212
|
Sat Feb 19 14:51:58 2022 |
JM, CB | Burst high energy noise | Noticed bursts of high energy noise on
aida01 and aida02 during run 47 and 48.
Good events rate jumps from 10-20k |
    |
146
|
Tue Nov 9 15:03:29 2021 |
RSS + OG | Burnt cables issues | Upper part of the frame was mounted. In
order to do so, the valve was closed, turbo
wire and hose were disconnected and then |
7x |
426
|
Sun Jul 23 10:13:48 2023 |
RSS, TD | Building tent | 11.15 Pirani 1.0e-03mbar IE514 2.72e-08mbar
16.35 Pirani 1.0e-03mbar IE514 2.61e-08mbar |
   |
428
|
Tue Jul 25 09:12:15 2023 |
RSS | Building tent |
10:10 IE514 2.0e-08mbar
Upstream
part of the CARME is covered. |
 |
429
|
Wed Jul 26 08:28:09 2023 |
RSS | Building tent |
09:26 IE514 1.96e-08mbar |
   |
493
|
Mon Feb 5 19:43:52 2024 |
CB, TD, ML | BuTIS reference for VETAR2 |
16.40 CB/ML install fibre optic cable from
patch panel beneath dipole downstream of |
  |
125
|
Sat Oct 16 17:25:47 2021 |
RSS TD | Broken detectors | One of the detectors was damaged while
mounting (see pictures 1-3).
Second detector was found already |
    |
185
|
Thu Feb 3 22:05:33 2022 |
JM, TD, OH(remotely) | Bias update and grounding | 9:30 Bias remained stable overnight - 60V
2.95 uA.
10:00 No grounding attached initailly. |
|
465
|
Sat Jan 13 14:25:05 2024 |
CB, JM | Bias tests with all FEEs connected | Connected all FEEs.
The two top fees corresponding
to the bottom right detector are connected |
 |
416
|
Thu Jul 13 00:12:19 2023 |
JM, CB | Bellow replaced | The left (inside ring) bellow for the motors
rod was replaced.
Replacing the bellow involved; |
|
632
|
Fri Jun 14 14:52:02 2024 |
JM | Beam-Target Overlap Scan | The orbit of the beam in the ring was re-configured
so that the beam position is more central.
With the target density at ~6e11 |
 |
606
|
Sun Jun 9 09:45:27 2024 |
JM, CB | Beam-Target Overlap | Target density this morning had stabalised
at 7e11 at/cm2
This is sufficient to test the |
|
722
|
Fri Jun 6 16:49:59 2025 |
CB, AY, ST | Beam overlap results for 200keV and 250keV | For 200keV the optimal horizontal position
is -5mm.
For 250keV the optimal horizontal |
|
522
|
Sat Feb 17 13:21:44 2024 |
JM, CB | Beam on target - motors tests | 14:01
Run 36 started.
We put both detectors to the fully |
  |
270
|
Thu Feb 24 14:31:25 2022 |
JM, ML, CN | Beam Tuning Run 76 | 15:30
1.5 MeV/u beam currently being
tuned |
6x |
226
|
Tue Feb 22 04:09:28 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - first event at 10MeV ! | 05:00
Beam ON ~2E6 pps, still fluctates
between 2e6 and 6e6 (like a step function) |
11x |
228
|
Tue Feb 22 05:47:18 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 - 2 events at 10MeV! | 06:47
Beam ON ~2.0E6 pps, still fluctates
between 1e6 and 6e6 (like a step function) |
11x |
223
|
Tue Feb 22 00:32:35 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 01:30
Beam ON ~6E6 pps
Target ON and open to the ring |
 |
224
|
Tue Feb 22 02:02:11 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 03:00
Beam ON ~7E6 pps
Target ON and open to the ring |
10x |
225
|
Tue Feb 22 03:05:06 2022 |
JM, CB, LV, PM, AK | Beam ON, Target ON Run 54 | 04:00
Beam ON ~5.5E6 pps, but it fluctates
between 2e6 and 6e6 (like a step function) |
9x |
|