580
|
Mon Jun 3 11:46:07 2024 |
SD, SHB, JM, CN, EM | Run 27 | 12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV |
12x |
579
|
Mon Jun 3 08:43:22 2024 |
SD, SHB | Run 26 | 09:44
Run 26 started - Beam no target
Beam energy is being increased |
8x |
578
|
Sun Jun 2 23:38:17 2024 |
JM, EM | Run 25 | 00:38
Run 25 started - Beam on target
Beam energy = 1.5 MeV. |
32x |
577
|
Sun Jun 2 22:46:47 2024 |
JM, EM, NP | Run24 | 23:47
Run 24 started - Beam on target
Beam energy is 1.5 MeV. |
  |
576
|
Sun Jun 2 14:30:16 2024 |
TD | Offline analysis G22-201/R22_0 - R22_11 | Offline analysis data file G22-201/R22_0 to
R22_11
|
8x |
575
|
Sun Jun 2 13:04:41 2024 |
JM, AG, CB, DR | Run 23 - vertical beam position and beam lifetime tests | 14:05
Run 22 stopped. Run 23 started
we will now adjust the vertical beam position |
|
574
|
Sun Jun 2 08:47:01 2024 |
CB, AG | Run 22 - longer rung with 20 min storage | 09:47
12 seconds pre acc
200x cycles |
    |
573
|
Sun Jun 2 06:41:00 2024 |
CB, AG | Run 21 - tests | 07:41
Switching to bunched beam to check
D vs H content. |
10x |
572
|
Sat Jun 1 21:56:17 2024 |
JM, EM, EM, TY, CB, AG | Run 20 | 22:56
Run 20 started - beam on target
Beam energy is 1.5 MeV. Horizontal |
18x |
571
|
Sat Jun 1 16:38:13 2024 |
TD | Offline analysis G22-201/R17 | Offline analysis data file G22-201/R17
Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
|
8x |
570
|
Sat Jun 1 13:33:50 2024 |
TD | Offline analysis APR24/R3 (alpha background) |
Offline analysis data file APR24/R3 (alpha
background)
|
9x |
569
|
Sat Jun 1 07:16:15 2024 |
CB, AB, EM, JM | Run 19 - beam target overlap | Morning shift
08:16 - as run 18, target off
9:00 Increased storage time to |
19x |
568
|
Fri May 31 21:53:20 2024 |
CB EM, JM,EM AB | Overnight beam tests | 22:53
Run 15 started
Beam tests. We increased the storage |
17x |
567
|
Fri May 31 21:03:21 2024 |
CB, EM | Run14 | 22:03
Before this run we checked quickly
beam with the target on but it does not make |
  |
566
|
Fri May 31 19:12:01 2024 |
CB, EM | Run 13 - test with beam | 20:00
The beam is set at the correct
energy, operators cross-checked it again. |
  |
565
|
Fri May 31 06:01:55 2024 |
JM, TY, PW, EM, CB | Run 12 - beam on target | 07:00
Run 12 started. D+ beam is incident
on the target at 1.5 MeV |
12x |
564
|
Thu May 30 13:31:01 2024 |
JM, CB, PW, YL | Run 11 - beam on target overlap | 14:30
Run 11 started. D+ beam in the
ring at 1.5 MeV. |
   |
563
|
Thu May 30 09:30:33 2024 |
CB, PW, YL, TD | Run 10 | 10:30
Merger OK, Tape server OK
ADC data item statistics looks |
13x |
562
|
Thu May 30 08:33:21 2024 |
CB, PW, YL | Run 8 & 9- detector motion tests | 09:34 - Moved to Run 9 in preparation of
moving detectors. No target yet. Beam in
the ring at 750 keV/A. |
7x |
561
|
Thu May 30 07:25:53 2024 |
Yuri, Phil, Nikos | Gas target | The cave is closed and beam is back
The d intensity is about half of
the intensity before the break |
|
|