Entry  Fri Feb 18 11:07:52 2022, RSS, ML, CB, Alpha background run46 11x
12:00

 

Check Leakage current: (see attachment 4)
Entry  Fri Feb 18 13:03:02 2022, RSS, ML, CB, Alpha background run46 11x
14:00

 

Check Leakage current: (see attachment 4)
Entry  Thu Feb 17 15:09:40 2022, JM,CB,SD, Alpha background run44 8x
16:09

 

Check Leakage current: (see attachment 1)
Entry  Thu Feb 17 08:31:07 2022, RSS, AG, Alpha background run43 11x
09:15

Check Leakage current: (see attachment 2)

Check NewMerger tab: (see attachment 5)
Entry  Thu Feb 17 13:12:19 2022, RSS, AG, Alpha background run43 11x
14:00

 

Check Leakage current: (see attachment 1)
Entry  Wed Feb 16 12:43:05 2022, TP, RSS, Alpha background run40  11x
13:30

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 2)
Entry  Wed Feb 16 08:27:27 2022, TP, RSS, Alpha background run40 11x
09:15

Check Leakage current: (see attachment 1)

Check NewMerger tab: (see attachment 2)
Entry  Tue Feb 15 10:46:37 2022, RSS, LV, CB, Alpha background run37 10x
11:30

Check Fee temperatures: all green (see attachment 1)

Check statistics tab: ADC data items (see attachment 2)
Entry  Sun Feb 13 21:28:35 2022, JM, CB, Alpha background Run 32, 35 6x
Alpha background gathered from 17:35 12/2/22 to 13:44 13/2/22 is run32. Run time ~20 hours. Some alphas visible in aida1 1*L histograms attached.

Noticed grounding of crimps that attched to cryring ground has come loose. Those crimps not ideal for our grounding cable so were loose. Grounding
cable from each fee now meet at a single grounding cable joined by an m3 nut and bolt. This grounding cable then goes to the cryring ground and
Entry  Sun Feb 20 22:04:21 2022, JM, CB, Alpha Background run 50  
Beam OFF. Run started 20/2/22 18:42

Fast comparator threshold HEC set to 0xff for all fees and asics to combat high energy noise bursts.

Electron cooler scalar plugged back into aida03 ~3000 per sec.
Entry  Fri Feb 18 20:31:33 2022, JM, CB, Alpha Background run 48 2022-02-19_14-45-25-leage-current.png
Alpha background started with beam ON - run47. Run started 16:49 18/2/22   (beam subsequently found to be OFF)

Beam energy 4 keV, beam lifetime ~ 100 ms

Noticed aida01 and aida02 were showing increased good event rates to ~250,000, effect seen on spectrum browser and data writing rate increased
Entry  Thu Feb 17 18:19:16 2022, JM, CB, SD, Alpha Background run 46 2022-02-17_22-41-45-leakageCurrent.png2022-02-17_22-51-07-aida1-3*L.png2022-02-17_22-54-06-XYTotal.png2022-02-17_22-56-38-ExHist.png
Both GSI vacuum group and edinburgh ion gauges OFF

Fees power cycled. All system checks OK.

Writing to file, alpha background overnight.
Entry  Thu Sep 9 13:01:07 2021, CB RSS + OG, All feedthrough flanges mounted and motor rotated 20210909_111933.jpg20210909_112120.jpg20210909_112125.jpg20210909_133027.jpg
Moved cables that touched neg pumps. See 
photos. Please bear in mind perspective.
Note avoiding touching chamber 
Entry  Mon May 1 18:21:18 2023, CB, JM, All detectors mounted  20230501_191533.jpg20230501_191511.jpg20230501_145740.jpg
Mounted four detectors on Carme ad well as four cable harnesses.

 

Cables for new, shorter harnesses appear still too long. Likely the model is not correct somehow.
Entry  Tue May 2 15:02:09 2023, CB, JM, All detectors and harnesses mounted  20230502_153410.jpg20230502_153503.jpg20230502_153509.jpg20230502_153511.jpg
Completed mounting harnesses and detectors.

The strain relief support for the bottom most two detectors on the feedthrough side was not mounted because we could not find enough MACOR parts
and mounting flanges. We cannot find them in GSI, possibly they are somewhere not obvious in Edinburgh.
Entry  Thu Jan 11 19:57:20 2024, CB, JM, All FEE holders mounted 
After discussions with Davide, changed the holes in the FEE holders for the bottom-right detector to slots in order to slightly change the angle that
the FEE inserts into the flexi rigid PCB. This was sufficient, with some difficulties, to insert both FEEs into the flexi rigid.

Attempted to finally mount the last two fees, the top two for the bottom-right detector, which should have been very easy. Somehow managed to
Entry  Wed Feb 7 13:50:20 2024, Elena Hanu, Carlo Bruno, Michael Lestinsky, Afternoon shift Screenshot_from_2024-02-07_14-53-36.pngScreenshot_from_2024-02-07_14-56-37.pngScreenshot_from_2024-02-07_14-51-21.png
14:50

 

Temperature, Statistics fine (see screenshots).
Entry  Thu Jan 13 10:33:24 2022, JM, OH, TD, Adaptor Board misallignment 20220112_160951.jpg20220113_145105.jpg20220113_145147.jpg
The ERNI connector is not central on the adaptor boards causing misallignment with the FEE. 

The adaptor board is 80mm long. The ERNI connector is 50mm long. The connector is 13mm from the 2x Lemo side and 17mm from the 3x Lemo side.
This results in misallignment between the FEE and adaptor board. 
Entry  Mon Oct 4 09:19:11 2021, JM RSS, Activation of NEG elements IMG_4880.JPGIMG_4881.JPGIMG_4882.JPGIMG_4883.JPG
9:30

Ion pumps de-gassed by switching on and off multiple times. Large pressure increase the first time pumps were flashed, pressure recovers quickly
once pumps off. Subsequent flashing of ion pumps showed a significantly smaller pressure increase, unitl little increase was seen. 
Entry  Thu Jan 27 15:24:02 2022, OH, JM, Access to Motors PI 
1. ssh <user>@lxpool.gsi.de
2. ssh <user or carme>@atppc022.gsi.de
3. ssh pi@CARMEmotorspi (Standard npg password)