures stable.
Pressure on the backing line is 3e-7mbar
 temp6.png 
  25   Mon Oct 5 08:21:40 2020 CB (remotely), JMFirst bake of CARME with pumps (cont.)5 OCTOBER

08:21 Temperatures stable overnight. See
 6x 
  24   Wed Sep 30 08:10:36 2020 CB (remotely)First bake of CARME with pumps(NOTE: Raspberry Pi internal clock appears
to be on GMT, rather than GMT+1 due to daylight
saving.)
 19x 
  23   Mon Sep 28 13:04:27 2020 JMBakingI have (fingers crossed) got the baking
stepping up nicely now. I have used some
of the outer shell to act as a shield and
 20200928_081831.jpg20200928_130239.jpg 
  22   Sat Sep 26 09:31:46 2020 JM, CB (both remotely)Baking over weekendSat 26 Sep

09:15 Baking started automatic
mode
 temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png 
  21   Fri Sep 25 12:58:33 2020 JMFriday 25/09/2010:00   Vessel P = 3.99e-8 mbar, 
RGA P = 1.4e-6 mbar 

10:54   Vessel P = 3.89e-8
 Photos.zip 
  20   Thu Sep 24 10:04:58 2020 JM, TDThursday 24 September
Following overnight pumping by Leybold turbo
pump
 20200924_152852.jpgPhotos.zip 
  19   Wed Sep 23 13:34:32 2020 JM, TDWednesday 23 September
Connected Leybold Ionivac IE514 to Leybold
Combivac CM52 Vacuum Gauge Controller
 20200923_170441.jpg20200923_170455.jpg20200923_170415.jpg20200923_161415.jpg20200923_161402.jpg 
  18   Wed Sep 23 13:34:04 2020 JMTuesday 22 SeptemberTurbo-pump Issue approximately 13:00 22/9/20.

While moving the baking octagon
into position, the power connector became
  
  17   Mon Sep 21 09:51:57 2020 JMCARME StatusCooling of baking volume finished over
the weekend, attached are some plots of the
bakeout test. Bakeout2.png is the thermocouple
 Graphs.zip 
  16   Fri Sep 18 10:28:57 2020 JM, CB(remotely)Baking status10:28
Reducing temperature in steps. System cooling
down. See attached.
 20200918_1029_temps.png 
  15   Thu Sep 17 10:13:43 2020 JM, CB(remotely)Bakeout cooling and pumping of chamberThe Chamber has continued to pump overnight
and we have reached a pressure of 3.3e-6
mbar as of 10:15. Power cable for the hot
 Photos.zip20200917_1428_temp_last.png 